{"id":5622,"date":"2025-08-06T04:10:28","date_gmt":"2025-08-06T04:10:28","guid":{"rendered":"https:\/\/railtravels.org\/?p=5622"},"modified":"2025-08-06T04:10:28","modified_gmt":"2025-08-06T04:10:28","slug":"western-railway-new-time-table-2019-2020","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/western-railway-new-time-table-2019-2020\/","title":{"rendered":"Western Railway New Time Table 2025\u20132025"},"content":{"rendered":"<div class=\"entry-content\">\n<h3><strong>Western Railway New Time Table 2025\u20132025<\/strong><\/h3>\n<h3><strong>Western Railway Time Table 2025-24<\/strong><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17514\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/wr-2019-2020.jpg\" alt=\"\" width=\"614\" height=\"960\" data-pagespeed-url-hash=\"496251391\" \/><\/p>\n<p>New time table at Ahmedabad mandal from 01 July 2025\u00a0 42 trains will change in the time of trains. The new time table is being implemented from 01th July on the Ahmedabad Division. In This, 27 trains from Ahmedabad will run from 27st July to 15 trains and 15 trains will run late from the present time.<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"319\">\n<h2><strong>Western Railway New Time Table 2025-24 in pdf<\/strong><\/h2>\n<\/td>\n<td width=\"90\">\n<h2><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Western-Railway-New-Time-Table-2019-20-in-pdf.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/h2>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17415\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Western-Railway-Time-Table-2019-20.jpg\" alt=\"\" width=\"537\" height=\"904\" data-pagespeed-url-hash=\"1170727383\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17416\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Western-Railway-Time-Table-2019-20-2.jpg\" alt=\"\" width=\"721\" height=\"366\" data-pagespeed-url-hash=\"3905358144\" \/><\/p>\n<h3><strong>Passengers may kindly take note of timings of all trains at Rajkot station as per new Time Table effective from 1st July 2025.<\/strong><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17439\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Rajkot-station-1.jpg\" alt=\"\" width=\"506\" height=\"680\" data-pagespeed-url-hash=\"2230444890\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17440\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Rajkot-station-2.jpg\" alt=\"\" width=\"506\" height=\"679\" data-pagespeed-url-hash=\"2524944811\" \/><\/p>\n<h3><strong>The new time table of railways will be implemented on the Bhavnagar division from one July.<\/strong><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17442\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/bhavnagar-division-1.jpg\" alt=\"\" width=\"548\" height=\"814\" data-pagespeed-url-hash=\"2809696298\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17443\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/bhavnagar-division-2.jpg\" alt=\"\" width=\"535\" height=\"646\" data-pagespeed-url-hash=\"3104196219\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-17444\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/bhavnagar-division-3.jpg\" alt=\"\" width=\"540\" height=\"789\" data-pagespeed-url-hash=\"3398696140\" \/><\/p>\n<p>Source : Facebook Western Railway<\/p>\n<p>Here\u2019s a detailed and up-to-date overview of the <strong>Western Railway\u2019s new timetable for 2025<\/strong>, effective from <strong>January\u202f1,\u202f2025<\/strong>, along with notable mid-year updates:<\/p>\n<hr \/>\n<h2>Key Updates in Western Railway Timetable \u2013 2025<\/h2>\n<h3>1. <strong>Speed Enhancements (Effective January 1, 2025)<\/strong><\/h3>\n<ul>\n<li><strong>107 long-distance trains<\/strong> under Western Railway have been sped up, collectively saving <strong>1,363 minutes<\/strong> in travel time.<\/li>\n<li>For example, the <strong>Bandra Terminus\u2013Veraval Express<\/strong>\u2019s journey time has been reduced by <strong>85 minutes<\/strong>.<\/li>\n<\/ul>\n<h3>2. <strong>Express-to-Superfast Conversions<\/strong><\/h3>\n<ul>\n<li>Several Express trains were upgraded to <strong>Superfast<\/strong> status early in January 2025:\n<ul>\n<li><strong>BDTS\u2013BME<\/strong> (19009\/19010) \u2192 <strong>21901\/21902<\/strong> (from Jan\u202f3)<\/li>\n<li><strong>BL\u2013BGKT<\/strong> (19055\/19056) \u2192 <strong>22991\/22992<\/strong> (from Jan\u202f7)<\/li>\n<li><strong>SBIB\u2013BSB\u2013SBIB<\/strong> (19407\/19408) \u2192 <strong>20963\/20964<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>3. <strong>New Vande Bharat &amp; Express Services<\/strong><\/h3>\n<ul>\n<li>Announced additions include:\n<ul>\n<li><strong>Vande Bharat<\/strong> services on the <strong>Ahmedabad\u2013Mumbai<\/strong> and <strong>Udaipur\u2013Agra<\/strong> routes<\/li>\n<li><strong>Namo Bharat Rapid Rail<\/strong> on <strong>Ahmedabad\u2013Bhuj<\/strong> (6 days\/week)<\/li>\n<li>Six new Express trains like <strong>BDTS\u2013Veraval<\/strong> and <strong>BDTS\u2013Barmer<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>4. <strong>Division-Level Schedule Changes<\/strong><\/h3>\n<ul>\n<li><strong>Ahmedabad Division<\/strong>:\n<ul>\n<li><strong>95 trains<\/strong> sped up.<\/li>\n<li><strong>48 trains<\/strong> now arrive <strong>5\u201365 minutes earlier<\/strong>.<\/li>\n<li><strong>55 trains<\/strong> experience delays of <strong>5\u201340 minutes<\/strong>.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Central Zone Adjustments (West Central Railway)<\/strong>:\n<ul>\n<li>Over <strong>20 trains<\/strong> had their departure or arrival timings revised.<\/li>\n<li>MEMU\/passenger services dropped the &#8216;0&#8217; prefix from their numbers.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>5. <strong>Revised Schedules (April 20, 2025)<\/strong><\/h3>\n<ul>\n<li>Several trains had their timings updated:\n<ul>\n<li><strong>Surat\u2013Mahuva Express (19255)<\/strong>: Departs earlier at 21:30 (was 22:00), arrives earlier.<\/li>\n<li><strong>Mumbai Central\u2013Amritsar Mail (12903)<\/strong>: Adjusted Vadodara timings.<\/li>\n<li><strong>Ahmedabad\u2013Ektanagar Jan Shatabdi (20949)<\/strong>: Timing tweaked; currently <strong>temporarily cancelled<\/strong>.<\/li>\n<li>Other changes include <strong>Surat\u2013Bhusawal Passenger (19007)<\/strong>, <strong>Surat\u2013Nandurbar MEMU (69169)<\/strong>, <strong>Ahmedabad\u2013Prayagraj Express (22967)<\/strong>, and <strong>Udhna\u2013Banaras Express (20929)<\/strong>.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h3>6. <strong>Safety, Infrastructure &amp; Reservation Changes<\/strong><\/h3>\n<ul>\n<li><strong>Reservation Chart Updates<\/strong> (from July 14, 2025):\n<ul>\n<li>Trains departing between <strong>05:01\u202fAM\u20132\u202fPM<\/strong>: first chart by <strong>9\u202fPM (prior evening)<\/strong>.<\/li>\n<li><strong>2:01\u202fPM\u20134\u202fPM<\/strong> departures: chart by <strong>7:30\u202fAM (same day)<\/strong>.<\/li>\n<li><strong>4:01\u202fPM\u20135\u202fAM<\/strong>: chart prepared <strong>8 hours before departure<\/strong>.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Infrastructure Work<\/strong>:\n<ul>\n<li>A major maintenance block impacted <strong>451 train services<\/strong> (incl. Vande Bharat and Rajdhani) between <strong>Mahim\u2013Bandra<\/strong> on the nights of <strong>Jan 24\u201326, 2025<\/strong>.<\/li>\n<li>The <strong>sixth rail line<\/strong> between <strong>Bandra Terminus\u2013Borivli<\/strong> is set for completion by <strong>July 2025<\/strong>, aiming to improve capacity for long-distance trains.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Category<\/th>\n<th>Highlights<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Effective Date<\/strong><\/td>\n<td>January 1, 2025<\/td>\n<\/tr>\n<tr>\n<td><strong>Speed Gains<\/strong><\/td>\n<td>107 trains sped up; significant minutes saved<\/td>\n<\/tr>\n<tr>\n<td><strong>Train Upgrades<\/strong><\/td>\n<td>Several Express \u2192 Superfast conversions; new Vande Bharat and Rapid Rail services<\/td>\n<\/tr>\n<tr>\n<td><strong>Regional Timings<\/strong><\/td>\n<td>Major revisions in Ahmedabad and West Central divisions<\/td>\n<\/tr>\n<tr>\n<td><strong>Mid-year Adjustments<\/strong><\/td>\n<td>Multiple schedule tweaks in April 2025<\/td>\n<\/tr>\n<tr>\n<td><strong>Reservation System<\/strong><\/td>\n<td>New chart preparation timings for smoother bookings<\/td>\n<\/tr>\n<tr>\n<td><strong>Infrastructure Work<\/strong><\/td>\n<td>Major blocks in Jan; 6th line project near completion by July<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<p>Would you like help checking the specific schedule for a train you\u2019re interested in, or finding updated arrival\/departure timings? Just let me know!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Western Railway New Time Table 2025\u20132025 Western Railway Time Table 2025-24 New time table at Ahmedabad mandal from 01 July 2025\u00a0 42 trains will change in the time of trains. The new time table is being implemented from 01th July on the Ahmedabad Division. In This, 27 trains from Ahmedabad will run from 27st July [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[39,507,27],"class_list":["post-5622","post","type-post","status-publish","format-standard","hentry","category-new-time-table","tag-new-time-table","tag-new-train-time-table-2019-20","tag-western-railway"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=5622"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5622\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=5622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=5622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=5622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}