{"id":8777,"date":"2025-07-26T09:48:08","date_gmt":"2025-07-26T09:48:08","guid":{"rendered":"https:\/\/railtravels.org\/?p=8777"},"modified":"2025-07-26T09:48:08","modified_gmt":"2025-07-26T09:48:08","slug":"south-eastern-railway-new-time-table-2022-23","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/south-eastern-railway-new-time-table-2022-23\/","title":{"rendered":"South Eastern Railway New Time Table 2025-23"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>South Eastern Railway New Time Table 2025-23<\/strong><\/p>\n<p><strong>SOUTH EASTERN RAILWAY REVISED TIMINGS OF SER\u2019S TRAINS WITH EFFECT FROM 01.10.2025<\/strong><\/p>\n<p>South Eastern Railway, after reviewing the running of Trains has decided to revise the timings of the following trains programmed to run towards different important stations considering the infrastructural developments undertaken in recent time. The trains with revised timings are given as under:-<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"48\"><strong>Train \u00a0no.<\/strong><\/td>\n<td width=\"235\"><strong>Train Name<\/strong><\/td>\n<td width=\"198\"><strong>Revised timings \u00a0w.e.f \u00a001\/10\/2025 From Originating Station<\/strong><\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure \u00a0Timings from Howrah<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">12863<\/td>\n<td width=\"235\">\u00a0Howrah \u2013 Sir M Visvesvaraya Terminal (Bengaluru) Express<\/td>\n<td width=\"198\">22.55 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">12867<\/td>\n<td width=\"235\">Howrah \u2013 Puducherry Express<\/td>\n<td width=\"198\">23.25 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">12834<\/td>\n<td width=\"235\">Howrah \u2013 Ahmedabad Express<\/td>\n<td width=\"198\">23.40 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Shalimar<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">12102<\/td>\n<td width=\"235\">Shalimar \u2013 Lokmanya Tilak Terminus (Mumbai) Express<\/td>\n<td width=\"198\">21.00 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">12906<\/td>\n<td width=\"235\">Shalimar \u2013 Porbandar Express<\/td>\n<td width=\"198\">21.00 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">22906<\/td>\n<td width=\"235\">Shalimar \u2013 Okha Express<\/td>\n<td width=\"198\">21.00 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">18047<\/td>\n<td width=\"235\">Shalimar \u2013 Vasco Da Gama Express<\/td>\n<td width=\"198\">23.20 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Haldia<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">22329<\/td>\n<td width=\"235\">Haldia \u2013 Asansol Express<\/td>\n<td width=\"198\">14.50 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Tatanagar<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">20815<\/td>\n<td width=\"235\">Tatanagar \u2013 Visakhapatnam Express<\/td>\n<td width=\"198\">07.20 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">18601<\/td>\n<td width=\"235\">Tatanagar \u2013 Hatia Express<\/td>\n<td width=\"198\">12.05 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">13511<\/td>\n<td width=\"235\">Tatanagar \u2013 Asansol Express<\/td>\n<td width=\"198\">13.25 hrs.<\/td>\n<\/tr>\n<tr>\n<td width=\"48\">13302<\/td>\n<td width=\"235\">Tatanagar \u2013 Dhanbad Suvarnarekha Express<\/td>\n<td width=\"198\">13.40 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Rourkela<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">22839<\/td>\n<td width=\"235\">Rourkela \u2013 Bhubaneswar Intercity Express<\/td>\n<td width=\"198\">05.15 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Purulia<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">12884<\/td>\n<td width=\"235\">Purulia \u2013 Howrah Rupasi Bangla Express<\/td>\n<td width=\"198\">15.35 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Adra<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">18004<\/td>\n<td width=\"235\">Adra \u2013 Howrah Express<\/td>\n<td width=\"198\">04.30 hrs.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\" width=\"482\"><strong>Change in Departure\u00a0 Timings from Hatia<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"48\">18616<\/td>\n<td width=\"235\">Hatia \u2013 Howrah Kriya Yoga Express<\/td>\n<td width=\"198\">21.45 hrs.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Source:\u00a0<a href=\"https:\/\/ser.indianrailways.gov.in\/view_detail.jsp?lang=0&amp;dcd=6279&amp;id=0,4,423\" target=\"_blank\" rel=\"noopener\">https:\/\/ser.indianrailways.gov.in\/<\/a><\/p>\n<p><strong>For detailed timetable and stops for all trains, visit www.enquiry.indianrail.gov.in or download the NTES app.<\/strong><\/p>\n<p>Here\u2019s a verified and comprehensive overview of the <strong>South Eastern Railway (SER) New Timetable \u2013 part of the \u201cTrains at a Glance 2025\u201d (TAG\u20112025)<\/strong> schedule changes effective from <strong>1 January 2025<\/strong>, along with key operational updates through mid-2025:<\/p>\n<hr \/>\n<h2>\ud83d\udcc5 Effective Timeline &amp; Scope<\/h2>\n<ul>\n<li>TAG\u20112025 updates came into force on <strong>1 January 2025<\/strong>, reshaping schedules, train frequencies, service origins, and coach operations across SER zones, including Howrah, Tatanagar, Kharagpur, and Rourkela divisions. ([turn0search3]\ue202turn0search8]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\ude86 Key Timetable Changes &amp; Train Updates<\/h2>\n<h3>\u2733\ufe0f Origin-Time Revisions at Key Stations<\/h3>\n<p>At <strong>Tatanagar<\/strong> (starting 1 Jan 2025):<\/p>\n<ul>\n<li>Trains like <strong>18189 Tatanagar\u2013Ernakulam<\/strong> now depart at <strong>05:00<\/strong> (was 05:15).<\/li>\n<li><strong>18113 Tatanagar\u2013Bilaspur<\/strong> moves to <strong>19:00<\/strong> from 19:45.<\/li>\n<li><strong>20891 Tatanagar\u2013Brahmapur<\/strong> altered to 14:30 from 14:50, and more coordinated changes.<br \/>\nAt <strong>Rourkela<\/strong>:<\/li>\n<li>Example: <strong>22839 Rourkela\u2013Bhubaneswar<\/strong> revised to 05:00 (was 05:10); <strong>18125 Rourkela\u2013Puri<\/strong> moves to 08:00 from 08:05.<br \/>\n([turn0search8]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h3>\u23f1 Punctuality-Driven Timing Adjustments<\/h3>\n<ul>\n<li>In June 2025, SER revised the schedule of <strong>186 trains<\/strong> to improve performance amid delays caused by maintenance blocks and congestion in adjacent zones.<\/li>\n<li>Changes impact trains like <strong>Howrah\u2013Tata Steel Express<\/strong>, <strong>Gitanjali Express<\/strong>, <strong>Kriya Yoga Express<\/strong>, <strong>Purulia Express<\/strong>, <strong>Rupashi Bangla Express<\/strong>, <strong>Asansol\u2013Kharagpur MEMU<\/strong>, and others. ([turn0search5]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h3>\ud83e\uddf1 Major Service Disruptions due to Track Work<\/h3>\n<ul>\n<li>From <strong>March to May 2025<\/strong>, SER reported multiple cancellations and train regulations:\n<ul>\n<li><strong>Bilaspur Division<\/strong> saw suspension of multiple services including <strong>Tatanagar\u2013Bilaspur Express<\/strong>, <strong>Howrah\u2013Mumbai Express<\/strong>, <strong>Darbhanga\u2013Secunderabad Express<\/strong>, etc., between <strong>April 10\u201324, 2025<\/strong>. ([turn0search1]\ue201)<\/li>\n<li><strong>Yard remodeling at Santragachi<\/strong> from <strong>30 April\u201318 May 2025<\/strong> led to the cancellation of trains like <strong>Sambalpur\u2013Shalimar Express<\/strong>, <strong>Badampahar Express<\/strong>, <strong>Shatabdi Express<\/strong>, and rerouting of others.([turn0search2]\ue201)<\/li>\n<\/ul>\n<\/li>\n<li>In <strong>early June 2025<\/strong>, maintenance caused:\n<ul>\n<li><strong>Complete cancellation<\/strong> of several MEMU and special trains (e.g., Asansol\u2013Adra MEMU, Jhargram\u2013Dhanbad MEMU).<\/li>\n<li><strong>Segment truncations<\/strong> (e.g. Tatanagar\u2013Barabhum MEMU operated only between Tatanagar\u2013Adra; other sections cancelled).<\/li>\n<li><strong>Diversions<\/strong> for trains like <strong>Puri\u2013Anand Vihar Express<\/strong> and <strong>Tata\u2013Hatia Express<\/strong>.<\/li>\n<li><strong>Delayed departures<\/strong> of Kharagpur\u2013Hatia Express (by ~2 hours) on specific dates.<br \/>\nThese disruptions spanned <strong>02\u201308 June 2025<\/strong> and require travelers to monitor status closely.([turn0search7]\ue201)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h3>\ud83d\ude84 New Higher-Speed Trains &amp; Vande Bharat Services<\/h3>\n<ul>\n<li>SER introduced or continued services like:\n<ul>\n<li><strong>Howrah\u2013Puri Vande Bharat Express (22895\/22896)<\/strong>, now running with <strong>Vande Bharat 3.0<\/strong> trainsets and <strong>20 coaches<\/strong> from mid-May 2025 to address higher demand. ([turn0search17]\ue201)<\/li>\n<li>Additional Vande Bharat and upgraded regional trains to improve travel experience across the corridor. ([turn0search3]\ue201)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udcdd Reservation Chart Timings Updated (from 10 July 2025)<\/h2>\n<ul>\n<li><strong>First reservation charts<\/strong> for SER trains now follow a phased timeline:\n<ul>\n<li><strong>Midnight\u20132\u202fPM departures<\/strong> charted by <strong>8\u202fPM previous day<\/strong><\/li>\n<li><strong>2\u20134\u202fPM departures<\/strong> charted <strong>4 hours before departure<\/strong><\/li>\n<li><strong>Departures after 4\u202fPM<\/strong> charted <strong>6 hours ahead<\/strong><\/li>\n<\/ul>\n<\/li>\n<li>Aimed at improving booking efficiency and reducing passenger last-minute hassles. ([turn0news13]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udc65 Passenger Sentiment &amp; Operational Observations<\/h2>\n<ul>\n<li>Frequent delays (1\u20132 hours) are reported consistently along <strong>Bilaspur\u2013Tatanagar\/Asansol<\/strong> routes\u2014due to higher prioritization of freight traffic in the coal and mineral belt.([turn0reddit22]\ue201)<\/li>\n<li>Critics note occasional slower schedules despite infrastructure upgrades, particularly impacting punctuality-sensitive travelers at stations like Tatanagar.([turn0search6]\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udccb Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Area \/ Feature<\/th>\n<th>Key Changes in TAG\u20112025 Period<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Effective Date<\/td>\n<td><strong>1 January 2025<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Timetable Adjustments<\/td>\n<td>Origin\/departure timing revisions across major trains<\/td>\n<\/tr>\n<tr>\n<td>Punctuality Updates<\/td>\n<td>186 trains schedule revised in June 2025<\/td>\n<\/tr>\n<tr>\n<td>Maintenance Disruptions<\/td>\n<td>Bilaspur, Santragachi &amp; early June work-induced changes<\/td>\n<\/tr>\n<tr>\n<td>New Services<\/td>\n<td>Howrah\u2013Puri Vande Bharat launch &amp; frequency upgrades<\/td>\n<\/tr>\n<tr>\n<td>Reservation Chart Timings<\/td>\n<td>From <strong>10 July 2025<\/strong>, new slot-based chart rules<\/td>\n<\/tr>\n<tr>\n<td>Passenger Concerns<\/td>\n<td>Chronic delays on freight-heavy corridors<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\u2705 Final Takeaway<\/h2>\n<p>The South Eastern Railway\u2019s <strong>TAG\u20112025 timetable<\/strong> includes nuanced changes to train schedules, punctuality adjustments, service cancellations or reroutes during major track works, new Vande Bharat routes, and more structured reservation chart timings. If you travel regularly on SER routes\u2014especially via Tatanagar, Kharagpur or Howrah\u2014it&#8217;s crucial to verify current train status and departure timings via updated platforms like <strong>RailOne<\/strong>, <strong>NTES<\/strong>, <strong>IRCTC enquiry<\/strong>, or by calling <strong>139<\/strong>.<\/p>\n<p>Would you like me to look up the updated schedule or train number for a specific route or service on South Eastern Railway?<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>South Eastern Railway New Time Table 2025-23 SOUTH EASTERN RAILWAY REVISED TIMINGS OF SER\u2019S TRAINS WITH EFFECT FROM 01.10.2025 South Eastern Railway, after reviewing the running of Trains has decided to revise the timings of the following trains programmed to run towards different important stations considering the infrastructural developments undertaken in recent time. The trains [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[39],"class_list":["post-8777","post","type-post","status-publish","format-standard","hentry","category-new-time-table","tag-new-time-table"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/8777","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=8777"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/8777\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=8777"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=8777"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=8777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}