{"id":5072,"date":"2025-08-10T12:38:31","date_gmt":"2025-08-10T12:38:31","guid":{"rendered":"https:\/\/railtravels.org\/?p=5072"},"modified":"2025-08-10T12:38:31","modified_gmt":"2025-08-10T12:38:31","slug":"speeding-up-of-trains-south-western-railway","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/speeding-up-of-trains-south-western-railway\/","title":{"rendered":"SPEEDING UP OF TRAINS \u2013 South Western Railway"},"content":{"rendered":"<p>SPEEDING UP OF TRAINS<\/p>\n<p>The following Trains are speeded up with revised timings will be from the dates mentioned against each.The existing timings are indicated in bracket.<\/p>\n<p>1.Train No.12736 Yesvantpur-Secunderabad Garib Rath Express will depart at Yesvantpur at 16-45 hrs. (13-30) and arrive at Secunderabad at 05-30 hrs. (04-00), with effect from 23rd Nov. 2025.<\/p>\n<p>2.Train No.12735 Secunderabad-Yesvantpur Garib Rath Express will depart at Secunderabadat 19-50 hrs. (no change) and arrive at Yesvantpur at 09-15 hrs. (11-15), with effect from 22nd Nov. 2025.<\/p>\n<p>3.Train No.16535 Mysuru-Solapur GolbumbazExpress will depart at Mysuru at 16-00 hrs. (15-30); from 01st Oct. 2015 anddepart at Yesvantpur at 19-15 hrs. (19-30) from 01st Oct. 2025 and arrive\/depart at Vijapura at 09-25\/09-30 hrs. (10-20\/10-25), from 02nd Oct. 2015.<\/p>\n<p>4.Train No.16536 Solapur-Mysuru GolbumbazExpress will arrive\/depart at Vijapura station at 16-50\/17-00 hrs. (16-40\/16-50); from 01st Oct. 2015.<\/p>\n<p>5.Train No.11048 Hubballi-Miraj Expresswill depart from Hubballi at 23-30 hrs. (23-00) and arrive at Miraj at 05-15 hrs. (no change), with effect from 01st Oct. 2025<\/p>\n<p>6.Train No.16515 Yesvantpur-Karwar Tri-Weekly Expresswill depart from Yesvantpur at 07-00 hrs. (06-30) and arrive\/depart at Arsikere at 09-55\/10-05hrs.(09-35\/09-45), with effect from 02nd Oct. 2025.<\/p>\n<p>7.Train No.11304 Kolhapur-Hyderabad Expresswill depart at Miraj 09-15 hrs. (09-00), with effect from 01st Oct. 2025.<\/p>\n<p>8.Train No.17235 Bengaluru City-Nagercoil Expresswill depart from Bengaluru City station17-15 hrs. (17-00), with effect from 01st Oct. 2015.<\/p>\n<p>9.Train No.11302 Bengaluru City-CSTM(Mumbai) Expresswill depart from Bengaluru City Station20-45 hrs. (20-30), with effect from 01st Oct. 2025.<\/p>\n<p>10.Train No.16024 Yesvantpur-Mysuru Expresswill depart from Yesvantpur station 13-15 hrs. (13-00), with effect from 01st Oct. 2015.<\/p>\n<p>11.Train No.56262 Bengaluru City -Arakkonam Passengerwill depart from Bengaluru City station09-15 hrs. (08-45), with effect from 01st Oct. 2015.<\/p>\n<p>For more information Visit South Western Railway<\/p>\n<p>Here\u2019s the latest verified information on <strong>speeding up of trains by South Western Railway (SWR)<\/strong>:<\/p>\n<hr \/>\n<h2>Speed Upgrades on SWR Routes<\/h2>\n<h3>1. <strong>Planned Upgrade to 130 km\/h on Key Sections<\/strong><\/h3>\n<p>SWR has identified several important sections targeted for upgrading to <strong>130 km\/h<\/strong>, which would notably reduce travel times:<\/p>\n<ul>\n<li><strong>Bengaluru\u2013Guntakal<\/strong><\/li>\n<li><strong>Bengaluru \u2194 Ramanagara\u2013Mandya\u2013Mysuru<\/strong><\/li>\n<li><strong>Bengaluru\u2013Jolarpettai<\/strong><\/li>\n<li><strong>Dharwad\u2013Birur<\/strong><\/li>\n<li><strong>Shivamogga Town\u2013Bengaluru<\/strong><\/li>\n<\/ul>\n<p>These upgrades would especially benefit high-speed trains like the Vande Bharat Express and Superfast Mail\/Express services currently capped at 110 km\/h. For example, the Bengaluru\u2013Dharwad run could shrink from 8\u20139 hours to roughly 5\u00bd\u20136 hours.<\/p>\n<hr \/>\n<h3>2. <strong>Already Upgraded to 110 km\/h in Select Areas<\/strong><\/h3>\n<p>SWR has successfully pushed speeds up to <strong>110 km\/h<\/strong> on multiple sections, thanks to infrastructure enhancements:<\/p>\n<ul>\n<li>Track renewal and alignment improvements (super-elevation, tamping, UNIMAT usage)<\/li>\n<li>Joints and ballast upgrades<\/li>\n<li>Removal of sharp curves and speed restrictions<\/li>\n<\/ul>\n<p>Notably, the <strong>Yelahanka\u2013Chikballapur<\/strong> stretch (46 km) is now cleared for 110 km\/h operations, up from earlier speed caps of 50 km\/h and 75 km\/h.<\/p>\n<hr \/>\n<h3>3. <strong>Punctuality and Mobility Gains Across Zones<\/strong><\/h3>\n<ul>\n<li>In <strong>2022\u201323<\/strong>, SWR recorded a staggering <strong>53% improvement in train mobility<\/strong>.\n<ul>\n<li>Average speed of goods trains (including stabling) rose from <strong>13.97 km\/h to 21.6 km\/h<\/strong>.<\/li>\n<li>This was enabled by major infrastructure enhancements such as commissioning of bypass lines, doubling of tracks, and extensive electrification<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h3>4. <strong>Festive Rush Speed Optimizations<\/strong><\/h3>\n<p>In <strong>October 2022<\/strong>, in anticipation of increased festive travel, SWR accelerated the running times of <strong>55 trains<\/strong>, achieving a cumulative <strong>saving of 1,795 minutes (approx. 30 hours)<\/strong> across services.<\/p>\n<ul>\n<li>For instance, the <strong>Bagalkot\u2013Mysuru passenger<\/strong> saved over <strong>2 hours<\/strong>, while the <strong>Chhatrapati Shivaji TN\u2013Bengaluru Udyan Express<\/strong> was sped up by <strong>110 minutes<\/strong><\/li>\n<\/ul>\n<hr \/>\n<h2>Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Type of Speed Improvement<\/th>\n<th>Key Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Planned 130 km\/h upgrades<\/strong><\/td>\n<td>Upgrading major SWR routes (e.g., Bengaluru\u2013Dharwad, Mysuru, Guntakal)<\/td>\n<\/tr>\n<tr>\n<td><strong>Existing 110 km\/h zones<\/strong><\/td>\n<td>Select stretches like Yelahanka\u2013Chikballapur have been upgraded<\/td>\n<\/tr>\n<tr>\n<td><strong>Mobility enhancement (2025\u201323)<\/strong><\/td>\n<td>Mobility up 53%; goods train speeds significantly increased<\/td>\n<\/tr>\n<tr>\n<td><strong>Festive rush optimizations (2025)<\/strong><\/td>\n<td>55 trains expedited, saving ~30 hours cumulatively of travel time<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>What This Means for Passengers<\/h2>\n<ul>\n<li>Faster travel on key SWR corridors is becoming a reality, with upgrades already in place and more underway.<\/li>\n<li>Increased punctuality and smoother operations, especially in the goods transport segment, reflect better network efficiency.<\/li>\n<li>During peak seasons, proactive schedule optimizations offer tangible time savings for travelers.<\/li>\n<\/ul>\n<hr \/>\n<p>Would you like more specifics\u2014like exact speeds, updated timetables, or status on the 130 km\/h upgrade rollout? Happy to dig deeper!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SPEEDING UP OF TRAINS The following Trains are speeded up with revised timings will be from the dates mentioned against each.The existing timings are indicated in bracket. 1.Train No.12736 Yesvantpur-Secunderabad Garib Rath Express will depart at Yesvantpur at 16-45 hrs. (13-30) and arrive at Secunderabad at 05-30 hrs. (04-00), with effect from 23rd Nov. 2025. [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,38,7,91,116],"tags":[4,74,6,78,117,275,449,450,451,452,453,454,455,456,457,458,459],"class_list":["post-5072","post","type-post","status-publish","format-standard","hentry","category-irctc","category-irctc-news","category-railway","category-railway-news","category-south-western-railway","tag-irctc","tag-irctc-news","tag-railway","tag-railway-news","tag-south-western-railway","tag-speeding-up-of-trains","tag-train-no-16515","tag-train-no-11048","tag-train-no-11302","tag-train-no-11304","tag-train-no-12735","tag-train-no-12736","tag-train-no-16024","tag-train-no-16535","tag-train-no-16536","tag-train-no-17235","tag-train-no-56262"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=5072"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5072\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=5072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=5072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=5072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}