{"id":5061,"date":"2025-08-03T12:32:13","date_gmt":"2025-08-03T12:32:13","guid":{"rendered":"https:\/\/railtravels.org\/?p=5061"},"modified":"2025-08-03T12:32:13","modified_gmt":"2025-08-03T12:32:13","slug":"model-schedule-of-power-2020","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/model-schedule-of-power-2020\/","title":{"rendered":"Model Schedule of Power 2025"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Model Schedule of Power 2025<\/strong><\/p>\n<h3><strong>Latest Schedule of Powers Indian Railways 2025<\/strong><\/h3>\n<p>There are 18 Railway zones; almost all zones are declared in Model Schedule of Power. These zones are Northern Railway, Central Railway, Western Railway, Eastern Railway, North Western, Southern Railway, South Eastern, South Central, West Central, Konkan Railway in India<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"463\"><strong>SOP updated including Amendment no.54 dated 01.06.2025<\/strong><\/td>\n<td width=\"96\"><a href=\"https:\/\/www.reilsolar.com\/train\/sop-updated-including-amendment-no-54-dated-01-06-2020\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"547\"><strong>Revised Model Schedule of Power-2025 indicating Corrections shows in Red Color, Italic &amp; Bold font with underline including Railway Board\u2019s Correction Slips from time to time in blue color as on<em> 26.11.2025<\/em><\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/drive.google.com\/file\/d\/1a8--mqnN38FZCogvfii0LhQVFIZ1UsWf\/view?usp=sharing\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Revised Model Schedule of Power-2025 indicating Corrections shows in Red Color, Italic &amp; Bold font with underline including Railway Board\u2019s Correction Slips from time to time in blue color as on<em> 01.09.2025<\/em><\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/drive.google.com\/file\/d\/1o3k9GesgnriRWtgArQbnPLcvBBc7_qbZ\/view?usp=sharing\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Revised Model Schedule of Power-2025 indicating Corrections shows in Red Color, Italic &amp; Bold font with underline including Railway Board\u2019s Correction Slips from time to time in blue color as on<em> 05.03.2025<\/em> (Revised Model SOP 2025 : 05-03-2025)<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/drive.google.com\/open?id=18SZoWX2n4m46Yun3M67IhAxTJv3BUa_Y\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Corrigendum for Constitution of Tender Committee and Accepting Authority for Works Tenders under Annexure-\u201cA\u201d of Note No.4 of MSOP\/2018 Pt.A Works Matters as on<em> 05.03.2025<\/em><\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/msop-5.3.20.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Model SOP 2025<\/strong><\/p>\n<p><strong>Model SOP Indian Railways<\/strong><\/p>\n<p>A sample table of powers has been released from the Railway Board (revised edition in July 2025) for the first time to bring unity among the delegates across the zones.<\/p>\n<p><strong>Model Schedule of Power (As on 02.01.2025)<\/strong><\/p>\n<p>Revised Model Schedule of Power 2025 indicating Corrections shown in Red colour, Italic &amp; Bold font with underline including Railway Board\u2019s Correction Slips from time to time up to 31.12.18 in blue colour.<\/p>\n<p><strong>Indian Railway Model SOP 2025<\/strong><\/p>\n<p>&nbsp;<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"499\"><strong>SOP updated including Amendment no. 49 dated 22.08.2025<\/strong><\/td>\n<td width=\"126\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/SOP-updated-including-Amendment-no.-49-dated-22.08.2019.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Click Here to <a href=\"https:\/\/drive.google.com\/open?id=1a_5EFSQSIXgojdort-Z_rmS4TL1wYzSc\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Model sop 2025<\/strong><\/a><\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td colspan=\"2\" width=\"638\"><strong>Model\u00a0\u00a0 Schedule of Power<em> (As on 17.12.2025)<\/em><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Revised Model Schedule of Power 2018\u00a0 Railway Board\u2019s Correction Slip\u00a0 1 dated 17.10.2025<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Revised-Model-Schedule-of-Power-2018.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Letter for implementation of Revised Model SOP 2025 \/ Eastern Railway<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Revised-Model-SOP-2018-Eastern-Railway.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Correction Slip no 1 in MSOP\u00a0 \/Part \u201cB\u201d \/Medical Matters<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Medical-Matters.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Correction regarding Constitution\u00a0 of Tender Committee\u00a0 &amp; Accepting\u00a0\u00a0 Authority\u00a0 \u2013\u00a0\u00a0 Annexure A for works\u00a0 Contacts\u00a0\u00a0 Under\u00a0\u00a0 MSOP\u00a0 \u2013\u00a0\u00a0 2025\u00a0 Part A \/Works Matters<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Annexure-A.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Correction regarding Constitution\u00a0 of Tender Committee\u00a0 &amp; Accepting\u00a0\u00a0 Authority\u00a0 \u2013\u00a0\u00a0 Annexure D for works\u00a0 Contacts\u00a0\u00a0 Under\u00a0\u00a0 MSOP\u00a0 \u2013\u00a0\u00a0 2025\u00a0 Part A \/Works Matters<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Annexure-D.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"547\"><strong>Joint Procedure Order\u00a0 for Procurement through Spot\u00a0 Purchase\u00a0 Committee\u00a0 in\u00a0 MSOP 2025<\/strong><\/td>\n<td width=\"91\"><a href=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Joint-Procedure-Order-for-Procurement-through-Spot-Purchase-Committee-in-MSOP-2018.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>It appears you&#8217;re referencing the <strong>Model Schedule of Powers (SOP)<\/strong> for 2025 within Indian Railways, which is a framework defining <strong>delegation of administrative and financial authority<\/strong> across various organizational levels (e.g., Railway Board, zonal heads, DRMs, workshops, divisions, and departments).<\/p>\n<hr \/>\n<h2>\ud83d\uddc2\ufe0f What Is the Model Schedule of Powers?<\/h2>\n<ul>\n<li>The <strong>Model SOP<\/strong> is a governance tool issued by the Railway Board, updated in <strong>2025<\/strong> with correction slips since, to standardize decision-making authority across the organization<br \/>\n([turn0search4]\ue202turn0search16\ue201).<\/li>\n<li>It outlines tiered powers for approvals\u2014such as works contracts, commercial charges (fares, freight, demurrage), staff claims, concessions, IT expenditures, and medical\/stores procedures\u2014delegated to different officials and functional heads.<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83c\udfaf Key Details &amp; Utility<\/h2>\n<ul>\n<li>Introduced initially in <strong>October 2017<\/strong>, the revised <strong>Model SOP 2025<\/strong> brought clarity and uniformity on subjects like:\n<ul>\n<li><em>Wharfage refunds<\/em>, <em>demurrage waivers<\/em>, <em>life\/property claims<\/em>, <em>freight\/fare authority limits<\/em>, to empower Divisional Railway Managers (DRMs) and departmental heads<br \/>\n([turn0search4]\ue202turn0search16\ue201).<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udd0d Is There a \u201cModel Schedule of Power 2025\u201d?<\/h2>\n<ul>\n<li>As of <strong>mid\u20112025<\/strong>, no new version titled <strong>\u201cModel Schedule Of Power 2025\u201d<\/strong> has been officially issued by the Railway Board.<\/li>\n<li>The existing <strong>2025 model SOP<\/strong>\u2014with its correction slips and updates\u2014continues to be the active guideline used across zones and divisions (~<strong>Model SOP\u20112025<\/strong>)<br \/>\n([turn0search4]\ue202turn0search16\ue201).<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udcca Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Attribute<\/th>\n<th>Detail<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Document Name<\/strong><\/td>\n<td>Model Schedule of Powers (SOP)<\/td>\n<\/tr>\n<tr>\n<td><strong>Latest Issued Version<\/strong><\/td>\n<td>2018 (with subsequent corrections)<\/td>\n<\/tr>\n<tr>\n<td><strong>Purpose<\/strong><\/td>\n<td>Delegation of financial\/admin powers across levels<\/td>\n<\/tr>\n<tr>\n<td><strong>Applicability in 2025<\/strong><\/td>\n<td>SOP\u20112018 still current, no separate 2025 version<\/td>\n<\/tr>\n<tr>\n<td><strong>Areas Covered<\/strong><\/td>\n<td>Contracts, compensation, claims, fares, concessions, etc.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\u2705 What You Can Do Next<\/h2>\n<ul>\n<li>If you work within Indian Railways or require specific powers in areas such as negotiations, staff claims, or financial approvals:\n<ul>\n<li>Refer to <strong>Model SOP 2025<\/strong> and check the applicable <strong>correction slips<\/strong> for latest delegated limits.<\/li>\n<\/ul>\n<\/li>\n<li>If you&#8217;re interested in powers allocated to a specific office (e.g. DRM, CGM, DRM Commercial, Workshop Manager), I can help fetch those details.<\/li>\n<\/ul>\n<hr \/>\n<p>Would you like an excerpt of power limits for a particular department\u2014such as <strong>refund claims<\/strong>, <strong>freight waivers<\/strong>, <strong>works contracts<\/strong>, or <strong>medical cases<\/strong>\u2014per the Model SOP?<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Model Schedule of Power 2025 Latest Schedule of Powers Indian Railways 2025 There are 18 Railway zones; almost all zones are declared in Model Schedule of Power. These zones are Northern Railway, Central Railway, Western Railway, Eastern Railway, North Western, Southern Railway, South Eastern, South Central, West Central, Konkan Railway in India SOP updated including [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[439,6],"class_list":["post-5061","post","type-post","status-publish","format-standard","hentry","category-railway","tag-model-sop","tag-railway"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5061","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=5061"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/5061\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=5061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=5061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=5061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}