{"id":5245,"date":"2025-08-06T15:12:11","date_gmt":"2025-08-06T15:12:11","guid":{"rendered":"https:\/\/railtravels.org\/?p=5245"},"modified":"2025-08-06T15:12:11","modified_gmt":"2025-08-06T15:12:11","slug":"model-sop-2019","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/model-sop-2019\/","title":{"rendered":"Model SOP 2025"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Model SOP 2025<\/strong><\/p>\n<p><strong>Railway Board Model SOP 2025<\/strong><\/p>\n<p>A sample table of powers has been released from the Railway Board (revised edition in July 2025) for the first time to bring unity among the delegates across the zones.<\/p>\n<p><strong>Model Schedule of Power (As on 02.01.2025)<\/strong><\/p>\n<p>Revised Model Schedule of Power 2025 indicating Corrections shown in Red colour , Italic &amp; Bold font with underline including Railway Board\u2019s Correction Slips from time to time up to 31.12.18 in blue colour.<\/p>\n<p><strong>Indian Railway Model SOP 2025<\/strong><\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"499\"><strong>SOP updated including Amendment no. 49 dated 22.08.2025<\/strong><\/td>\n<td width=\"126\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/SOP-updated-including-Amendment-no.-49-dated-22.08.2019-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Click Here to <a href=\"https:\/\/drive.google.com\/open?id=1a_5EFSQSIXgojdort-Z_rmS4TL1wYzSc\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Model sop 2025 pdf<\/strong><\/a><\/p>\n<table class=\"csdtable\" style=\"width: 69.2308%;height: 336px\">\n<tbody>\n<tr style=\"height: 24px\">\n<td style=\"height: 24px\" colspan=\"2\" width=\"638\"><strong>Model\u00a0\u00a0 Schedule of Power<em> (As on 17.12.2025)<\/em><\/strong><\/td>\n<\/tr>\n<tr style=\"height: 48px\">\n<td style=\"height: 48px\" width=\"547\"><strong>Revised Model Schedule of Power 2025\u00a0 Railway Board\u2019s Correction Slip\u00a0 1 dated 17.10.2025<\/strong><\/td>\n<td style=\"height: 48px\" width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Revised-Model-Schedule-of-Power-2018-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px\">\n<td style=\"height: 48px\" width=\"547\"><strong>Letter for implementation of Revised Model SOP 2025 \/ Eastern Railway<\/strong><\/td>\n<td style=\"height: 48px\" width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Revised-Model-SOP-2018-Eastern-Railway-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 24px\">\n<td style=\"height: 24px\" width=\"547\"><strong>Correction Slip no 1 in MSOP\u00a0 \/Part \u201cB\u201d \/Medical Matters<\/strong><\/td>\n<td style=\"height: 24px\" width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Medical-Matters-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px\">\n<td style=\"height: 72px\" width=\"547\"><strong>Correction regarding Constitution\u00a0 of Tender Committee\u00a0 &amp; Accepting\u00a0\u00a0 Authority\u00a0 \u2013\u00a0\u00a0 Annexure A for works\u00a0 Contacts\u00a0\u00a0 Under\u00a0\u00a0 MSOP\u00a0 \u2013\u00a0\u00a0 2025\u00a0 Part A \/Works Matters<\/strong><\/td>\n<td style=\"height: 72px\" width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Annexure-A-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px\">\n<td style=\"height: 72px\" width=\"547\"><strong>Correction regarding Constitution\u00a0 of Tender Committee\u00a0 &amp; Accepting\u00a0\u00a0 Authority\u00a0 \u2013\u00a0\u00a0 Annexure D for works\u00a0 Contacts\u00a0\u00a0 Under\u00a0\u00a0 MSOP\u00a0 \u2013\u00a0\u00a0 2025\u00a0 Part A \/Works Matters<\/strong><\/td>\n<td style=\"height: 72px\" width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Annexure-D-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px\">\n<td style=\"height: 48px\" width=\"547\"><strong>Joint Procedure Order\u00a0 for Procurement through Spot\u00a0 Purchase\u00a0 Committee\u00a0 in\u00a0 MSOP 2025<\/strong><\/td>\n<td style=\"height: 48px\" width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Joint-Procedure-Order-for-Procurement-through-Spot-Purchase-Committee-in-MSOP-2018-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>You\u2019re referring to the <strong>Model SOP (Schedule of Powers) 2018<\/strong>, which remains the benchmark for delegation of administrative and financial authority across Indian Railways\u2014including Zonal Railways, Production Units, and Depot operations.<\/p>\n<hr \/>\n<h3>What Is the Model SOP?<\/h3>\n<ul>\n<li>Issued initially on <strong>October 26, 2025<\/strong>, and subsequently <strong>revised in 2025<\/strong> to incorporate updates, best practices, and wider delegations of power<\/li>\n<li>The document\u2019s main purpose is to standardize decision-making authority (e.g., approving tenders, granting waivers, compensation claims, refunds) across various hierarchical levels: Zonal Heads, DRMs, CHODs, PHODs, and field officers<\/li>\n<\/ul>\n<hr \/>\n<h3>Recent Updates (As of 2025)<\/h3>\n<ul>\n<li><strong>New delegation under Works Matters<\/strong>: Powers granted to EnHM officers for procurement of seedlings and saplings\u2014effective from January 2, 2025<\/li>\n<li><strong>Ongoing evolution<\/strong>: While no full reissue of Model SOP is dated &#8220;2025&#8221;, Indian Railways continues to issue <strong>Corrigendum Slips<\/strong>\u2014updates to SOP clauses, such as simplified GeM procurement norms (e.g., Corrigendum Slip No. 10, 2025) and clarifications in tender criteria<\/li>\n<\/ul>\n<hr \/>\n<h3>At a Glance<\/h3>\n<table>\n<thead>\n<tr>\n<th>Aspect<\/th>\n<th>Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>What<\/strong><\/td>\n<td>Model SOP (2025) \u2013 Delegation framework across zones and units<\/td>\n<\/tr>\n<tr>\n<td><strong>Purpose<\/strong><\/td>\n<td>Uniform empowerment of railway officers for administrative decisions<\/td>\n<\/tr>\n<tr>\n<td><strong>Recent Amendments<\/strong><\/td>\n<td>Includes new authority for EnHM in seedling procurement (2025)<\/td>\n<\/tr>\n<tr>\n<td><strong>Update Mechanism<\/strong><\/td>\n<td>Issued via Corrigendum Slips rather than full reinterpretations<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<p>If you\u2019d like the full text or recent amendments of the Model SOP applicable to your department, I can help fetch the latest circulars or connect you with official channels per your zone or unit.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Model SOP 2025 Railway Board Model SOP 2025 A sample table of powers has been released from the Railway Board (revised edition in July 2025) for the first time to bring unity among the delegates across the zones. Model Schedule of Power (As on 02.01.2025) Revised Model Schedule of Power 2025 indicating Corrections shown in [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[519],"class_list":["post-5245","post","type-post","status-publish","format-standard","hentry","category-railway","tag-model-sop-2019"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=5245"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5245\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=5245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=5245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=5245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}