{"id":4429,"date":"2025-08-02T06:13:41","date_gmt":"2025-08-02T06:13:41","guid":{"rendered":"https:\/\/railtravels.org\/?p=4429"},"modified":"2025-08-02T06:13:41","modified_gmt":"2025-08-02T06:13:41","slug":"noida-metro-rail-resuming-aqua-line-for-public-from-07-09-2020","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/noida-metro-rail-resuming-aqua-line-for-public-from-07-09-2020\/","title":{"rendered":"Noida Metro Rail Resume Aqua Line for Public from 07.09.2025"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Noida Metro Rail Resume Aqua Line for Public from 07.09.2025<\/strong><\/p>\n<p><strong>NMRC TO RESUME OPERATIONS WITH 15 MINUTES FREQUENCY AND REDUCED TIMINGS, PASSENGERS TO WEAR MASKS AND FOLLOW SOCIAL DISTANCING<\/strong><\/p>\n<p>Noida Metro Rail Corporation Ltd. (NMRC) is all set to resume its Aqua Line services in Unlock 4 from 7th September 2025 (Monday). Travelling in the Aqua Line will be a different experience for metro commuters as it will be mandatory for all passengers to wear masks and follow the rules of social distancing and other rules and regulations issued by the Government.<\/p>\n<p>In this regard, NMRC is making necessary preparations at all its stations and inside the trains to ensure that all passengers of the Aqua Line follow the guidelines laid down by the Government for prevention of the Covid 19 infection. The main objective of NMRC is to provide a safe travelling experience for its commuters with all specified safety measures and precautions to safeguard against spread of COVID-19.<\/p>\n<p>The measures being taken by NMRC are enumerated below:<\/p>\n<p><strong>A. Operations and Frequency<\/strong><\/p>\n<ul>\n<li>Metro services on Aqua Line will commence from 7th September 2025 (Monday).<\/li>\n<li>Initially NMRC will run trains with reduced operational timings i.e. 7 AM to 11 AM in the morning and 5 PM to 9 PM in the evening with a frequency of 15 minutes from Monday to Saturday.<\/li>\n<li>On Sundays the services will start from 8 AM to 11 AM and from 5 PM to 9 PM in the evenings.<\/li>\n<li>Temperature inside the trains will be maintained in the range of 24-30 degree Celsius.<\/li>\n<li>As of now, trains will stop at all the stations, However, based on the future notification, stations falling in containment zones will remain closed for commuters. Such changes will be informed to the commuters through public notice, announcement and updating the NMRC website and applications.<\/li>\n<\/ul>\n<p><strong>B. Cleaning and Sanitisation of Trains and Stations<\/strong><\/p>\n<ul>\n<li>Intensive cleaning and sanitization of station areas and the trains as a whole will be carried out daily during night hours.<\/li>\n<li>Passengers\u2019 contact area such as Call buttons of lifts, AFC gates, Handle belts of Escalators &amp; Staircases, POS machines etc. at Stations will be sanitized at regular intervals.<\/li>\n<\/ul>\n<p><strong>C. Passenger Screening and other Guidelines to be followed at the Stations<\/strong><\/p>\n<ul>\n<li>Only the passengers with face mask will be allowed.<\/li>\n<li>Every passenger will be screened by Thermal sensors.<\/li>\n<li>The limiting maximum temperature for travel permission will be 37.7 degree centigrade.<\/li>\n<li>Passengers having \u201cAarogya Setu\u201d app with Green status will be allowed.<\/li>\n<li>Persons entering NMRC premises will have to apply hand sanitizer after screening<\/li>\n<li>To ensure adequate Social distance, markings for standing the passengers have been made at 1 metre spacing at frisking zones, TOM counters and Platforms.<\/li>\n<li>Commuters should avoid touching the AFC Gates while scanning the QR tickets or Smart Cards.<\/li>\n<li>On escalators, a gap of at least one step should be maintained between two users.<\/li>\n<li>Generally, all lifts will be closed. However, in case of request for senior citizens &amp; physically challenged passengers, lift will be made available on request.<\/li>\n<li>Digital payments will be preferred.<\/li>\n<\/ul>\n<p><strong>D. Guidelines for travelling Inside the Trains<\/strong><\/p>\n<ul>\n<li>Passengers shall maintain adequate social distance. For this purpose, suitable markings have been made inside the coaches.<\/li>\n<li>Crowd inside the train as well as at station\/platform will be monitored through CCTV from the Control Rooms. If more crowd is are observed, entry at the station will be restricted.<\/li>\n<li>Passengers will be advised to refrain from touching any surface inside the metro stations or trains.<\/li>\n<\/ul>\n<p><strong>E. Entry \/ Exit at Stations.<\/strong><\/p>\n<ul>\n<li>At the following stations only one gate will be kept open for entry \/ exit, Sector \u2013 101, Sector- 81, NSEZ, Sector-83, Sector -137, Sector-142,Sector-143, Sector \u2013 144, Sector \u2013 145, Sector \u2013 146, Sector -147, Sector -148, Alpha -1, Delta \u2013 1 and GNIDA Office.<\/li>\n<li>At following 6 stations, both entrance gates will be kept open for commuters Sector \u2013 51, Sector \u201350, Sector \u201376, KP-II, Pari chowk, Depot Station .<\/li>\n<\/ul>\n<p><strong>F. Information to the Public in the form of Signages, Announcements and Digital Displays<\/strong><\/p>\n<ul>\n<li>For information and awareness of the Commuters, provision of suitable signages and announcements have been made available inside the stations and trains.<\/li>\n<\/ul>\n<p><strong>Ritu Maheshwari<\/strong><br \/>\n<strong>Managing Director<\/strong><br \/>\n<strong>Noida Metro Rail Corporation Ltd.<\/strong><\/p>\n<p><strong>NMRC STATEMENT ON RESUMING OPERATIONS<\/strong><\/p>\n<p>As per the latest guidelines issued by the Ministry of Home Affairs under Unlock-4, the <strong>Noida Metro Rail Corporation (NMRC) will be resuming its services on the Aqua Line for public from 7th September 2025 onwards<\/strong> in a caliberated manner.<\/p>\n<p>Also Read: <a href=\"https:\/\/www.reilsolar.com\/train\/metro-operations-to-resume-in-a-graded-manner-from-07-09-2020\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Metro Operations to Resume in a Graded Manner from 07.09.2025<\/strong><\/a><\/p>\n<p>Further details on the Metro functioning and its usage by the general public will be shared once the detailed SOP on Metros is issued by the Ministery of Housing and Urban Affairs (MoHUA) and the Uttar Pradesh Government in the next few days.<\/p>\n<p>When Noida Metro Rail update Metro Rail Time Table, Schedule, Route, Fare and Passenger Guidelines.<\/p>\n<p>We will update this page soon after the announcement of metro rail services.<\/p>\n<p>As of <strong>now (August 2025)<\/strong>, there is <strong>no official announcement<\/strong> that the <strong>Noida Metro\u2019s Aqua Line<\/strong> will resume services from <strong>7 September 2025<\/strong>\u2014primarily because the line has been <strong>running continuously<\/strong> under normal operations since early 2025. The widely circulated reports of a September\u20117 resumption refer to <strong>post\u2011COVID\u201119 restoration in 2025<\/strong>, not a future event<\/p>\n<hr \/>\n<h2>\ud83d\ude87 Current Aqua Line Status (as of mid\u20112025)<\/h2>\n<ul>\n<li>The <strong>Aqua Line (Sector\u00a051 to Depot)<\/strong> has been <strong>operational daily<\/strong> since January 2019, with <strong>no service suspension reported in 2025<\/strong>.<\/li>\n<li>Typical service hours: <strong>6:00\u202fAM to 10:00\u202fPM<\/strong> Monday\u2013Saturday; on <strong>Sundays<\/strong>, service starts at <strong>8:00\u202fAM<\/strong>. Peak hour headway is ~7\u00bd\u202fminutes (~10\u202fminutes off\u2011peak)<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83d\uddd3 Why \u201cSept 7\u201d Is Often Mentioned<\/h2>\n<ul>\n<li>In <strong>September 2025<\/strong>, NMRC <strong>resumed operations<\/strong> of the Aqua Line on <strong>7 September<\/strong>, following COVID\u2011related lockdowns. That date became notable but is <strong>not linked<\/strong> to a new restart in 2025.<\/li>\n<\/ul>\n<hr \/>\n<h2>\u2705 Summary<\/h2>\n<table>\n<thead>\n<tr>\n<th>Query<\/th>\n<th>Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Aqua Line resumption on 07\u201109\u20112025<\/td>\n<td>\u274c No official info found<\/td>\n<\/tr>\n<tr>\n<td>Aqua Line service active before and after date<\/td>\n<td>\u2705 Already in full operation<\/td>\n<\/tr>\n<tr>\n<td>Comparable past restart dates<\/td>\n<td>7 Sep 2025 (COVID\u2011era resumption)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\ud83e\udded If You&#8217;re Checking for Planned Service Changes<\/h2>\n<ul>\n<li>Keep an eye on the <strong>NMRC official press release page<\/strong> for updates on special schedules or extensions.<\/li>\n<li>Major projects underway include a <strong>2.6\u202fkm extension to Boraki<\/strong> (scheduled over the next 3 years) and a proposed <strong>17.4\u202fkm stretch from Sector 51 to Knowledge Park\u2011V<\/strong>\u2014beyond the current line<\/li>\n<li>Any changes in <strong>operating hours or passenger protocols<\/strong> are typically announced via NMRC\u2019s website or authority bulletins.<\/li>\n<\/ul>\n<hr \/>\n<p>Would you like me to <strong>monitor for any late-August updates<\/strong>, help you <strong>check NMRC\u2019s service advisory channel<\/strong>, or explain the <strong>upcoming extensions and their expected timelines<\/strong>?<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Noida Metro Rail Resume Aqua Line for Public from 07.09.2025 NMRC TO RESUME OPERATIONS WITH 15 MINUTES FREQUENCY AND REDUCED TIMINGS, PASSENGERS TO WEAR MASKS AND FOLLOW SOCIAL DISTANCING Noida Metro Rail Corporation Ltd. (NMRC) is all set to resume its Aqua Line services in Unlock 4 from 7th September 2025 (Monday). Travelling in the [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[88],"tags":[87],"class_list":["post-4429","post","type-post","status-publish","format-standard","hentry","category-metro-rail","tag-metro-rail"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=4429"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/4429\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=4429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=4429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=4429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}