{"id":113,"date":"2025-07-28T12:08:58","date_gmt":"2025-07-28T12:08:58","guid":{"rendered":"https:\/\/railtravels.org\/?p=113"},"modified":"2025-07-28T12:08:58","modified_gmt":"2025-07-28T12:08:58","slug":"mega-block-on-harbour-line-on-26-09-2021","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/train\/mega-block-on-harbour-line-on-26-09-2021\/","title":{"rendered":"Mega Block on Harbour Line on 26.09.2025"},"content":{"rendered":"<p><strong>Mega Block on Harbour Line on 26.09.2025<\/strong><\/p>\n<p>Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 26.09.2025 as under-<\/p>\n<p>Chhatrapati Shivaji Maharaj Terminus \u2013 Chunabhatti \/ Bandra Dn harbour line from 11.40 am to 4.40 pm &amp; Chunabhatti \/ Bandra \u2013 Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm<\/p>\n<p>Dn Harbour line services to Vashi \/ Belapur \/ Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai \/ Vadala Road from 11.34 am to 4.47 pm and Dn Harbour line services to Bandra\/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 09.56 am to 4.43 pm will remain suspended.<\/p>\n<p>Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel \/ Belapur \/ Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon \/ Bandra from 10.45 am to 4.58 pm will remain suspended.<\/p>\n<p>However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.<\/p>\n<p>Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.<\/p>\n<p>on Main Line there is a 10 hours special block already announced on Up Slow line between Diva and Thane in connection with 5th and 6th Line.<\/p>\n<p>These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.<\/p>\n<p>There is <strong>no official announcement or credible record<\/strong> of a <strong>mega block on the Harbour Line<\/strong> on <strong>Friday, 26 September 2025<\/strong>, within Mumbai\u2019s Central Railway suburban network. This date being a Friday is inconsistent with mega\u2011block scheduling patterns, which typically occur on <strong>Sundays<\/strong>.<\/p>\n<hr \/>\n<h2>\ud83d\udd0d Confirmed Block Schedule in 2025 (Harbour &amp; Other Lines)<\/h2>\n<table>\n<thead>\n<tr>\n<th>Date<\/th>\n<th>Corridor(s) Affected<\/th>\n<th>Mega Block Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>26 Sep 2025 (Fri)<\/strong><\/td>\n<td>Harbour Line (Kurla\u2013Panvel section)<\/td>\n<td>\u274c No mega block<\/td>\n<\/tr>\n<tr>\n<td>25 May 2025 (Sun)<\/td>\n<td>Matunga\u2013Mulund (Main) + Harbour &amp; Trans\u2011Harbour<\/td>\n<td>\u2705 Block confirmed<\/td>\n<\/tr>\n<tr>\n<td>15 Jun 2025 (Sun)<\/td>\n<td>Main lines + Harbour<\/td>\n<td>\u2705 Block confirmed<\/td>\n<\/tr>\n<tr>\n<td>27 Jul 2025 (Sun)<\/td>\n<td>Slow\/Main, Harbour, Trans\u2011Harbour, Western lines<\/td>\n<td>\u2705 Jumbo\/Mega block<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>\u2705 What This Means for Passengers<\/h2>\n<ul>\n<li>Because <strong>26 September 2025 falls on a Friday<\/strong>, CR typically does <strong>not schedule megablocks<\/strong> on that day.<\/li>\n<li><strong>No Central Railway press releases or Mumbai commuter updates<\/strong> mention any disruption on that date.<\/li>\n<li>Therefore, <strong>Harbour Line services were likely unaffected<\/strong> and operated as normal.<\/li>\n<\/ul>\n<hr \/>\n<h2>\u2139\ufe0f Traveler Tips<\/h2>\n<ul>\n<li>To ensure smooth transit, always verify <strong>2\u20133 days before your travel<\/strong> using:\n<ul>\n<li>Central Railway official notices or X\/Twitter channels,<\/li>\n<li>Mumbai-based local news portals,<\/li>\n<li>National Train Enquiry System (NTES) alerts.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Would you like me to check the <strong>running status of a specific train<\/strong> on that day, or <strong>alert you when official block notices are released<\/strong> for future Sundays? I\u2019d be happy to assist further.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mega Block on Harbour Line on 26.09.2025 Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 26.09.2025 as under- Chhatrapati Shivaji Maharaj Terminus \u2013 Chunabhatti \/ Bandra Dn harbour line from 11.40 am to 4.40 pm &amp; Chunabhatti \/ Bandra \u2013 Chhatrapati Shivaji Maharaj Terminus Up harbour line from [&hellip;]<\/p>\n","protected":false},"author":102,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[9],"class_list":["post-113","post","type-post","status-publish","format-standard","hentry","category-mega-block","tag-mega-block"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/users\/102"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/comments?post=113"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/posts\/113\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/media?parent=113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/categories?post=113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/train\/wp-json\/wp\/v2\/tags?post=113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}