{"id":8785,"date":"2025-07-26T09:54:07","date_gmt":"2025-07-26T09:54:07","guid":{"rendered":"https:\/\/railtravels.org\/?p=8785"},"modified":"2025-07-26T09:54:07","modified_gmt":"2025-07-26T09:54:07","slug":"east-coast-railway-new-time-table-2022-23","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/east-coast-railway-new-time-table-2022-23\/","title":{"rendered":"East Coast Railway New Time Table 2025-23"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>East Coast Railway New Time Table 2025-23<\/strong><\/p>\n<p><strong>ECoR NEW TIME TABLE FROM 1ST OCTOBER, 2025<\/strong><\/p>\n<p><strong>MAJOR CHANGES IN TIMINGS with effect from 1st October, 2025:<\/strong><\/p>\n<p>Timings of many Trains have been changed to before &amp; after the earlier scheduled timings.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-8786 size-full\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2022\/10\/East-Coast-Railway-New-Time-Table-2022-23-1.jpg\" alt=\"\" width=\"638\" height=\"1280\" srcset=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2022\/10\/East-Coast-Railway-New-Time-Table-2022-23-1.jpg 638w, https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2022\/10\/East-Coast-Railway-New-Time-Table-2022-23-1-150x300.jpg 150w, https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2022\/10\/East-Coast-Railway-New-Time-Table-2022-23-1-510x1024.jpg 510w\" sizes=\"auto, (max-width: 638px) 100vw, 638px\" \/><br \/>\n<strong>For detailed timetable and stops for all trains, visit www.enquiry.indianrail.gov.in or download the NTES app.<\/strong><\/p>\n<p>Here\u2019s a verified summary of the <strong>East Coast Railway (ECoR) changes to the 2025 train timetable (TAG 2025)<\/strong>\u2014covering revised train numbers and running times affecting East Coast routes across Odisha, Andhra Pradesh, and Tamil Nadu:<\/p>\n<hr \/>\n<h2>\ud83d\uddd3\ufe0f New Schedule Effective from 1 January 2025<\/h2>\n<ul>\n<li>As part of the national <strong>\u201cTrains at a Glance 2025\u201d<\/strong>, several <strong>ECoR Mail\/Express trains have been renumbered or had timings revised<\/strong>. These changes apply to services passing through key East Coast stations like Bhubaneswar, Palasa, and Brahmapur.([turn0search7]\ue202turn0search8]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udd22 Train Renumbering (East Coast Services)<\/h2>\n<p>Effective from early March 2025:<\/p>\n<table>\n<thead>\n<tr>\n<th>Route<\/th>\n<th>Old Train No.<\/th>\n<th>New Train No.<\/th>\n<th>Effective Date<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Bhubaneswar \u2194 Rameswaram<\/td>\n<td>20896 \/ 20895<\/td>\n<td>20849 \/ 20850<\/td>\n<td>7\u20139 March 2025<\/td>\n<\/tr>\n<tr>\n<td>Bhubaneswar \u2194 Puducherry<\/td>\n<td>12898 \/ 12897<\/td>\n<td>20851 \/ 20852<\/td>\n<td>4\u20135 March 2025<\/td>\n<\/tr>\n<tr>\n<td>Bhubaneswar \u2194 Chennai Central<\/td>\n<td>12830 \/ 12829<\/td>\n<td>20853 \/ 20854<\/td>\n<td>6\u20137 March 2025<\/td>\n<\/tr>\n<tr>\n<td>([turn0search7]\ue201)<\/td>\n<td><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\u23f1 Timings Revised at Key East Coast Stations<\/h2>\n<p>From <strong>1 January 2025<\/strong>, certain superfast trains now arrive and depart <strong>earlier<\/strong> by several minutes at stations like <strong>Palasa<\/strong> and <strong>Brahmapur<\/strong>:<\/p>\n<ul>\n<li><strong>Train 12659 (Nagercoil\u2013Shalimar Weekly SF)<\/strong> &amp; <strong>22641 (Thiruvananthapuram\u2013Shalimar Bi\u2011Weekly SF)<\/strong> now arrive at Palasa by <strong>00:32\u201300:34<\/strong> (earlier by 14\u201316 min); same adjustment at Brahmapur.<\/li>\n<li><strong>15227 (SMVT Bengaluru\u2013Muzaffarpur Weekly Express)<\/strong> and <strong>12507 (Thiruvananthapuram\u2013Silchar Aronai Express)<\/strong> also see similar schedule shifts.<\/li>\n<li>These timing adjustments are limited strictly to these stations; other station schedules remain unchanged.([turn0search8]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\ude82 Notable East Coast Rakes &amp; Routes<\/h2>\n<ul>\n<li><strong>Visakhapatnam\u2013Secunderabad Vande Bharat Express<\/strong> (Train Nos. 20833\/20834), operated by ECoR, continues six days a week with a journey time of ~8h30m and features systems like Kavach.([turn0search16]\ue201)<\/li>\n<li><strong>Puri\u2013Rourkela Mini Vande Bharat Express<\/strong> (20835\/20836) also runs six days weekly with about 7h45m travel time.([turn0search18]\ue201)<\/li>\n<li><strong>East Coast Express (18045\/46)<\/strong> now terminates at <strong>Charlapalli (Hyderabad)<\/strong> instead of Hyderabad Deccan, as of <strong>June 2025<\/strong>, to decongest stations.([turn0search19]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\u2705 Summary of Impacts<\/h2>\n<ul>\n<li><strong>Train numbers<\/strong> for several popular ECoR routes have changed in early March 2025.<\/li>\n<li><strong>Schedules at Palasa &amp; Brahmapur<\/strong> have been revised: many superfast trains now arrive earlier.<\/li>\n<li><strong>Major Vande Bharat services<\/strong> (VSKP\u2013SC\/ROU) continue with consistent frequency and features.<\/li>\n<li><strong>East Coast Express<\/strong> has had a terminal revision to Charlapalli from June 2025.<\/li>\n<li>Most <strong>local and MEMU\/EMU services<\/strong> remain unaffected by the TAG 2025 changes in this zone.<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udccd Passenger Advisory<\/h2>\n<p>For accurate, updated schedules:<\/p>\n<ul>\n<li>Use apps like <strong>RailOne, NTES<\/strong>, or <strong>IRCTC train enquiry<\/strong>\u2014they reflect all confirmed TAG\u20112025 changes.<\/li>\n<li>Heading to or from stations like Palasa or Brahmapur? <strong>Allow for advance or revised arrival times<\/strong>, especially for long-distance superfast train travel.<\/li>\n<li>Calling <strong>139<\/strong> is useful for last-minute confirmation of timings, especially during first weeks of January or March 2025.<\/li>\n<\/ul>\n<hr \/>\n<p>Would you like help checking the revised timing or train number for a specific route or station in East Coast Railway?<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>East Coast Railway New Time Table 2025-23 ECoR NEW TIME TABLE FROM 1ST OCTOBER, 2025 MAJOR CHANGES IN TIMINGS with effect from 1st October, 2025: Timings of many Trains have been changed to before &amp; after the earlier scheduled timings. For detailed timetable and stops for all trains, visit www.enquiry.indianrail.gov.in or download the NTES app. [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[39],"class_list":["post-8785","post","type-post","status-publish","format-standard","hentry","category-new-time-table","tag-new-time-table"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/8785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=8785"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/8785\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=8785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=8785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=8785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}