{"id":852,"date":"2021-01-21T04:33:39","date_gmt":"2021-01-21T04:33:39","guid":{"rendered":"https:\/\/irctcportal.in\/?p=852"},"modified":"2021-01-21T04:33:39","modified_gmt":"2021-01-21T04:33:39","slug":"special-traffic-and-power-block-between-thane-and-mulund","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/special-traffic-and-power-block-between-thane-and-mulund\/","title":{"rendered":"Special Traffic and Power Block between Thane and Mulund"},"content":{"rendered":"<p><strong>Special Traffic and Power Block between Thane and Mulund 23rd January 2021, 24th January 2021 and 25th January 2021<\/strong><\/p>\n<p>Central Railway will operate a special traffic and power block on all 6 lines between Thane and Mulune stations for launching of girders of Kopri Road Over Bridge by Road crane on 23.1.2021 \/ 24.1.2021 (Saturday \/ Sunday night) and 24.1.2021 \/ 25.1.2021 (Sunday \/ Monday night). The block will be operated from 01.00 hrs to 04.30 hrs on both nights.<\/p>\n<p><strong>Due to this the train running pattern on both days will be as under:<\/strong><\/p>\n<p><strong>Cancellation of Mail \/ Express special trains<\/strong><\/p>\n<ul>\n<li>Train No. 07058 Secunderabad-Mumbai Special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 07317 Hubballi-LTT Special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 07057 Mumbai-Secunderabad Special JCO 24.1.2021 and 25.1.2021<\/li>\n<li>Train No. 07318 LTT-Hubballi Special JCO 24.1.2021 and 25.1.2021<\/li>\n<\/ul>\n<p><strong>Short termination of Mail \/ Express special trains<\/strong><\/p>\n<ul>\n<li>Train No. 02116 Solapur-Mumbai Special JCO 23.1.2021 and 24.1.2021 will be short terminated at Pune<\/li>\n<li>Train No. 01112 Madgaon-Mumbai special JCO 23.1.2021 and 24.1.2021 will be short terminated at Panvel<\/li>\n<\/ul>\n<p><strong>Short origination of Mail \/ Express special trains<\/strong><\/p>\n<ul>\n<li>Train No. 01301 Mumbai-KSR Bengaluru special JCO 24.1.2021 and 25.1.2021 will originate from Pune instead of CSMT Mumbai<\/li>\n<li>Train No. 01113 Mumbai-Madgaon Special JCO 24.1.2021 and 25.1.2021 will originate from Panvel instead of CSMT Mumbai<\/li>\n<\/ul>\n<p><strong>Following special trains will be short terminated at Dadar \/ Thane and Kalyan<\/strong><\/p>\n<ul>\n<li>Train No. 01020 Bhubaneshwar-Mumbai special JCO 22.1.2021 and 23.1.2021<\/li>\n<li>Train No. 02541 Gorakhpur-LTT special JCO 22.1.2021 and 23.1.2021<\/li>\n<li>Train No. 02810 Howrah-Mumbai special JCO 22.1.2021 and 23.1.2021<\/li>\n<li>Train No. 01134 Mangaluru Junction-Mumbai special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 02702 Hyderabad-Mumbai special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 01140 Gadag-Mumbai special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 01142 Adilabad-Mumbai special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 05267 Raxaul-LTT special JCO 23.1.2021<\/li>\n<li>Train No. 02106 Gondia-Mumbai special JCO 23.1.2021 and 24.1.2021<\/li>\n<li>Train No. 02138 Firozpur-Mumbai special JCO 22.1.2021 and 23.1.2021<\/li>\n<li>Train No. 02190 Nagpur-Mumbai special JCO 23.1.2021 and 24.1.2021<\/li>\n<\/ul>\n<p><strong>Following trains will arrive destination behind schedule<\/strong><\/p>\n<ul>\n<li>Train No. 02620 Mangaluru Central-LTT special JCO 23.1.2021 and 24.1.2021 will arrive LTT at 07.05 hrs instead of 06.35 hrs.<\/li>\n<li>Train No. 01004 Sawantwadi Road-Dadar special JCO 23.1.2021 and 24.1.2021 will arrive Dadar at 07.10 hrs instead of 06.40 hrs.<\/li>\n<\/ul>\n<p><strong>Suburban Services:<\/strong><\/p>\n<ul>\n<li>Suburban services between Kurla and Thane will remain cancelled from 00.30 hrs to 05.30 hrs on 24.1.2021 and 25.1.2021<\/li>\n<\/ul>\n<p>Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this infrastructure block.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Special Traffic and Power Block between Thane and Mulund 23rd January 2021, 24th January 2021 and 25th January 2021 Central Railway will operate a special traffic and power block on all 6 lines between Thane and Mulune stations for launching of girders of Kopri Road Over Bridge by Road crane on 23.1.2021 \/ 24.1.2021 (Saturday [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[21,137,7,138,139],"class_list":["post-852","post","type-post","status-publish","format-standard","hentry","category-central-railway","tag-central-railway","tag-power-block","tag-railway","tag-traffic-block","tag-traffic-cum-power-block"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=852"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/852\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=852"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=852"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}