{"id":8588,"date":"2022-07-25T14:34:45","date_gmt":"2022-07-25T14:34:45","guid":{"rendered":"https:\/\/irctcportal.in\/?p=8588"},"modified":"2022-07-25T14:34:45","modified_gmt":"2022-07-25T14:34:45","slug":"introduction-of-new-trains-between-madurai-theni","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/introduction-of-new-trains-between-madurai-theni\/","title":{"rendered":"Introduction of New Trains between Madurai-Theni"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Introduction of New Trains between Madurai-Theni<\/strong><\/p>\n<p><strong>GOVERNMENT OF INDIA<\/strong><br \/>\n<strong>MINISTRY OF RAILWAYS<\/strong><br \/>\n<strong>RAILWAY BOARD<\/strong><\/p>\n<p><strong>THE GENERAL MANAGER (OPTG)<\/strong><br \/>\n<strong>SOUTHERN RAILWAY \/ CHENNAI<\/strong><\/p>\n<p>FAX \/ POST COPY ISSUED ON 19.04.2022<\/p>\n<p>COPY TO: CPTM<br \/>\nSR\/ CHENNAI<\/p>\n<p>NO.2022\/CHG\/ 16\/SR\/15 (.) CONNECT CPTM SR\u2019S LETTER NO. T.454 \/ TT \/ REVISION \/ 2021-22 DATED 11.04.2022 REGARDING INTRODUCTION OF TRAINS FROM MADURAI TO ANDIPATTI ON THE NEWLY GAUGE CONVERTED MADURAI \u2013 BODINAYAKANUR AND BOARD\u2019S MESSAGE NO. A-1902 \/ 14 \/ 2020- PUNCTUALITY CELL-PART (4) DATED 16.03.2022 INTER-ALIA CONVEYING APPROVAL FOR RUNNING OF NEW SERVICES BETWEEN MADURAI AND ANDIPATTI (.) BOARD APPROVES THE PROPOSAL OF SOUTHERN RAILWAY FOR EXTENSION OF PASSENGER TRAIN BETWEEN ANDIPATTI AND TENI AS DETAILED BELOW, FROM AN EARLY CONVENIENT DATE (.)<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"133\">MADURAI to\u00a0 TENI PASSENGER<\/td>\n<td width=\"47\"><\/td>\n<td width=\"132\">STATION<\/td>\n<td width=\"38\"><\/td>\n<td width=\"132\">TENI to MADURAI\u00a0PASSENGER<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">08.30<\/td>\n<td width=\"47\">D<\/td>\n<td width=\"132\">MADURAI<\/td>\n<td width=\"38\">A<\/td>\n<td width=\"132\">19.35<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">08.44 \/ 08.45<\/td>\n<td width=\"47\">A \/ D<\/td>\n<td width=\"132\">VADAPALAN JI (H)<\/td>\n<td width=\"38\">A \/ D<\/td>\n<td width=\"132\">19.04 \/ 19.05<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">09.03 \/ 09.05<\/td>\n<td width=\"47\">A \/ D<\/td>\n<td width=\"132\">USILAMPATTI<\/td>\n<td width=\"38\">A \/ D<\/td>\n<td width=\"132\">18.45 \/ 18.47<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">09.18 \/ 09.20<\/td>\n<td width=\"47\">A \/ D<\/td>\n<td width=\"132\">ANDIPATTI<\/td>\n<td width=\"38\">A \/ D<\/td>\n<td width=\"132\">18.28 \/ 18.30<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">09.35<\/td>\n<td width=\"47\">A<\/td>\n<td width=\"132\">TENI<\/td>\n<td width=\"38\">D<\/td>\n<td width=\"132\">18.15<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">COMPOSITION<\/td>\n<td colspan=\"4\" width=\"350\">GS-5, SLR-2<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">PRIMARY MAINTENANCE<\/td>\n<td colspan=\"4\" width=\"350\">MADURAI, PFTR: USILAMPATTI<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>ENSURE COMPLIANCE AND ACTION ACCORDINGLY (.)<br \/>\nKUMAR \/ RAILWAYS (.)<\/p>\n<p>\u2014<\/p>\n<p>sd\/-<br \/>\n<strong>(VIVEK KUMAR SINHA)<\/strong><br \/>\n<strong>DY. DIRECTOR \/ COACHING<\/strong><br \/>\n<strong>RAILWAY BOARD<\/strong><\/p>\n<p>Source:<a href=\"https:\/\/indianrailways.gov.in\/railwayboard\/uploads\/directorate\/coaching\/Coaching_Circulars\/2022\/CC41.pdf\" target=\"_blank\" rel=\"noopener\">\u00a0https:\/\/indianrailways.gov.in\/<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Introduction of New Trains between Madurai-Theni GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD THE GENERAL MANAGER (OPTG) SOUTHERN RAILWAY \/ CHENNAI FAX \/ POST COPY ISSUED ON 19.04.2022 COPY TO: CPTM SR\/ CHENNAI NO.2022\/CHG\/ 16\/SR\/15 (.) CONNECT CPTM SR\u2019S LETTER NO. T.454 \/ TT \/ REVISION \/ 2021-22 DATED 11.04.2022 REGARDING INTRODUCTION OF TRAINS [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,15],"tags":[37,5,39,16,41],"class_list":["post-8588","post","type-post","status-publish","format-standard","hentry","category-new-time-table","category-new-trains","tag-introduction-of-new-trains","tag-irctc","tag-new-time-table","tag-new-trains","tag-new-trains-list"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/8588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=8588"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/8588\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=8588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=8588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=8588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}