{"id":5597,"date":"2025-08-10T03:47:51","date_gmt":"2025-08-10T03:47:51","guid":{"rendered":"https:\/\/railtravels.org\/?p=5597"},"modified":"2025-08-10T03:47:51","modified_gmt":"2025-08-10T03:47:51","slug":"codal-life-of-assets-led-signals","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/codal-life-of-assets-led-signals\/","title":{"rendered":"Codal life of assets- LED Signals"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Codal life of assets- LED Signals<\/strong><\/p>\n<p>Click below link to view the Original order<\/p>\n<p><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/RBA_53.pdf\" target=\"_blank\" rel=\"noopener\">RBA_53<\/a><\/p>\n<p>Sub:\u00a0<strong>Revised Codal life of assets.<\/strong><\/p>\n<p>Please refer to Board\u2019s letter of even no. dated 25.05.2006 (RBA No. 25\/2006), 18.08.2006 (RBA No. 42\/2006), 12.10.2007 (RBA No. 37\/2007), 25.02.200- (RBA No. 13\/2009) and 15.03.2025 (RBA No. 5\/2025) under which instructions on revised codal life of assets based on the recommendations of ED\u2019s Committee were issued. The said Committee has further examined the proposal of fixing the codal life of LED display Boards for Passenger Information Systems, True Colour Video Cum Train Information Display System and GPS based digital clocks and their recommendations have since been accepted by Board.<\/p>\n<p>Accordingly, Advance Correction Slip No. 75 amending para 219 of Indian Railway Finance Code \u2013 Volume -1 is placed below for information and necessary action.<\/p>\n<p><strong>Accounts Appropriation,<\/strong><br \/>\n<strong>Finance (Budget).<\/strong><\/p>\n<p>Here\u2019s the officially approved <strong>codal life of LED signals<\/strong> (all-aspect types) under <strong>Signalling &amp; Telecommunication Assets<\/strong>, as per <strong>Advance Correction Slip (ACS) No. 78<\/strong>, Railway Board, dated <strong>28 August 2025<\/strong>:<\/p>\n<hr \/>\n<h3>Codal Life of LED Signals<\/h3>\n<table>\n<thead>\n<tr>\n<th><strong>Type of LED Signal<\/strong><\/th>\n<th><strong>Codal Life (in years)<\/strong><\/th>\n<th><strong>Applicable Across Routes A to E<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Pre-2025 specification<\/td>\n<td>6 years<\/td>\n<td>Yes<\/td>\n<\/tr>\n<tr>\n<td>Version 2025 or later<\/td>\n<td>8 years<\/td>\n<td>Yes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<p><strong>What This Means<\/strong>:<\/p>\n<ul>\n<li><strong>LED signals installed before 2025<\/strong> carry a codal life of <strong>6 years<\/strong>.<\/li>\n<li><strong>LED signals meeting the 2025 specification or newer<\/strong> have an extended lifespan of <strong>8 years<\/strong>.<\/li>\n<li>Replacement is expected at or around this period unless asset condition\u2014or obsolescence\u2014indicates otherwise.<\/li>\n<\/ul>\n<p>Let me know if you&#8217;d like similar codal-life details for other signalling or telecommunication components!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Codal life of assets- LED Signals Click below link to view the Original order RBA_53 Sub:\u00a0Revised Codal life of assets. Please refer to Board\u2019s letter of even no. dated 25.05.2006 (RBA No. 25\/2006), 18.08.2006 (RBA No. 42\/2006), 12.10.2007 (RBA No. 37\/2007), 25.02.200- (RBA No. 13\/2009) and 15.03.2025 (RBA No. 5\/2025) under which instructions on revised [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[38,51,7,52,134],"tags":[4,74,50,6,559,53,529,133,523],"class_list":["post-5597","post","type-post","status-publish","format-standard","hentry","category-irctc-news","category-ministry-of-railways","category-railway","category-railway-board-circular","category-railway-circular","tag-irctc","tag-irctc-news","tag-ministry-of-railways","tag-railway","tag-railway-board-accounts-circular-2015","tag-railway-board-circular","tag-railway-board-circular-2015","tag-railway-circular","tag-railway-circular-2015"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=5597"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5597\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=5597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=5597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=5597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}