{"id":5918,"date":"2025-08-04T11:13:23","date_gmt":"2025-08-04T11:13:23","guid":{"rendered":"https:\/\/railtravels.org\/?p=5918"},"modified":"2025-08-04T11:13:23","modified_gmt":"2025-08-04T11:13:23","slug":"kottur-hospet-passenger-train-kottur-to-hospet-train-timings-hospet-to-kotturu-railway-line","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/kottur-hospet-passenger-train-kottur-to-hospet-train-timings-hospet-to-kotturu-railway-line\/","title":{"rendered":"Kottur Hospet Passenger Train , Kottur To Hospet Train Timings, Hospet To Kotturu Railway Line"},"content":{"rendered":"<div class=\"entry-content\">\n<h3><strong>Kottur Hospet Passenger Train , Kottur To Hospet Train Timings and\u00a0 Hospet To Kotturu Railway Line<\/strong><\/h3>\n<p><strong>SHRI SURESH C. ANGADI, HON\u2019BLE MOSR AND PUBLIC REPRESENTATIVES OF THE REGION FLAG OFF FIRST PASSENGER TRAIN SERVICE ON HOSAPETE-KOTTURU LINE<\/strong><\/p>\n<p>Inaugural train service of Train No 56530 Hosapete \u2013 Harihar Passenger train via Kotturu and Davangere was flagged off by Shri Suresh Angadi, Hon\u2019ble Minister of State of Railways from Hosapete station on 17th Oct 2025. on this occasion, Shri Y Devendrappa, Hon\u2019ble MP, Ballari, Shri G M Siddeshwara, Hon\u2019ble MP, Davangere, Shri Karadi Sanganna, Hon\u2019ble MP, Koppal, Shri Somashekar Reddy, Hon\u2019ble MLA, Ballari City and Shri Paranna Munavalli, Hon\u2019ble MLA, Gangavathi were present.<\/p>\n<p>Welcoming the dignitaries on the occasion of inauguration of train services Shri Ajay Kumar Singh, GM\/SWR said that this project was the dream of people of this region. He said that due to re-grading at multiple locations and issues of Level Crossing Gate works, the commissioning of Hosapete \u2013 Kotturu line for passenger train took time. This new line connecting Bengaluru \u2013 Hubballi Line with Hubbali-Guntakal line, is a landmark in history of SWR.<\/p>\n<p>Speaking on the occasion, Shri Karadi Sanganna, Hon\u2019ble MP\/Koppal said that after decades of efforts , this Railway line materialized. He said that credit goes to Shri Suresh C. Angadi, Hon\u2019ble Minister of State of Railways and Shri Y.Devendrappa, Hon\u2019ble MP\/Ballari . He requested to extend the Hosapete-Kotturu train services to Ballari.<\/p>\n<p>Shri G M Siddeshwara, Hon\u2019ble MP, Davangere and Shri Y Devendrappa, Hon\u2019ble MP, Ballari appreciated the work of Hon\u2019ble Minister of State of Railways and thanked him for initiatives taken for development in Karnataka.<\/p>\n<p>Before flagging off the train services, Hon\u2019ble Minister of State of Railways said that Harihar -Kotturu new line is a result of many years of struggle. Hon\u2019ble Minister of State of Railways said that similar to Hon\u2019ble PM uniting whole World with Yoga, Indian Railways is uniting and connecting our country, by providing transportation across length and breadth of country. Hon\u2019ble Minister of State of Railways informed that in next 5 years Rs.5 Lakh Cr. will be invested in Railway projects. He reiterated priorities of Railway will be Safety, Punctuality and cleanliness. He also announced flagging off of Vijayapura -Yesvantpur new train on 22nd Oct. He said that extension of Harihar \u2013 Hosapete train services upto Ballari will be looked into. He informed that the emphasis is being given on completion of ongoing projects . He said that with the cooperation of Central and State Govts all pending projects will be completed.<\/p>\n<p>Later while briefing the Press he informed that the Bengaluru \u2013 Miraj doubling was being done quickly for benefit of three States (Karnataka, Goa and Maharashtra) and that Pune \u2013 Miraj, Miraj \u2013 Londa doubling projects will get special focus along with Hubballi \u2013 Hosapete.<\/p>\n<p>The section between Hosapete \u2013 Vyasa \u2013 Kotturu(71 Km) meter gauge section has been converted to BG and ready for Passenger traffic.During meter gauge the line was only uptoKotturu and there was a demand to connect this line to Harihar. Futher a new line from Harihar to Kotturu was opened in 2025 for passenger but Hospet to Kotturu was not cleared for passenger traffic. However with this connection the distance will be cut down and save travel time between Bengaluru -Hosapete \u2013 Hampi a world tourist and heritage site.<\/p>\n<p>Earlier there was no direct rail connectivity between Ballari \u2013 Hospet to Harihar. With the opening of this section and running of passenger trains interior Karnataka will have better connectivity to Bengaluru. Davangere, will also get direct connectivity to Hospet \u2013 Ballari \u2013 Guntakal main line<\/p>\n<p>The work of completion of the section between Hosapet to Kottur was delayed due to steep gradients, curves and number of Bridges including 8 major bridges. The completion of this new line in difficult terrain is a landmark in history of SWR. Commissioner of Railway Safety has inspected the section on 17.09.2025 and permitted running of passenger trains services on this section.<\/p>\n<p>Details of Train No. 56529 \/ 56230 Hosapete \u2013 Harihar Passenger.<\/p>\n<p>The Train will have a composition of 9 Coaches consisting of 7 General Second Class Coaches and 2 Second Class Luggage cum Brake Van.<\/p>\n<p>Regular service of Train No. 56529\/56530 Harihar \u2013 Hosapete \u2013 Harihar Passenger on newly opened line will commence from 18.10.2019 with stoppages as detailed below:<\/p>\n<p>As regular service Train No. 56529 Harihar \u2013 Hosapete Passenger will depart from Harihar at 07:20 hrs and arrive at Hosapete at 12:10 hrs on the same day with effect from 18.10.2019.<\/p>\n<p>Enroute this train will arrive\/depart Amaravati Colony \u2013 07:25\/07:26 hrs, Davangere \u2013 07:45\/07:55 hrs, Amaravati Colony \u2013 08:03\/08:05 hrs, Teligi \u2013 08:22\/08:23 hrs, Harapanahalli \u2013 08:43\/08:44 hrs, Bennehalli \u2013 09:05\/09:06 hrs, Kotturu \u2013 09:26\/09:27 hrs, Malavi \u2013 09:50\/09:51 hrs, Hagari Bommanahalli \u2013 10:08\/10:10 hrs, Hampapatnam \u2013 10:23\/10:24 hrs, Mariyammanahalli \u2013 10:44\/10:45 hrs, Vyasa Colony \u2013 11:00\/11:01 hrs, Vyasankeri \u2013 11:16\/11:17 hrs and Tungabhadra dam \u2013 11:32\/11:33 hrs.<\/p>\n<p>In return direction service Train No. 56530 Hosapete \u2013 Harihar Passenger will depart from Hosapete at 12:55 hrs and arrive at Harihar at 18:30 hrs on the same day.<\/p>\n<p>Enroute this train will arrive\/depart Tungabhadra dam \u2013 13:05\/13:06 hrs, Vyasankeri \u2013 13:14\/13:15 hrs, Vyasa Colony \u2013 13:19\/13:20 hrs, Mariyammanahalli \u2013 13:34\/13:35 hrs, Hampapatnam -13:53\/13:54 hrs, Hagari Bommanahalli \u2013 14:12\/14:15 hrs, Malavi \u2013 14:32\/14:33 hrs, Kotturuu \u2013 15:02\/15:03 hrs, Bennehalli \u2013 15:32\/15:33 hrs, Harapanahalli \u2013 15:44\/15:45 hrs, Teligi \u2013 16:10\/16:11 hrs, Amaravati Colony \u2013 17:01\/17:02 hrs, Davangere \u2013 17:25\/17:35 hrs and Amaravati Colony \u2013 17:44\/17:45 hrs<\/p>\n<p>Here\u2019s the information on the <strong>Kotturu \u2194 Hospet passenger train<\/strong>, along with details on the railway line connecting them:<\/p>\n<hr \/>\n<h2>\ud83d\ude86 Train Service: Kotturu (KTY) \u2194 Hospet Junction (HPT)<\/h2>\n<h3>Trains Operating on the Kotturu\u2013Hospet Route:<\/h3>\n<ul>\n<li><strong>YPR\u2013BJP Express (06545)<\/strong>\n<ul>\n<li><strong>Departure<\/strong> from Kotturu (KTY): <strong>03:12 hrs<\/strong> daily<\/li>\n<li><strong>Arrival<\/strong> at Hospet Junction (HPT): <strong>05:50 hrs<\/strong><\/li>\n<li><strong>Duration<\/strong>: ~2 hours 38 minutes \u2014 <strong>the only direct scheduled express<\/strong> between these stations<\/li>\n<li>Runs <strong>every day<\/strong> with AC\u20113\u202fTier and Sleeper classes \ue202turn0search4\ue202turn0search3\ue201<\/li>\n<\/ul>\n<\/li>\n<li><strong>Other services<\/strong>:\n<ul>\n<li><strong>Harihar\u2013Hospet Passenger (56529\/56530)<\/strong> and <strong>Davangere\u2013Ballari DEMU Special (07396\/07395)<\/strong> run on the corridor and serve Kotturu as intermediate stops.<\/li>\n<li><strong>07396 DEMU<\/strong> takes ~2h 23m \u2014 fastest on the route.<\/li>\n<li><strong>Harihar\u2013Hospet Passenger<\/strong>: ~2h 50m, slower local stoppage service.<\/li>\n<li>These are <strong>unreserved and daily<\/strong> services.<br \/>\n\ue202turn0search1\ue202turn0search6\ue201<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udccb Train Timings Summary<\/h2>\n<table>\n<thead>\n<tr>\n<th>Route<\/th>\n<th>Train \/ Type<\/th>\n<th>Departure from Kotturu<\/th>\n<th>Arrival at Hospet<\/th>\n<th>Duration<\/th>\n<th>Frequency<\/th>\n<th>Classes<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Kotturu \u2192 Hospet<\/td>\n<td>YPR BJP EXP (06545)<\/td>\n<td>03:12<\/td>\n<td>05:50<\/td>\n<td>~2h\u202f38\u202fm<\/td>\n<td>Daily<\/td>\n<td>3A, SL<\/td>\n<\/tr>\n<tr>\n<td>Kotturu \u2192 Hospet<\/td>\n<td>DEMU Special (07396)<\/td>\n<td>~16:05<\/td>\n<td>~18:28<\/td>\n<td>~2h\u202f23\u202fm<\/td>\n<td>Daily<\/td>\n<td>Unreserved<\/td>\n<\/tr>\n<tr>\n<td>Kotturu \u2192 Hospet<\/td>\n<td>Passenger (56529)<\/td>\n<td>~08:35<\/td>\n<td>~11:25<\/td>\n<td>~2h\u202f50\u202fm<\/td>\n<td>Daily<\/td>\n<td>Unreserved<\/td>\n<\/tr>\n<tr>\n<td>Hospet \u2192 Kotturu<\/td>\n<td>Reverse services<\/td>\n<td>\u2014<\/td>\n<td>\u2014<\/td>\n<td>\u2014<\/td>\n<td>Daily<\/td>\n<td>\u2014<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\ue202turn0search7\ue202turn0search6\ue201<\/p>\n<hr \/>\n<h2>\ud83d\udee4 Railway Line: Kotturu \u2194 Hospet Junction<\/h2>\n<ul>\n<li><strong>Distance<\/strong> is approximately <strong>71\u202fkm<\/strong> with <strong>10\u201311 stations<\/strong> along the route.<\/li>\n<li>The railway line <strong>Kotturu\u2013Hospet\u2013Amaravathi Colony Junction<\/strong> is broad-gauge, functional, and electrified as part of the Guntakal\u2013Vasco da Gama section.<br \/>\n\ue202turn0search5\ue202turn0search20\ue201<\/li>\n<li><strong>Areas Served<\/strong>: Kottur taluk of Vijayanagara district\u2014famous for Guru Kottureshwara temple\u2014has rail connectivity that was upgraded post-2019. The line now extends from Hospet through Kotturu toward Harihara and Ballari sectors.<br \/>\n\ue202turn0search19\ue202turn0search13\ue201<\/li>\n<\/ul>\n<hr \/>\n<h2>\u2705 Travel &amp; Booking Recommendations<\/h2>\n<ul>\n<li>For a <strong>reserved seat with guaranteed classes<\/strong>, use <strong>YPR\u2013BJP Express (06545)<\/strong>.<\/li>\n<li>For <strong>short-distance unreserved travel<\/strong>, the <strong>DEMU Special<\/strong> or <strong>Passenger service<\/strong> are available and frequent.<\/li>\n<li><strong>Fares<\/strong> (via Rome2Rio estimates): SL ~\u20b9130\u2013160, 3A ~\u20b9370\u2013420, 2A ~\u20b9508\u2013510, 1A up to \u20b9820.<br \/>\n\ue202turn0search11\ue201<\/li>\n<li>To book:\n<ul>\n<li><strong>Official IRCTC portal<\/strong> for reserved tickets;<\/li>\n<li>For unreserved services, you can board and buy tickets at station.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Live status and PNR updates<\/strong> can be checked via apps like NTES, WhereIsMyTrain, RailMitra, or third-party portals like ixigo or Goibibo.<\/li>\n<\/ul>\n<hr \/>\n<h2>\u26a0\ufe0f Quick Notes<\/h2>\n<ul>\n<li><strong>Only one reserved express train per day<\/strong> connects Kotturu to Hospet.<\/li>\n<li><strong>Travel time is about 2.5 hours<\/strong>, and distance is ~71\u202fkm, on fully electrified, double-track routes in the region.<\/li>\n<li><strong>Station codes<\/strong>: Kotturu (KTY), Hospet Junction (HPT).<\/li>\n<li><strong>Local connectivity to Harihara, Bellary, Davangere<\/strong> is available via passenger or DEMU trains.<\/li>\n<\/ul>\n<p>Let me know if you&#8217;d like help checking live availability, above train running status, or fare details for this corridor!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kottur Hospet Passenger Train , Kottur To Hospet Train Timings and\u00a0 Hospet To Kotturu Railway Line SHRI SURESH C. ANGADI, HON\u2019BLE MOSR AND PUBLIC REPRESENTATIVES OF THE REGION FLAG OFF FIRST PASSENGER TRAIN SERVICE ON HOSAPETE-KOTTURU LINE Inaugural train service of Train No 56530 Hosapete \u2013 Harihar Passenger train via Kotturu and Davangere was flagged [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[37,48,49,15,41,544,78],"class_list":["post-5918","post","type-post","status-publish","format-standard","hentry","category-new-trains","tag-introduction-of-new-trains","tag-new-railway-line","tag-new-railway-projects","tag-new-trains","tag-new-trains-list","tag-new-trains-list-2019","tag-railway-news"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=5918"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5918\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=5918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=5918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=5918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}