{"id":6189,"date":"2025-08-06T12:41:28","date_gmt":"2025-08-06T12:41:28","guid":{"rendered":"https:\/\/railtravels.org\/?p=6189"},"modified":"2025-08-06T12:41:28","modified_gmt":"2025-08-06T12:41:28","slug":"eastern-railway-model-sop-2018","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/eastern-railway-model-sop-2018\/","title":{"rendered":"Eastern Railway Model SOP 2025"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Eastern Railway Model SOP 2025<\/strong><\/p>\n<p><strong>Latest Schedule of Powers Indian Railways<\/strong><\/p>\n<table class=\"mytable\">\n<tbody>\n<tr>\n<td width=\"211\"><strong>Railway Board Model SOP 2025<\/strong><\/td>\n<td width=\"84\"><a href=\"https:\/\/www.reilsolar.com\/train\/model-sop-2019\/\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table>\n<tbody>\n<tr>\n<td colspan=\"2\" width=\"638\"><strong>Model\u00a0\u00a0 Schedule of Power<em> (As on 17.12.2025)<\/em><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Revised Model Schedule of Power 2025\u00a0 Railway Board\u2019s Correction Slip\u00a0 1 dated 17.10.2025<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/11\/Revised-Model-Schedule-of-Power-2018.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Letter for implementation of Revised Model SOP 2025 \/ Eastern Railway<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Revised-Model-SOP-2018-Eastern-Railway-2.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Correction Slip no 1 in MSOP\u00a0 \/Part \u201cB\u201d \/Medical Matters<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Medical-Matters-2.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Correction regarding Constitution\u00a0 of Tender Committee\u00a0 &amp; Accepting\u00a0\u00a0 Authority\u00a0 \u2013\u00a0\u00a0 Annexure A for works\u00a0 Contacts\u00a0\u00a0 Under\u00a0\u00a0 MSOP\u00a0 \u2013\u00a0\u00a0 2025\u00a0 Part A \/Works Matters<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Annexure-A-2.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Correction regarding Constitution\u00a0 of Tender Committee\u00a0 &amp; Accepting\u00a0\u00a0 Authority\u00a0 \u2013\u00a0\u00a0 Annexure D for works\u00a0 Contacts\u00a0\u00a0 Under\u00a0\u00a0 MSOP\u00a0 \u2013\u00a0\u00a0 2025\u00a0 Part A \/Works Matters<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Annexure-D-2.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Joint Procedure Order\u00a0 for Procurement through Spot\u00a0 Purchase\u00a0 Committee\u00a0 in\u00a0 MSOP 2025<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Joint-Procedure-Order-for-Procurement-through-Spot-Purchase-Committee-in-MSOP-2018-2.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Here\u2019s the status on the <strong>Eastern Railway&#8217;s implementation of the Model SOP (Schedule of Powers) as of 2025<\/strong>:<\/p>\n<hr \/>\n<h2>Overview of Model SOP 2025 Implementation (Applicable to Eastern Railway)<\/h2>\n<p>The <strong>Model Schedule of Powers (SOP) 2025<\/strong>, issued by the Railway Board, defines the delegation of administrative and financial authorities across Indian Railways\u2014including the <strong>Eastern Railway (ER)<\/strong>. It is structured to standardize decision-making while allowing flexibility for local requirements.<\/p>\n<h3>Key Features:<\/h3>\n<ul>\n<li>Delegated powers cover a wide range of functions including <strong>works<\/strong>, <strong>stores<\/strong>, <strong>commercial operations<\/strong>, <strong>medical<\/strong>, <strong>establishment<\/strong>, <strong>security<\/strong>, and <strong>miscellaneous<\/strong> matters.<\/li>\n<li>It empowers officers such as <strong>PHODs<\/strong>, <strong>CHODs<\/strong>, <strong>DRMs<\/strong>, and <strong>CWMs<\/strong> (Senior Administrative Grade officers in workshops\/depots), with similar structures respected in Eastern Railway.<\/li>\n<\/ul>\n<h3>Eastern Railway Application:<\/h3>\n<ul>\n<li>Eastern Railway implemented the Model SOP through <strong>official Board letters<\/strong>, adopting the revised SOP 2025 with its specific <strong>correction slips<\/strong> for Works Matters and Medical Matters.<\/li>\n<li>Eastern Railway also included specific frameworks for <strong>tender committees<\/strong> and <strong>accepting authorities<\/strong> customized for zones and units.<\/li>\n<\/ul>\n<hr \/>\n<h2>Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th><strong>Aspect<\/strong><\/th>\n<th><strong>Details (Eastern Railway)<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Framework Used<\/strong><\/td>\n<td>Model SOP 2025 (with corrections incorporated)<\/td>\n<\/tr>\n<tr>\n<td><strong>Scope of Delegation<\/strong><\/td>\n<td>Covers Works, Stores, Commercial, Establishment, Medical, Security, etc.<\/td>\n<\/tr>\n<tr>\n<td><strong>Decision-Making Hierarchy<\/strong><\/td>\n<td>Roles defined for PHOD, CHOD, DRM, CWM (zone-specific application with local flexibility)<\/td>\n<\/tr>\n<tr>\n<td><strong>Zone-Specific Updates<\/strong><\/td>\n<td>Includes correction slips for Works and Medical; tailored tender committee guidelines<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h3>Final Note<\/h3>\n<p>There has been <strong>no new standalone &#8220;Model SOP 2025&#8221;<\/strong> released. The Model SOP 2025 remains active, with various amendments, including Eastern Railway\u2011specific directives and zone-level updates that reflect necessary adjustments.<\/p>\n<p>If you\u2019d like, I can help you locate individual correction slips, access ER-specific SOP documents, or explain how these delegations affect decision-making processes at your level.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Eastern Railway Model SOP 2025 Latest Schedule of Powers Indian Railways Railway Board Model SOP 2025 Click Here Model\u00a0\u00a0 Schedule of Power (As on 17.12.2025) Revised Model Schedule of Power 2025\u00a0 Railway Board\u2019s Correction Slip\u00a0 1 dated 17.10.2025 Click Here Letter for implementation of Revised Model SOP 2025 \/ Eastern Railway Click Here Correction Slip [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51,7,79],"tags":[50,6,80],"class_list":["post-6189","post","type-post","status-publish","format-standard","hentry","category-ministry-of-railways","category-railway","category-railway-board","tag-ministry-of-railways","tag-railway","tag-railway-board"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=6189"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6189\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=6189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=6189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=6189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}