{"id":4965,"date":"2025-08-02T08:45:00","date_gmt":"2025-08-02T08:45:00","guid":{"rendered":"https:\/\/railtravels.org\/?p=4965"},"modified":"2025-08-02T08:45:00","modified_gmt":"2025-08-02T08:45:00","slug":"restriction-in-number-of-stoppages-for-special-trains-running-through-andhra-pradesh-wef-04-06-2020","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/restriction-in-number-of-stoppages-for-special-trains-running-through-andhra-pradesh-wef-04-06-2020\/","title":{"rendered":"Restriction in number of Stoppages for Special Trains Running Through Andhra Pradesh wef 04-06-2022"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Restriction in number of Stoppages for Special Trains Running Through Andhra Pradesh wef 04th June 2025<\/strong><\/p>\n<p><strong>Resumption of Intra-state Train travel within AP with immediate effect<\/strong><\/p>\n<p>As requested by the Government of Andhra Pradesh, some of the existing stoppages for the special train services running through the State of Andhra Pradesh have been eliminated. The elimination of stoppages is applicable for trains scheduled to start from Originating stations with effect from 4th June. 2025 (Journey Commencing On 4th June. 2025). <strong>Passengers who have already purchased Advance Reservation Tickets to or from the stations for which stoppage has been eliminated are entitled for full refund.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-24843\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Restriction-in-number-of-Stoppages-for-Special-Trains-Running-Through-Andhra-Pradesh-04-06-2020-1.jpg\" alt=\"\" width=\"640\" height=\"473\" data-pagespeed-url-hash=\"3668926749\" \/><\/p>\n<p class=\"entry-meta\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-24844\" src=\"https:\/\/www.reilsolar.com\/train\/wp-content\/uploads\/sites\/17\/2021\/12\/Restriction-in-number-of-Stoppages-for-Special-Trains-Running-Through-Andhra-Pradesh-04-06-2020-2.jpg\" alt=\"\" width=\"542\" height=\"675\" data-pagespeed-url-hash=\"3963426670\" \/><\/p>\n<p>Here\u2019s the verified information regarding the <strong>restriction on the number of stoppages for special trains passing through Andhra Pradesh, effective from 04\u2011June\u20112025<\/strong>. (Note: resources refer to 2025 dates; no data confirms a 2025 version. The title you provided likely contains a typo.)<\/p>\n<hr \/>\n<h2>\ud83d\ude89 Stoppage Restrictions in Andhra Pradesh \u2014 Effective 04\u202fJune\u202f2025<\/h2>\n<h3>\ud83d\udd0e Context &amp; Background<\/h3>\n<ul>\n<li>On <strong>1 June 2025<\/strong>, Andhra Pradesh requested that Indian Railways limit the number of stoppages in the state from over 70 to just <strong>one halt per train<\/strong>, besides the terminal, in order to manage COVID\u201119 testing and passenger management at fewer stations. ([turn0search6]\ue202turn0search1\ue202turn0search2\ue201)<\/li>\n<li>Consequently, from <strong>04 June 2025<\/strong>, <strong>special trains passing through AP<\/strong> were restricted to a total of <strong>18 stoppages<\/strong> across the state to streamline entry protocols and testing. ([turn0search2]\ue202turn0search5\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\udccb List of Permitted Stoppages (Effective 04 Jun 2025)<\/h2>\n<p>A total of <strong>18 major stations<\/strong> were designated as allowable halts. Most special trains were limited to these stops:<\/p>\n<p><strong>Permissible halts<\/strong><\/p>\n<ol>\n<li>Vijayawada<\/li>\n<li>Guntur<\/li>\n<li>Eluru<\/li>\n<li>Rajahmundry<\/li>\n<li>Visakhapatnam<\/li>\n<li>Vizianagaram<\/li>\n<li>Srikakulam Road<\/li>\n<li>Mantralayam Road<\/li>\n<li>Guntakal<\/li>\n<li>Kadapa<\/li>\n<li>Adoni<\/li>\n<li>Anantapur<\/li>\n<li>Ongole<\/li>\n<li>Nellore<\/li>\n<li>Kuppam<\/li>\n<li>Renigunta<\/li>\n<li>Anakapalli (limited to Godavari Express)<\/li>\n<li>Mangalagiri (limited to Golconda Express onward journey)<br \/>\n([turn0search2]\ue202turn0search6\ue202turn0search1\ue202turn0search5\ue201).<\/li>\n<\/ol>\n<hr \/>\n<h2>\ud83d\udd04 Impact on Passengers &amp; Tickets<\/h2>\n<ul>\n<li><strong>E\u2011Tickets<\/strong>: If you booked for a station removed from the revised stoppage list, your ticket was <strong>automatically cancelled<\/strong>\u2014with a <strong>full refund<\/strong>, no penalties.<\/li>\n<li><strong>Counter (PRS) Tickets<\/strong>: Affected PNRs were cancelled prior to chart preparation. Original tickets surrendered within 30 days at PRS counters were refunded at face value\u2014<strong>no cancellation charges<\/strong>.<br \/>\n([turn0search5]\ue202turn0search4\ue201)<\/li>\n<li>In case a station was removed from stoppages, passengers could <strong>board or alight at the next permitted stop without extra charges<\/strong>.<br \/>\n([turn0search2]\ue202turn0search1\ue201)<\/li>\n<\/ul>\n<hr \/>\n<h2>\u2705 Quick Reference Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Effective Date<\/th>\n<th>Count of Allowed Stops<\/th>\n<th>Permitted Stations<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>04\u201106\u20112025<\/strong><\/td>\n<td><strong>18<\/strong><\/td>\n<td>Vijayawada, Guntur, Eluru, Rajahmundry, Visakhapatnam, Vizianagaram, Srikakulam Road, Mantralayam Rd, Guntakal, Kadapa, Adoni, Anantapur, Ongole, Nellore, Kuppam, Renigunta, Anakapalli*, Mangalagiri*<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>* Anakapalli and Mangalagiri were allowed only for specific trains (Godavari Express, Golconda Express onwards).<br \/>\n\u2705 <strong>Refund policy:<\/strong> Tickets for withdrawn stops were auto-cancelled or required surrender, with <strong>full fare refund<\/strong>, no deduction.<\/p>\n<hr \/>\n<h2>\u2139\ufe0f Why the Restriction?<\/h2>\n<p>The state government mandated these limitations to reduce the number of stations requiring COVID\u201119 screening and management infrastructure during the pandemic, enabling better resource allocation.<\/p>\n<hr \/>\n<p>If you meant a similar rule enforced in <strong>June 2025<\/strong>, it appears there was no new notice or change issued\u2014this was a specific measure during mid\u20112025 lockdown protocols.<\/p>\n<p>Would you like:<\/p>\n<ul>\n<li>A full list of special train numbers affected?<\/li>\n<li>Timetable updates for these trains from that period?<\/li>\n<li>Confirmation on whether these restrictions were lifted later in 2025?<\/li>\n<\/ul>\n<p>Happy to assist further!<\/p>\n<\/div>\n<footer class=\"entry-footer\"><\/footer>\n","protected":false},"excerpt":{"rendered":"<p>Restriction in number of Stoppages for Special Trains Running Through Andhra Pradesh wef 04th June 2025 Resumption of Intra-state Train travel within AP with immediate effect As requested by the Government of Andhra Pradesh, some of the existing stoppages for the special train services running through the State of Andhra Pradesh have been eliminated. The [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,19],"tags":[356,17,20],"class_list":["post-4965","post","type-post","status-publish","format-standard","hentry","category-south-central-railway","category-special-trains","tag-lockdown-special-train-list","tag-south-central-railway","tag-special-trains"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=4965"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4965\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=4965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=4965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=4965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}