IRCTC Portal

Search Engine for Indian Railway

RAILWAY

Chenab Bridge 2022

Salient Features of the Arch of the iconic Chenab Bridge Railways complete the Arch closure of the iconic Chenab Bridge, World’s highest Railway Bridge The Arch looms over Chenab, flowing 359 metres below Arguably the biggest civil-engineering challenge faced by any railway project in India in recent history Major Leap towards completion of the Katra- […]

Fire Safety Protocol-Switching off Electrical equipment while leaving office

Fire Safety Protocol-Switching off Electrical equipment while leaving office Government of India Ministry of Railways (Railway Board) CIRCULAR Sub: Fire Safety Protocol-Switching off Electrical equipment while leaving office-Reg: All officers and staff of Railway Board are requested to ensure switching off all electric/electronic equipments and appliances (including lights, fans UPS, Window ACs, Exhaust fan, Photostat […]

Railway Reopening of Retiring Rooms at Stations

Railway Reopening of Retiring Rooms at Stations Ministry of Railways accords permission to Zonal Railways to decide on reopening of retiring rooms at Stations. They should keep in view local condition including Covid related protocols These convenience were discontinued post announcement of lockdown to prevent the spread of COVID 19 Ministry of Railways has accorded […]

Revised Model Schedule of Power

Indian Railway: Revised Model Schedule of Power Latest Schedule of Powers Indian Railways 2021 Model Schedule of Power (SOP) was issued first time from the Railway Board on October 26, 2017. Subsequently, a need was felt to bring out its revised version, incorporating the correction slips, Railways’ best practices and enhanced delegation of power introduced […]

Introduction of MEMU Train in Bankura – Masagram Newly Electrified Section

Introduction of MEMU Train in Bankura – Masagram Newly Electrified Section Introduction of New Trains between Bankura – Masagram – Bankura MEMU Passenger (Train No. 68151, 68152, 68153, 68154) time table, route, frequency and fare South Eastern Railway has decided to introduce two pairs of Mainline Electric Multiple Unit (MEMU) Trains between Bankura and Masagram […]

Introduction of DEMU Train in Tatanagar – Badampahar

ntroduction of DEMU Train in Tatanagar – Badampahar Introduction of New Trains between Tatanagar and Badampahar DEMU Passenger Train (Train No. 78031 / 78032) time table, route, frequency and fare Keeping in view the demand of the passengers, South Eastern Railway hasdecided to run DEMU Train between Tatanagar and Badampahar w.e.f. 23.02.2021both from Tatanagar and […]

Railway Electrification New Line Between Manigram – Nimtita

Railway Electrification New Line Between Manigram – Nimtita Improving Safety & Speed in Sonar Bangla: Railway infrastructure projects will be dedicated to West Bengal on 17-02-2021 Improving Safety & Speed with modern infrastructure Dedication of the Nation of Road Under bridge at Malda and Manigram Foot Over bridge at Khagraghat Road, Sujnipara, Basudebpur, Lalbagh Court […]

Newly Constructed 3rd Rail Line between Kalaikunda – Jhargram Railway Stations

Newly Constructed 3rd Rail Line between Kalaikunda – Jhargram Railway Stations COMMISSIONER OF RAILWAY SAFETY INSPECTES NEWLY CONSTRUCTED THIRD LINE BETWEEN KALAIKUNDA – JHARGRAM Commissioner of Railway Safety, South Eastern Circle inspected the newly constructed 3rd line between Kalaikunda – Jhargram stations of Kharagpur – Adityapur 3rd line project in Kharagpur Division today (09.02.2021). A […]

Advance Reservation Period for Train Ticket Booking

Advance Reservation Period for Train Ticket Booking Advance Reservation Period for Special Trains – Advance Reservation Period IRCTC for Special Train Advance Reservation Period of Select Special Trains increased from 10 days to 120 days Railways have earlier announced 10 days as the Advance Reservation Period (ARP) for booking of tickets in select special trains. […]

Scroll to top