{"id":6819,"date":"2025-08-04T08:07:48","date_gmt":"2025-08-04T08:07:48","guid":{"rendered":"https:\/\/railtravels.org\/?p=6819"},"modified":"2025-08-04T08:07:48","modified_gmt":"2025-08-04T08:07:48","slug":"new-rail-line-in-jashpur","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/new-rail-line-in-jashpur\/","title":{"rendered":"New Rail Line in Jashpur"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>New Rail Line in Jashpur<\/strong><\/p>\n<p><strong>GOVERNMENT OF INDIA<\/strong><br \/>\n<strong>MINISTRY OF RAILWAYS<\/strong><br \/>\n<strong>LOK SABHA<\/strong><\/p>\n<p>UNSTARRED QUESTION NO: 1555<\/p>\n<p>ANSWERED ON: 27.11.2025<\/p>\n<p><strong>New Railway Line in Jashpur<\/strong><\/p>\n<p><strong>Gomati Sai<\/strong><\/p>\n<p>Will the Minister of RAILWAYS be pleased to state:-<\/p>\n<p>(a) whether any survey has been conducted to start rail services in Jashpur district;<br \/>\n(b) if so, the places between which the said survey has been conducted;<br \/>\n(c) whether the said railway line has been included in the Budget and if so, the details thereof;<br \/>\n(d) whether the said railway line project is not likely to be started; and<br \/>\n(e) if so, the reasons therefor?<\/p>\n<p><strong>ANSWER \u2013 MINISTER OF RAILWAYS AND COMMERCE &amp; INDUSTRY (SHRI PIYUSH GOYAL)<\/strong><\/p>\n<p>(a) to (e) Yes, Sir. Survey for new railway line from Lohardaga to Korba via Gumla was completed in 2025-11. The project was found financially unviable and could not be taken forward. However fresh survey from Lohardaga to Korba has been sanctioned. Survey has been taken up and further consideration of this proposal is possible once survey report becomes available and results thereon are firmed up.<\/p>\n<p>Another survey for new railway line from Ambikapur to Jharsuguda via Sitapur, Batauli, Pathalgaon and Korba was carried out. The project was not found financially viable and could not be taken forward.<\/p>\n<p>Here\u2019s the latest on the <strong>proposed railway line involving Jashpur Nagar (Chhattisgarh)<\/strong>, aimed at connecting it with the Indian Rail network:<\/p>\n<hr \/>\n<h2>\ud83d\udea7 Project Overview: Dharamjaigarh\u202f\u2013\u202fPatthalgaon\u202f\u2013\u202fLohardaga (via Pathalgaon &amp; Jashpur)<\/h2>\n<ul>\n<li>The proposed route involves the <strong>Dharamjaigarh \u2013 Patthalgaon \u2013 Pathalgaon \u2013 Jashpur \u2013 Gumla \u2013 Lohardaga<\/strong> corridor, spanning approximately <strong>240\u202fkm<\/strong>.<\/li>\n<li>Project sanctioned in early 2024 as part of Chhattisgarh\u2013Jharkhand rail expansion efforts. Its cost estimate stands at roughly <strong>\u20b916,000\u202fcrore<\/strong>.<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udccb Current Status (as of mid-2025)<\/h2>\n<h3>\u2705 Final Drone Survey Approved<\/h3>\n<ul>\n<li>In <strong>July 2025<\/strong>, the Railway Ministry issued a <strong>\u20b98 crore tender approval<\/strong> for a <strong>final drone-based survey<\/strong> of the route, indicating renewed project momentum.<\/li>\n<\/ul>\n<h3>\ud83d\uded1 Construction Pending \u2013 Community Opposition<\/h3>\n<ul>\n<li>Despite survey activities, <strong>no construction or land acquisition<\/strong> has commenced. Local villagers in areas like Jashpur have actively <strong>blocked survey teams<\/strong>, demanding fair compensation and clarity on their status as 5th Schedule landholders.<\/li>\n<\/ul>\n<h3>\ud83e\udded Political &amp; Development Advocacy<\/h3>\n<ul>\n<li>Raigarh MP Radheshyam Rathiya and Chhattisgarh CM Viswadeo Sai have formally requested Rail Minister Ashwini Vaishnaw to prioritize this line due to its potential to connect <strong>Pathalgaon, Jashpur Nagar, Gumla<\/strong>, and head toward Jharkhand.<\/li>\n<li>Nation-wide interest sparked: over <strong>300 schoolchildren in Jashpur<\/strong> sent postcards to PM Modi urging for project progress.<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83e\uddfe Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Category<\/th>\n<th>Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Route Length<\/strong><\/td>\n<td>Approx. <strong>240\u202fkm<\/strong><\/td>\n<\/tr>\n<tr>\n<td><strong>Sanctioned<\/strong><\/td>\n<td>Yes (Dharamjaigarh \u2192 Lohardaga corridor)<\/td>\n<\/tr>\n<tr>\n<td><strong>Survey Status<\/strong><\/td>\n<td>Final drone survey completed; tender processed<\/td>\n<\/tr>\n<tr>\n<td><strong>Land Acquisition<\/strong><\/td>\n<td>None initiated<\/td>\n<\/tr>\n<tr>\n<td><strong>Construction Status<\/strong><\/td>\n<td>Yet to start<\/td>\n<\/tr>\n<tr>\n<td><strong>Local Opposition<\/strong><\/td>\n<td>Yes \u2014 communities blocking survey work<\/td>\n<\/tr>\n<tr>\n<td><strong>Strategic Impact<\/strong><\/td>\n<td>Connects Jashpur &amp; Pathalgaon to Jharkhand; supports tribal and economic upliftment<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\ud83d\udd2d What Lies Ahead<\/h2>\n<ol>\n<li><strong>Resolution of Land Issues<\/strong>: Local consent and proper compensation are vital to restart the survey-to-construction process.<\/li>\n<li><strong>Tendering and Contract Award<\/strong>: Pending finalization of DPR, land acquisition, and feasibility clearances.<\/li>\n<li><strong>Development Momentum<\/strong>: With high-level political backing and budgetary sanctions in place, phased construction could begin once social consent is secured.<\/li>\n<\/ol>\n<hr \/>\n<h2>\ud83d\udcac Community Sentiment<\/h2>\n<blockquote><p>\u201cAfter three surveys in 1970, 1980, and during UPA era, project never progressed beyond study\u2026 Now the final drone survey is approved but local resistance is blocking it.\u201d<\/p><\/blockquote>\n<hr \/>\n<h3>\u2705 Final Takeaway<\/h3>\n<ul>\n<li>The <strong>Dharamjaigarh\u2013Lohardaga rail corridor<\/strong>, which includes Jashpur as a pivotal node, is <strong>surveyed and politically approved<\/strong> but <strong>not yet operational<\/strong> due to land challenges and stalled implementation.<\/li>\n<li>Success depends on <strong>community resolution<\/strong>, <strong>DRP approval<\/strong>, and <strong>timely administrative action<\/strong>.<\/li>\n<li>Given its role in linking remote tribal areas to national corridors, it remains a high-impact development pending next steps.<\/li>\n<\/ul>\n<hr \/>\n<p>Would you like help with:<\/p>\n<ul>\n<li>Mapping the proposed route via GIS or alignment diagrams?<\/li>\n<li>Tracking the <strong>DPR or tender timeline<\/strong> for this project?<\/li>\n<li>Locating parliamentary questions or official documents mentioning this line?<\/li>\n<\/ul>\n<p>I\u2019m happy to assist further!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>New Rail Line in Jashpur GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO: 1555 ANSWERED ON: 27.11.2025 New Railway Line in Jashpur Gomati Sai Will the Minister of RAILWAYS be pleased to state:- (a) whether any survey has been conducted to start rail services in Jashpur district; (b) if so, the places [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[48,49,6],"class_list":["post-6819","post","type-post","status-publish","format-standard","hentry","category-railway","tag-new-railway-line","tag-new-railway-projects","tag-railway"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6819","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=6819"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6819\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=6819"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=6819"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=6819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}