{"id":4927,"date":"2025-08-10T08:23:46","date_gmt":"2025-08-10T08:23:46","guid":{"rendered":"https:\/\/railtravels.org\/?p=4927"},"modified":"2025-08-10T08:23:46","modified_gmt":"2025-08-10T08:23:46","slug":"diversion-of-trains-on-9th-oct-to-11th-oct15-due-to-non-interlocking-working-at-asaoti-station","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/diversion-of-trains-on-9th-oct-to-11th-oct15-due-to-non-interlocking-working-at-asaoti-station\/","title":{"rendered":"DIVERSION OF TRAINS ON 9th Oct to 11th Oct\u201915 \u2013 DUE TO NON-INTERLOCKING WORKING AT ASAOTI STATION"},"content":{"rendered":"<p><strong>NON-INTERLOCKING WORKING AT ASAOTI STATION FROM 07\/08.10.2025 To 11.10.2025<\/strong><\/p>\n<p><strong>NORTHERN RAILWAY COMMENCES NON-INTERLOCKING WORKING AT ASAOTI STATION FROM 07\/08.10.2025 To 11.10.2025 IN CONNECTION WITH CONSTRUCTION OF FOURTH LINE TO EASE TRAFFIC CONGESTION<\/strong><\/p>\n<p><strong>CANCELLATION\/PARTIAL CANCELLATION\/DIVERSION\/REGULATION OF TRAINS RUNNING o\u00adn THE SECTION DUE TO SCHEDULED PRE-NON INTERLOCKING WORK FROM 26.09.2025 AND MAJOR NON-INTERLOCKING WORK FROM 07\/08.10.2025 To 11.10.2025<\/strong><\/p>\n<p>Northern Railway will undertake the Non-Interlocking working at Asaoti station from 07\/08.10.2025 to 11.10.2025 in connection with construction of a Fourth Line between Tughlakabad- Palwal. The construction of this Fourth Line is primarily aimed to ease bottlenecks for rail traffic flow and involves up-gradation of traffic facilities to enable higher operational capabilities and flexibility. Apart from provision of new signalling panels at Palwal and Asaoti stations to be housed in new panel buildings at these stations, the other enhancement works includes increase in length of different lines with higher clear standing rooms and provision of shunting necks to allow shunting to take place clear of main lines and thereby reduce time lags and enable operational ease.<\/p>\n<p><strong>Owing to the above works, the Pre Non \u2013Interlocking works will start from 26.09.2025 and power &amp; traffic blocks from 07\/08.10.2025 to 11.10.2025.<\/strong>\u00a0As a result the following trains will remain cancelled\/partially cancelled\/diverted\/regulated\/rescheduled as under:<\/p>\n<p><strong>DIVERSION OF TRAINS<\/strong><\/p>\n<p><em><strong>Trains to run via Meerut City-Khurja-Mitawali-Agra Cantt.<\/strong><\/em><\/p>\n<p>\u00b7<strong>The 18238 Amritsar Jn. \u2013 Bilaspur Jn. Chhatisgarh Express8 to 11.10.2025 and 18478 Haridwar Jn -Puri Kalinga Utkal Express trains of 11.10.2015<\/strong><\/p>\n<p>\u00b7<strong>The 14318 Dehradun Indore Jn. Dehradun Indore Express &amp; 12688 Dehradun \u2013 Madhurai SF Express trains of 9.10.2015<\/strong>.<\/p>\n<p>\u00b7<strong>The 12172 Haridwar \u2013 Lokmanya Tilak T. Superfast Express train of 10.10.2025.<\/strong><\/p>\n<p>\u00b7<strong>The 19326 Amritsar Jn. \u2013 Indore Jn. Amritsar Indore Expresstrain of 11.10.2025.<\/strong><\/p>\n<p>\u00b7<strong>The 12688 Dehradun-Madurai Superfast Express of 9.10.2025.<\/strong><\/p>\n<p><em><strong>Trains to run via Rohtak \u2013 Asthal Bohar \u2013 Rewari \u2013 Alwar \u2013 Mathura Jn<\/strong><\/em><\/p>\n<p>\u00b7The 13008 Sriganganagar- Howrah Udyan Abha Toofan express train of 8,9,10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 11450 Jammu Tawi (Shri Mata Vaishno Devi Katra)- Jabalpur express train of 8.10.2025.<\/p>\n<p>\u00b7The 12486 Shriganganagar \u2013 Nanded Express train of 9 &amp;10.10.2025.<\/p>\n<p>\u00b7The 16688 Jammu Tawi \u2013 Mangalore Navyug express train of 9.10.2025.<\/p>\n<p>\u00b7The 16032 Chennai-Jammu Tawi Andaman Express train of 10 &amp;11.10.2025.<\/p>\n<p><em><strong>Trains to run via Chipyana Buzurg \u2013 Khurja-Mitawali-Agra Cantt.<\/strong><\/em><\/p>\n<p>\u00b7The 12652 Hazarat Nizamuddin \u2013 Madurai Jn. Tamil Nadu Sampark Kranti Express train of 8.10.2025.<\/p>\n<p>\u00b7The 12808 Hazarat Nizamuddin \u2013 Visakhapatnam Samta Express trainof 8 &amp; 9.10.2025.<\/p>\n<p>\u00b7The 11078 Jammu Tawi \u2013 Pune Jn. Jhelum Expresstrain of 8, 10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 12708 Hazrat Nizamuddin \u2013 Tirupati A P Sampark Kranti Express train of 9 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 14624 Delhi Sarai Rohilla \u2013 Chhindwara Patalkolt Express train of 9, 10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 12642 Hazrat Nizamuddin \u2013 Kanniyakumari Thirukkural Express train of 10.10.2025.<\/p>\n<p>\u00b7The 12780 Hazrat Nizamuddin \u2013 Vasco Da Gama Goa Express train of 10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 12626 New Delhi \u2013 Trivandrum Central Kerala Express train of 8, 10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 12724 New Delhi \u2013 Hyderabad Decan A P Express train of 8,9 &amp; 10.10.2025.<\/p>\n<p>\u00b7The 12628 New Delhi \u2013 Bangalore City Jn. Karnataka Express train of 7, 8,9,10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 12622 New Delhi \u2013 Chennai Central Tamilnadu Express train of 7 &amp; 8.10.2025.<\/p>\n<p>\u00b7The 12716 Nanded-Amritsar-Nanded Sachkhand Express train will be diverted to run via of 9,10 &amp; 11.10.2025.<\/p>\n<p>\u00b7The 12724 New Delhi \u2013 Hyderabad Decan A P Express train of 8,9 &amp; 10.10.2025.<\/p>\n<p>\u00b7The 22456 Kalka \u2013 Sainagar Shirdi Superfast Express train of 9.10.2025.<\/p>\n<p>\u00b7The 12406 Hazrat Nizamuddin \u2013 Bhusaval Jn. Gondwana Express train of 11.10.2025.<\/p>\n<p>\u00b7The 12722 H.Nizamuddin \u2013 Hyderabad Dakshin Express train of 7, &amp; 8.10.2025.<\/p>\n<p><em><strong>Trains to run via Patel Nagar \u2013 Rewari \u2013 Kota<\/strong><\/em><\/p>\n<p>\u00b7The 22918 Haridwar \u2013 Bandra Terminus Super Fast Express train of 8.10.2025.<\/p>\n<p>\u00b7The 19806 Udhampur \u2013 Kota Express train of 9.10.2025<\/p>\n<p>\u00b7The 22656 Hazrat Nizamuddin \u2013 Trivendrum express, 12218 Chandigarh \u2013 Kochuveli Kerala Express and 22634 H. Nizamuddin \u2013 Trivendrum SF Express trains of 9.10.2015<\/p>\n<p>\u00b7The 12432 Hazrat Nizamuddin \u2013 Trivandrum Central Trivandrum Rajdhani Express train of 11.10.2025.<\/p>\n<p>\u00b7The 12218 Chandigarh-Kochuveli sampark Kranti Express of 9.10.2025.<\/p>\n<p>\u00b7The 22634 H. Nizamuddin-Trivandrum superfast Express of 9.10.2025.<\/p>\n<p>.Trains to run via Agra Cantt. \u2013 Meetawali \u2013 Khurja \u2013 Chipyana Buzurg<\/p>\n<p>\u00b7The 14623 Chhindwara \u2013 Delhi Sarai Rohilla Patalkot Express train of 8. 10 &amp; 11.10.2025<\/p>\n<p>\u00b7The 12447 Manikpur Jn. \u2013 Hazrat Nizamuddin U P Sampark Kranti &amp; 12615 Chennai Central \u2013 New Delhi Grand Trunk Express trains of 8. 9, 10 &amp; 11.10.2025<\/p>\n<p>\u00b7The 12715 Nanded-Amritsar Sachkhand Express train of 8, 10 &amp; 11.10.2015<\/p>\n<p>\u00b7The 12617 Eranakulam Jn. \u2013 Hazrat Nizamuddin Mangala Lakshdweep Express train of 3 to 11.10.2025<\/p>\n<p>\u00b7The 12625 Trivandrum Central \u2013 New Delhi Kerala Express train of ,8,10 &amp; 11.10.2025<\/p>\n<p>\u00b7The 12707 Tirupati \u2013 Hazrat Nizamuddin A P Sampark Kranti Express train of 8 &amp; 10.10.2025.<\/p>\n<p>\u00b7The 22403 Pondicherry \u2013 New Delhi Express of 2 &amp; 9.10.2025 &amp; 12641 Kanyakumari \u2013 H.Nizamuddin Tirukkural Express of 9.10.2025<\/p>\n<p>\u00b7The 22457 Hazor Sahib Nanded \u2013 Una Himachal Nanded Una Himachal SuperFast Express, 12807 Vishakhapatnam \u2013 H. Nizamuddin Sampta Express and 12781 Mysore \u2013 H.Nizamuddin Swarna Jayanti Express trains of 11.10.2015<\/p>\n<p>\u00b7The 22403 Pondicherry \u2013 New Delhi Express train of 2.10.2025<\/p>\n<p>\u00b7The18237 Bilaspur-Amritsar Chhattishgarh Express of 8 to 11.10.2025<\/p>\n<p>\u00b7The 18507 Vishakhapatnam-Amritsar Express of 10 &amp; 11.10.2025<\/p>\n<p>.<strong>Trains to run via Agra Cantt. \u2013 Meetawali \u2013 Khurja \u2013 Meerut City<\/strong><\/p>\n<p>\u00b7The 14309 Ujjain \u2013 Dehradun Ujjani Express train of 8.10.2025<\/p>\n<p>\u00b7The 18477 Puri \u2013 Haridwar Utkal express train of 3 to 11.10.2025.<\/p>\n<p><em><strong>Trains to run via Kota \u2013 Rewari \u2013 Patel Nagar<\/strong><\/em><\/p>\n<p>\u00b7The 12431 Trivandrum Central \u2013 Hazrat Nizamuddin Rajdhani Express train of 8,10 &amp; 11.10.2025<\/p>\n<p>\u00b7The 22655 Trivandrum-Hazrat Nizamuddin Express train of 9.10.2025<\/p>\n<p>\u00b7The 22659 Kochuvelli \u2013 Dehradun Express train will be diverted to run via Kota \u2013 Rewari \u2013 Patel Nagar o\u00adn 11.10.2025<\/p>\n<p>\u00b7The 12907 Bandra Terminus \u2013 Hazrat Nizamuddin Maharashtra Sampark Kranti Express train of 5.10.2025<\/p>\n<p>\u00b7The 12487Kochuvelli-Dehradun Express of 11.10.2025<\/p>\n<p>.Trains to run via Mathura Jn. \u2013 Rewari \u2013 Asthal Bohar \u2013 Rohtak<\/p>\n<p>\u00b7The 12421 Hazoor Sahib Nanded \u2013 Amritsar Jn. Nanded Amritsar SuperFast Express train of 8.10.2025<\/p>\n<p>\u00b7The 13007 Howrah- Shriganganagar Udyan Abha Toofan express train of 8,9,10, &amp; 11.10.2025<\/p>\n<p>\u00b7The 12485Nanded \u2013Sriganganagar Express of 9.10.2025<\/p>\n<p><em><strong>Trains to run via Chanderia \u2013 Ajmer \u2013 Phulera \u2013 Ringus \u2013 Rewari<\/strong><\/em><\/p>\n<p>\u00b7The 12964 Udaipur \u2013 Hazrat Nizamuddin Mewar express train will be diverted to run via Chanderia \u2013 Ajmer \u2013 Phulera \u2013 Ringus \u2013 Rewari o\u00adn 8,9,10, &amp; 11.10.2025<\/p>\n<p>For more details please visit Norther Railway<\/p>\n<p>Here\u2019s a detailed breakdown of the <strong>diversion of trains on 9th to 11th October 2025<\/strong> due to <strong>non-interlocking works at Asaoti Station (Northern Railway)<\/strong> as per official and media reports:<\/p>\n<hr \/>\n<h2>Overview<\/h2>\n<p>Northern Railway conducted non-interlocking works at Asaoti Station (Delhi Division) from <strong>7\u201311 October 2025<\/strong>, as part of the construction of the <strong>fourth line between Tughlakabad and Palwal<\/strong>. These improvements were aimed at enhancing traffic capacity and reducing congestion.<\/p>\n<hr \/>\n<h2>Train Diversions (9\u201311 October 2025)<\/h2>\n<p>During this period, several long-distance express trains were <strong>diverted via alternate routes<\/strong> to avoid the affected section:<\/p>\n<ul>\n<li>Journeys re-routed via <strong>Meerut City \u2192 Khurja \u2192 Mitawali \u2192 Agra Cantt<\/strong> included:\n<ul>\n<li><strong>18238<\/strong> (Amritsar\u2013Bilaspur Express) \u2013 diverted 8\u201311 Oct<\/li>\n<li><strong>18478<\/strong> (Haridwar\u2013Puri Utkal Express) \u2013 diverted on 11 Oct<\/li>\n<li><strong>12688<\/strong> (Dehradun\u2013Madurai Superfast Express) \u2013 diverted on 9 Oct<\/li>\n<li><strong>12172<\/strong> (Haridwar\u2013Lokmanya Tilak Terminus Superfast Express) \u2013 diverted on 10 Oct<\/li>\n<li><strong>19326<\/strong> (Amritsar\u2013Indore Express) \u2013 diverted on 11 Oct<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>Summary Table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Date<\/th>\n<th>Key Diversions<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>9 Oct 2025<\/td>\n<td>12688 diverted via Meerut City\u2013Khurja\u2013Mitawali\u2013Agra Cantt<\/td>\n<\/tr>\n<tr>\n<td>10 Oct 2025<\/td>\n<td>12172 diverted along the same alternate route<\/td>\n<\/tr>\n<tr>\n<td>11 Oct 2025<\/td>\n<td>18238, 18478, 19326 diverted via the same alternate line<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>Practical Impact<\/h2>\n<p>These diversions ensured continuity of service while essential infrastructure upgrades were underway\u2014maintaining operational flow despite the engineering block.<\/p>\n<hr \/>\n<p>If you\u2019d like, I can also share details about <strong>cancellations<\/strong>, <strong>short-terminations<\/strong>, or <strong>passenger train disruptions<\/strong> during the same window. Just say the word!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NON-INTERLOCKING WORKING AT ASAOTI STATION FROM 07\/08.10.2025 To 11.10.2025 NORTHERN RAILWAY COMMENCES NON-INTERLOCKING WORKING AT ASAOTI STATION FROM 07\/08.10.2025 To 11.10.2025 IN CONNECTION WITH CONSTRUCTION OF FOURTH LINE TO EASE TRAFFIC CONGESTION CANCELLATION\/PARTIAL CANCELLATION\/DIVERSION\/REGULATION OF TRAINS RUNNING o\u00adn THE SECTION DUE TO SCHEDULED PRE-NON INTERLOCKING WORK FROM 26.09.2025 AND MAJOR NON-INTERLOCKING WORK FROM 07\/08.10.2025 To [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":14202,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[169,38,30,91],"tags":[168,74,29,78,383],"class_list":["post-4927","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-diversion-of-trains","category-irctc-news","category-northern-railway","category-railway-news","tag-diversion-of-trains","tag-irctc-news","tag-northern-railway","tag-railway-news","tag-trains-to-run-via-meerut-city-khurja-mitawali-agra-cantt"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=4927"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4927\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media\/14202"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=4927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=4927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=4927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}