{"id":6156,"date":"2025-08-06T12:25:44","date_gmt":"2025-08-06T12:25:44","guid":{"rendered":"https:\/\/railtravels.org\/?p=6156"},"modified":"2025-08-06T12:25:44","modified_gmt":"2025-08-06T12:25:44","slug":"north-western-railway-new-time-table-2019-2020","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/north-western-railway-new-time-table-2019-2020\/","title":{"rendered":"North Western Railway New Time Table 2025\u20132025"},"content":{"rendered":"<div class=\"entry-content\">\n<h2><strong>North Western Railway New Time Table 2025\u20132025<\/strong><\/h2>\n<p><strong><em>New timetable starting from 01 July 2025<\/em><\/strong><\/p>\n<p>59 will increase the speed of trains, saving time \u2013 saving up to 1 hour 20 minutes.<\/p>\n<h3><strong>Click Here to Download\u00a0 \u2014 <a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/North-Western-Railway-New-Time-Table-2019-in-PDF.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">North Western Railway New Time Table 2025 in PDF<\/a><\/strong><\/h3>\n<p>24 at Jaipur station, 54 at Jodhpur \/ Bhagat Kothi station, 23 at Ajmer station and change in time of 14 trains at Bikaner station \u2013 New schedule will be partially changed in the time of the train from 01 July 2025<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17406\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/North-Western-Railway-New-Time-Table-2019\u20132020.jpg\" alt=\"\" width=\"699\" height=\"1167\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17407\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/North-Western-Railway-New-Time-Table-2019\u20132020-2.jpg\" alt=\"\" width=\"699\" height=\"921\" \/><\/p>\n<p>Source: nwr.indianrailways.gov.in<\/p>\n<p>Here\u2019s the latest update on the <strong>North Western Railway (NWR) new timetable for 2025<\/strong>, including key service changes and schedule adjustments:<\/p>\n<hr \/>\n<h2>1. Implementation of TAG\u20112025 Timetable (Effective January 1, 2025)<\/h2>\n<p>As part of Indian Railways&#8217; national <strong>\u201cTrains at a Glance 2025\u201d<\/strong> update, NWR implemented widespread changes, including:<\/p>\n<ul>\n<li><strong>Revised arrival and departure timings<\/strong> across various stations.<\/li>\n<li><strong>Speed enhancements<\/strong> for over <strong>60 trains<\/strong>, leading to significant time savings.<\/li>\n<\/ul>\n<hr \/>\n<h2>2. Jodhpur Division Overhaul<\/h2>\n<h3>\u2022 <strong>Change in Train Termini (January 1, 2025)<\/strong><\/h3>\n<ul>\n<li>Around <strong>20 trains<\/strong> in the Jodhpur division were <strong>permanently rerouted<\/strong> to start or terminate from <strong>Bhagat Ki Kothi<\/strong> instead of Jodhpur City station.<\/li>\n<li>Certain services, such as the <strong>Bikaner\u2013Puri Express<\/strong> and <strong>Bikaner\u2013Dadar Express<\/strong>, now use <strong>Lalgarh<\/strong> as their new terminus.<\/li>\n<\/ul>\n<h3>\u2022 <strong>Speed &amp; Schedule Revisions (March 2025)<\/strong><\/h3>\n<ul>\n<li>Over <strong>160 trains<\/strong> received updated schedules, reducing journey times by <strong>5 to 90 minutes<\/strong>, depending on the route.<\/li>\n<li>Example: <strong>Delhi\u2013Jaisalmer Express (14087)<\/strong> saved <strong>90 minutes<\/strong>, <strong>Rewari\u2013Hisar (09632)<\/strong> saved <strong>35 minutes<\/strong>, and <strong>Jodhpur\u2013Howrah (12308)<\/strong> saved <strong>5 minutes<\/strong>.<\/li>\n<\/ul>\n<h3>\u2022 <strong>Temporary Cancellations &amp; Rerouting (March 7\u201317, 2025)<\/strong><\/h3>\n<ul>\n<li>Due to ongoing remodeling around <strong>Jammu Tawi<\/strong>:\n<ul>\n<li><strong>Jodhpur\u2013Bhopal Express (14813)<\/strong> and return service were cancelled.<\/li>\n<li>Other trains, like <strong>Indore\u2013Jodhpur (12465\/66)<\/strong> and <strong>Jaipur\u2013Suratgarh (19719\/20)<\/strong>, had short segments cancelled.<\/li>\n<li><strong>Marudhar Express<\/strong> trains were rerouted via <strong>Phulera\u2013Ajmer<\/strong> for about 10 trips.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>3. Maintenance Disruptions on Jaipur\u2011Rewari Section (March\u2013May 2025)<\/h2>\n<ul>\n<li><strong>Infrastructure work<\/strong> at level crossing No. 61 between <strong>Anaj Mandi Rewari\u2013Rewari<\/strong> impacted services:\n<ul>\n<li><strong>Train 09635 (Jaipur\u2013Rewari Special)<\/strong> will operate only up to <strong>Alwar<\/strong> on <strong>May 25<\/strong>.<\/li>\n<li><strong>Train 09636 (Rewari\u2013Jaipur Special)<\/strong> will originate instead from <strong>Alwar<\/strong>.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Feature<\/th>\n<th>Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Effective Date<\/strong><\/td>\n<td>January\u202f1,\u202f2025<\/td>\n<\/tr>\n<tr>\n<td><strong>Timing &amp; Speed Revisions<\/strong><\/td>\n<td>60+ trains sped up; 5\u201390 min saved<\/td>\n<\/tr>\n<tr>\n<td><strong>Jodhpur Division Changes<\/strong><\/td>\n<td>20 trains rerouted to Bhagat Ki Kothi; some termini shifted to Lalgarh<\/td>\n<\/tr>\n<tr>\n<td><strong>Schedule Revisions (Mar 2025)<\/strong><\/td>\n<td>Over 160 trains updated with new timings and routes<\/td>\n<\/tr>\n<tr>\n<td><strong>Temporary Disruptions<\/strong><\/td>\n<td>Cancellations and rerouting affecting multiple trains (Mar 7\u201317)<\/td>\n<\/tr>\n<tr>\n<td><strong>Maintenance Impact<\/strong><\/td>\n<td>Partial cancellations on Jaipur\u2013Rewari line (May 2025)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>What You Can Do Next<\/h2>\n<ul>\n<li>Want to check specific train timings or find new route details? Let me know the <strong>train number or route<\/strong>, and I\u2019ll lookup the updated schedule.<\/li>\n<li>Looking for a timetable PDF or more localized updates (e.g., Jaipur or Jodhpur divisions)? I can help direct you.<\/li>\n<\/ul>\n<p>Let me know how I can assist with your travel planning!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>North Western Railway New Time Table 2025\u20132025 New timetable starting from 01 July 2025 59 will increase the speed of trains, saving time \u2013 saving up to 1 hour 20 minutes. Click Here to Download\u00a0 \u2014 North Western Railway New Time Table 2025 in PDF 24 at Jaipur station, 54 at Jodhpur \/ Bhagat Kothi [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[39,507,149,627],"class_list":["post-6156","post","type-post","status-publish","format-standard","hentry","category-new-time-table","tag-new-time-table","tag-new-train-time-table-2019-20","tag-north-western-railway","tag-north-western-railway-new-time-table-2019-2020"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=6156"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/6156\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=6156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=6156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=6156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}