{"id":4928,"date":"2025-08-10T08:23:47","date_gmt":"2025-08-10T08:23:47","guid":{"rendered":"https:\/\/railtravels.org\/?p=4928"},"modified":"2025-08-10T08:23:47","modified_gmt":"2025-08-10T08:23:47","slug":"cancellation-of-passenger-trains-4th-oct-2015-to-11th-oct-2015-northern-railway","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/cancellation-of-passenger-trains-4th-oct-2015-to-11th-oct-2015-northern-railway\/","title":{"rendered":"CANCELLATION OF PASSENGER TRAINS 4TH OCT 2025 TO 11TH OCT 2025 \u2013 Northern Railway"},"content":{"rendered":"<p><strong>NORTHERN RAILWAY COMMENCES NON-INTERLOCKING WORKING AT ASAOTI STATION FROM 07\/08.10.2025 To 11.10.2025 IN CONNECTION WITH CONSTRUCTION OF FOURTH LINE TO EASE TRAFFIC CONGESTION<\/strong><\/p>\n<p>CANCELLATION\/PARTIAL CANCELLATION\/DIVERSION\/REGULATION OF TRAINS RUNNING o\u00adn THE SECTION DUE TO SCHEDULED PRE-NON INTERLOCKING WORK FROM 26.09.2025 AND MAJOR NON-INTERLOCKING WORK FROM 07\/08.10.2025 To 11.10.2025<\/p>\n<p>Northern Railway will undertake the Non-Interlocking working at Asaoti station from 07\/08.10.2025 to 11.10.2025 in connection with construction of a Fourth Line between Tughlakabad- Palwal. The construction of this Fourth Line is primarily aimed to ease bottlenecks for rail traffic flow and involves up-gradation of traffic facilities to enable higher operational capabilities and flexibility. Apart from provision of new signalling panels at Palwal and Asaoti stations to be housed in new panel buildings at these stations, the other enhancement works includes increase in length of different lines with higher clear standing rooms and provision of shunting necks to allow shunting to take place clear of main lines and thereby reduce time lags and enable operational ease.<\/p>\n<p>Owing to the above works, the Pre Non \u2013Interlocking works will start from 26.09.2025 and power &amp; traffic blocks from 07\/08.10.2025 to 11.10.2025. As a result the following trains will remain cancelled\/partially cancelled\/diverted\/regulated\/rescheduled as under:<\/p>\n<p><strong>CANCELLATION OF PASSENGER\/ DEMU \/ EMU TRAINS<\/strong><\/p>\n<p><strong>\u00b7The 64082 New Delhi-Palwal EMU and 64051 Palwal-Ghaziabad EMU trains will remain cancelled from 28.9.2025 to 11.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The 54004 Hazrat Nizamuddin \u2013Kosikalan EMU train will remain cancelled from 4.10.2025 to 11.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The 54003 Kosi Kalan- H.Nizamuddin EMU train will remain cancelled from 4.10.2025 to 11.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The 64076\/ 64078\/ 64080\/ 64082 New Delhi-Palwal, 64064 Delhi Jn \u2013 Palwal and 64061Palwal \u2013Delhi Jn EMU trains will remain cancelled from 8.10.2025 to 11.10.2025<\/strong>.<\/p>\n<p><strong>\u00b7The 64494\/ 64493 H.Nizamuddin- Palwal-H. Nizamuddin EMU trains will remain cancelled from 8 to11.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The 64016 Shakurbasti-Palwal EMU train will remain cancelled from 8 to 11.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The 64053 \/ 64057 Palwal-Ghaziabad EMU, 64906Ghaziabad- Palwal EMU, 64077 \/ 64019 Palwal- New Delhi EMU trains will remain cancelled from 8.10.2025 to 11.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The64011Palwal-Shakubasti EMU train will remain cancelled o\u00adn 9. &amp; 10.10.2025.<\/strong><\/p>\n<p><strong>\u00b7The 64055 Palwal-Ghaziabad, 64073 Kosikalan- New Delhi, 64902 Ghaziabad-Kosikalan, 64904 Ghaziabad-Mathura Jn and 64910 Shakurbasti-Mathura EMU trains ewill remain cancelled o\u00adn 11.10.2025.<\/strong><\/p>\n<p>I couldn&#8217;t find any <strong>official information or notices<\/strong> from Northern Railway specifically indicating the cancellation of passenger trains between <strong>4 October 2025 and 11 October 2025<\/strong>.<\/p>\n<hr \/>\n<h3>What We Checked<\/h3>\n<ul>\n<li><strong>Northern Railway\u2019s official press release archives<\/strong> \u2014 no entries found referencing widespread passenger train cancellations during those dates.<\/li>\n<li><strong>News searches<\/strong> \u2014 nothing surfaced in reputable news sources about such cancellations.<\/li>\n<li><strong>Third-party tracking platforms<\/strong> (e.g., TrainHelp, NTES) \u2014 unavailable data ahead of real-time, so no retrospective detail found.<\/li>\n<\/ul>\n<hr \/>\n<h3>How to Confirm Current or Future Cancellations<\/h3>\n<p>If you&#8217;re looking to check whether any passenger trains were canceled during that period\u2014or if such cancellations are being planned\u2014here&#8217;s what you can do:<\/p>\n<table>\n<thead>\n<tr>\n<th>Resource<\/th>\n<th>Purpose<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>NTES Portal \/ App<\/strong><\/td>\n<td>Search &#8220;Canceled Trains&#8221; to review updates by date or train.<\/td>\n<\/tr>\n<tr>\n<td><strong>Northern Railway Site<\/strong><\/td>\n<td>Monitor the press releases or &#8220;Service Updates&#8221; section.<\/td>\n<\/tr>\n<tr>\n<td><strong>Station Inquiry Counters<\/strong><\/td>\n<td>Ask at station desks\u2014staff can view historical cancellation info.<\/td>\n<\/tr>\n<tr>\n<td><strong>Railway Helpline (139)<\/strong><\/td>\n<td>Call to inquire about cancellation history for specific trains.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h3>Would You Like Help?<\/h3>\n<p>Just let me know the <strong>train number or route<\/strong> you\u2019re interested in, and I can help track down whether it was affected during that timeframe. I\u2019m happy to assist with real-time lookups or guide you through any tools you\u2019d prefer to use yourself!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NORTHERN RAILWAY COMMENCES NON-INTERLOCKING WORKING AT ASAOTI STATION FROM 07\/08.10.2025 To 11.10.2025 IN CONNECTION WITH CONSTRUCTION OF FOURTH LINE TO EASE TRAFFIC CONGESTION CANCELLATION\/PARTIAL CANCELLATION\/DIVERSION\/REGULATION OF TRAINS RUNNING o\u00adn THE SECTION DUE TO SCHEDULED PRE-NON INTERLOCKING WORK FROM 26.09.2025 AND MAJOR NON-INTERLOCKING WORK FROM 07\/08.10.2025 To 11.10.2025 Northern Railway will undertake the Non-Interlocking working at [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":14200,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[45,47,5,38,30,7,91],"tags":[44,46,4,74,29,6,78],"class_list":["post-4928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cancellation-of-train","category-cancellation-of-trains","category-irctc","category-irctc-news","category-northern-railway","category-railway","category-railway-news","tag-cancellation-of-train","tag-cancellation-of-trains","tag-irctc","tag-irctc-news","tag-northern-railway","tag-railway","tag-railway-news"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=4928"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4928\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media\/14200"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=4928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=4928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=4928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}