{"id":6810,"date":"2025-08-04T08:02:51","date_gmt":"2025-08-04T08:02:51","guid":{"rendered":"https:\/\/railtravels.org\/?p=6810"},"modified":"2025-08-04T08:02:51","modified_gmt":"2025-08-04T08:02:51","slug":"mega-block-on-19th-january-2020","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/mega-block-on-19th-january-2020\/","title":{"rendered":"Mega Block on 19th January 2025"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Mega Block on 19th January 2025<\/strong><\/p>\n<p><strong>Mega Block on 19-01-2025<\/strong><\/p>\n<p>Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on <strong>19 Jan 2025.<\/strong><\/p>\n<p><strong>Matunga-Mulund Up slow line from 11.30 am to 4.00 pm<\/strong><\/p>\n<p><strong>Panvel-Vashi Up and Down harbour lines from 11.30 am to 4.00 pm (Including Nerul\/Belapur-Kharkopar harbour lines)<\/strong><\/p>\n<p>Here are the official details regarding the <strong>Mega Block scheduled on Sunday, January 19, 2025<\/strong>, in Mumbai&#8217;s suburban rail sections:<\/p>\n<hr \/>\n<h2>Mega Block Summary \u2014 <em>Sunday, 19 January 2025<\/em><\/h2>\n<h3>Central Line: <strong>Matunga\u2013Mulund Fast Lines<\/strong><\/h3>\n<ul>\n<li><strong>Time:<\/strong> 11:30\u202fAM to 3:30\u202fPM<\/li>\n<li><strong>Effect on services:<\/strong>\n<ul>\n<li><strong>Down fast line<\/strong> trains departing CSMT between ~10:58\u202fAM and 3:10\u202fPM will be shifted to the <strong>slow line<\/strong> at Matunga, halting at all stations between Matunga and Mulund.<\/li>\n<li>They will rejoin the fast line at Mulund and are expected to arrive about <strong>15 minutes late<\/strong><\/li>\n<li><strong>Up fast line<\/strong> trains departing Thane between ~11:25\u202fAM and 3:27\u202fPM will similarly be diverted to the slow line between Mulund and Matunga, causing a similar delay<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>Trans\u2011Harbour Line: <em>Between Thane and Vashi\/Nerul<\/em><\/h3>\n<ul>\n<li><strong>Time:<\/strong> 11:10\u202fAM to 4:10\u202fPM<\/li>\n<li><strong>Effect on services:<\/strong>\n<ul>\n<li>All <strong>UP and DOWN services<\/strong> during this window are <strong>fully suspended<\/strong><\/li>\n<li><strong>Cancelled services<\/strong> include:\n<ul>\n<li>DN services from Thane to Vashi\/Nerul\/Panvel between ~10:35\u202fAM and 4:07\u202fPM<\/li>\n<li>UP services from Vashi\/Nerul\/Panvel to Thane between ~10:25\u202fAM and 4:09\u202fPM<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>Western Line: <strong>Borivali\u2013Bhayandar UP Fast Line<\/strong><\/h3>\n<ul>\n<li><strong>Time:<\/strong> 9:30\u202fAM to 1:30\u202fPM<\/li>\n<li><strong>Effect on services:<\/strong>\n<ul>\n<li>UP fast line trains between Virar\/Vasai Road and Borivali will be diverted to the <strong>UP slow line<\/strong>, causing some cancellations or delays on fast services during this period<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>Additional Information<\/h2>\n<ul>\n<li><strong>Purpose:<\/strong> Routine engineering and maintenance works including track repair, overhead wiring, and signaling upgrades across multiple lines<\/li>\n<li><strong>Night mega blocks:<\/strong> Other blocks have also been scheduled on adjacent Sundays and intervening nights (e.g., Jan\u202f12\/13, 19\/20, 24\/25, and Feb\u202f2\/3) focusing on Diva\u2013Vasai road section for bridge-related modifications and cancellations of certain MEMU services<\/li>\n<\/ul>\n<hr \/>\n<h2>What You Should Know as a Commuter<\/h2>\n<table>\n<thead>\n<tr>\n<th>Line<\/th>\n<th>Affected Segment<\/th>\n<th>Time Slot<\/th>\n<th>Train Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Central Line<\/strong><\/td>\n<td>Matunga\u2013Mulund fast lines<\/td>\n<td>11:30 AM \u2013 3:30 PM<\/td>\n<td>Fast trains diverted \u2192 slow line; ~15\u202fmin delays<\/td>\n<\/tr>\n<tr>\n<td><strong>Trans\u2011Harbour Line<\/strong><\/td>\n<td>Thane\u2013Vashi\/Nerul<\/td>\n<td>11:10 AM \u2013 4:10 PM<\/td>\n<td>All local services suspended during this window<\/td>\n<\/tr>\n<tr>\n<td><strong>Western Line<\/strong><\/td>\n<td>Borivali\u2013Bhayandar UP fast<\/td>\n<td>9:30 AM \u2013 1:30 PM<\/td>\n<td>Fast trains run on slow line; delays and selective cancellations<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>Tips for Planning Your Journey<\/h2>\n<ol>\n<li><strong>Avoid travel between 11\u202fAM and 3:30\u202fPM<\/strong> on Central and Trans-Harbour lines if possible.<\/li>\n<li><strong>Use alternate routes:<\/strong> Consider Western Line slow or other transport modes.<\/li>\n<li><strong>Expect delays<\/strong> even outside these precise windows due to earlier slow-downs.<\/li>\n<li><strong>Stay updated via CR announcements<\/strong> or railway mobile app closer to the date.<\/li>\n<li><strong>Board early or postpone travel<\/strong> on Trans-Harbour segments, especially between Thane and Panvel.<\/li>\n<\/ol>\n<p>Let me know if you need help checking specific train numbers, alternate timing options, or connecting transport!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Mega Block on 19th January 2025 Mega Block on 19-01-2025 Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on 19 Jan 2025. Matunga-Mulund Up slow line from 11.30 am to 4.00 pm Panvel-Vashi Up and Down harbour lines from 11.30 am to 4.00 pm (Including Nerul\/Belapur-Kharkopar harbour lines) [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[31,32,9,692],"class_list":["post-6810","post","type-post","status-publish","format-standard","hentry","category-mega-block","tag-central-railway-mega-block-time-table","tag-harbour-line-mega-block-schedule","tag-mega-block","tag-mumbai-local-train-mega-block-harbour-line"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=6810"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6810\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=6810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=6810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=6810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}