{"id":8183,"date":"2025-07-28T03:56:59","date_gmt":"2025-07-28T03:56:59","guid":{"rendered":"https:\/\/railtravels.org\/?p=8183"},"modified":"2025-07-28T03:56:59","modified_gmt":"2025-07-28T03:56:59","slug":"mega-block-on-19-12-2021","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/mega-block-on-19-12-2021\/","title":{"rendered":"Mega Block on 19-12-2025"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Mega Block on 19-12-2025<\/strong><\/p>\n<p><strong>Mega Block on 19.12.2025 (Sunday)<\/strong><\/p>\n<p>Mega Block Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 19-12-2025 as under \u2013<\/p>\n<p><strong>Chhatrapati Shivaji Maharaj Terminus \u2013 Chunabhatti \/ Bandra Dn harbour line from 11.40 am to 4.40 pm &amp; Chunabhatti \/ Bandra \u2013 Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm<\/strong><\/p>\n<p>Dn Harbour line services to Vashi \/ Belapur \/ Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai \/ Vadala Road from 11.16 am to 4.47 pm and Dn Harbour line services to Bandra \/ Goregaon leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.48 am to 4.43 pm will remain suspended.<\/p>\n<p>Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel \/ Belapur \/ Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon \/ Bandra from 10.45 am to 5.13 pm will remain suspended.<\/p>\n<p>However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.<\/p>\n<p>Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.<\/p>\n<p>On Main Line there is a infrastructure block being operated on 19.12.2025 between Diva and Thane in connection with 5th and 6th Line work.<\/p>\n<p>These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.<\/p>\n<p>Source: https:\/\/cr.indianrailways.gov.in\/<\/p>\n<p>It appears there was <strong>no official mega block scheduled on December\u00a019, 2025<\/strong>, on Mumbai Suburban Central Railway routes such as Thane\u2013Kalva or Diva corridors. Central Railway typically provides advance notice, especially for Sunday\/overnight mega blocks\u2014but <strong>no records or credible announcements refer to a scheduled block on that specific date<\/strong>.<\/p>\n<hr \/>\n<h2>\ud83d\uddd3\ufe0f Mega Block Pattern: Early 2025 (Relevant for context)<\/h2>\n<h3>\ud83d\udd27 Night Mega Blocks (January):<\/h3>\n<ul>\n<li>Blocks conducted on <strong>night of January 12\/13, 19\/20, 24\/25, and February 2\/3<\/strong>, each lasting about <strong>6 hours<\/strong> (11:15 pm \u2013 5:15 am).\n<ul>\n<li><strong>Sections affected<\/strong>: Diva\u2013Vasai Road corridor for bridge girder installations.<\/li>\n<li>Local passenger services between Diva and Vasai were cancelled during these blocks.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>\ud83d\udd27 Daytime Mega Blocks:<\/h3>\n<ul>\n<li><strong>January 12, 2025<\/strong>:\n<ul>\n<li>Block on <strong>Vidyavihar\u2013Thane<\/strong> 5th &amp; 6th lines (8:00 am \u2013 12:30 pm)<\/li>\n<li><strong>Trans-Harbour lines<\/strong> between Thane\u2013Vashi\/Nerul (11:10 am \u2013 4:10 pm)<\/li>\n<li>Mail\/Express trains rerouted via fast\/slow lines with 10\u201315 min delay<\/li>\n<\/ul>\n<\/li>\n<li><strong>June\u00a015, 2025<\/strong>:\n<ul>\n<li>Maintenance on <strong>CSMT\u2013Vidyavihar slow lines<\/strong> (10:55 am \u2013 3:55 pm)<\/li>\n<li><strong>Harbour and Trans\u2011Harbour lines<\/strong> between Panvel\u2013Vashi\/Vashi\u2013Thane affected with special local services provided<\/li>\n<\/ul>\n<\/li>\n<li><strong>July\u00a013, 2025<\/strong>:\n<ul>\n<li>Block between <strong>Thane\u2013Vidyavihar (5th &amp; 6th lines)<\/strong> and <strong>Kurla\u2013Vashi Harbour<\/strong> (morning slots)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>\u2705 Quick Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Date<\/th>\n<th>Corridor \/ Line<\/th>\n<th>Description<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Jan 19, 2025<\/strong><\/td>\n<td>\u2718 No scheduled block<\/td>\n<td>No official notice from Central Railway<\/td>\n<\/tr>\n<tr>\n<td>Jan 19\/20 (night)<\/td>\n<td>Diva\u2013Vasai Night Mega Block<\/td>\n<td>Girder work suspended local services<\/td>\n<\/tr>\n<tr>\n<td>Jan 12, 2025<\/td>\n<td>Seq: Thane\u2013Vidyavihar + Harbour<\/td>\n<td>Slow\u2011line + Trans\u2011Harbour disruptions<\/td>\n<\/tr>\n<tr>\n<td>Jun 15, 2025<\/td>\n<td>CSMT\u2013Vidyavihar + Harbour lines<\/td>\n<td>Multiple corridors under temporary block<\/td>\n<\/tr>\n<tr>\n<td>Jul 13, 2025<\/td>\n<td>Thane\u2013Vidya + Kurla\u2013Vashi<\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\ud83e\udded Traveler Tips<\/h2>\n<ul>\n<li><strong>Planning travel around December 19, 2025?<\/strong> You&#8217;re <strong>clear to proceed<\/strong>\u2014no mega block expected unless an unforeseen maintenance is announced later.<\/li>\n<li><strong>If traveling on Sunday nights or early Mondays<\/strong>, check <strong>Central Railway PR announcements or regional media<\/strong> as they routinely announce recurring maintenance windows.<\/li>\n<li><strong>Always cross-check 24\u201348 hours prior<\/strong> to your travel via NTES or CR PR alerts for last-minute schedule changes.<\/li>\n<\/ul>\n<hr \/>\n<p>Would you like assistance with:<\/p>\n<ul>\n<li>Checking <strong>specific train service status<\/strong> if planning travel around peak passenger hours?<\/li>\n<li>Monitoring Central Railway <strong>public notices or mega\u2011block schedules<\/strong> in advance of your journey?<\/li>\n<li>Suggesting <strong>alternative travel options<\/strong> during potential block periods?<\/li>\n<\/ul>\n<p>Let me know your journey details or station preferences\u2014I&#8217;m here to help plan ahead!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Mega Block on 19-12-2025 Mega Block on 19.12.2025 (Sunday) Mega Block Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 19-12-2025 as under \u2013 Chhatrapati Shivaji Maharaj Terminus \u2013 Chunabhatti \/ Bandra Dn harbour line from 11.40 am to 4.40 pm &amp; Chunabhatti \/ Bandra \u2013 Chhatrapati Shivaji Maharaj [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,8],"tags":[21,9],"class_list":["post-8183","post","type-post","status-publish","format-standard","hentry","category-central-railway","category-mega-block","tag-central-railway","tag-mega-block"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/8183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=8183"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/8183\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=8183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=8183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=8183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}