{"id":8439,"date":"2022-07-25T12:22:15","date_gmt":"2022-07-25T12:22:15","guid":{"rendered":"https:\/\/irctcportal.in\/?p=8439"},"modified":"2022-07-25T12:22:15","modified_gmt":"2022-07-25T12:22:15","slug":"internship-in-railway-2022","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/internship-in-railway-2022\/","title":{"rendered":"Internship in Railway 2022"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Railway Internship 2022<\/strong><\/p>\n<p>Internship in Railway 2022 | Railway Student Internship 2022 | Railway Internship 2022 | Railway Internship for Engineering Students 2022<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"638\"><strong>East Coast Railway<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"638\">Forwarding \/ Recommending Letter to be addressed in favour of Principal Chief Personnel Officer, Rail Sadan, Chandrasekharpur, Bhubaneswar.<\/p>\n<p>Internship Programme of Ministry of Railways for the Session 2022-23<\/p>\n<p>Last date for Submitting Application is 06.05.2022 (17:00 hrs)<\/p>\n<p>Note: College ID card is mandatory to apply for internship and other documents can be submitted by the candidate at the time of reporting at the Department \/ Division\u00a0 \/ Unit for training<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Salient Features of the Internship Programme in Railway<\/strong><\/p>\n<p>Salient Features of the Internship Programme in East Coast Railway Terms &amp; Conditions of Internship<\/p>\n<p>The internship is neither a job nor any such assurance for a job in the Indian Railways.<\/p>\n<ul>\n<li>Maximum duration of the internship will be 2 months.<\/li>\n<li>Location of internship shall be the prerogative of the administration.<\/li>\n<li>No remuneration is payable during the internship.<\/li>\n<li>Boarding and lodging arrangements will be borne by the interns themselves.<\/li>\n<li>Interested and eligible students who are pursuing Graduation\/Post Graduation in Engineering &amp; MBA can pursue internship in following disciplines.<br \/>\na) Civil<br \/>\nb) Electrical<br \/>\nc) Mechanical<br \/>\nd) Electronics<br \/>\ne) Computer Science\/IT<br \/>\nf) Financial Management, Human Resource Management, Logistics, Materials Management, Project Management and other technical matters pertaining to Railways.<\/li>\n<li>Selection criteria: Selection for internship will be based on merit only.<\/li>\n<li>Students pursuing undergraduate course in Engineering should have completed at least two years of study in Degree and should have a consistently good academic record.<\/li>\n<li>Students pursuing MBA should have obtained a First Class Graduate Degree and should have successfully completed one year of the course.<\/li>\n<li>All interested and eligible students are requested to apply through online internship portal only. All communications regarding allotment\/rejection will be made through e-mail only.<\/li>\n<li>Following documents (Self attested) are required to be uploaded in the portal.<br \/>\na) Covering \/Forwarding letter from the HOD.<br \/>\nb) Duly filled in Annexure-II (Application for the Internship Programme)<br \/>\nc) CV<br \/>\nd) Identity Card issued by the Institute.<\/li>\n<li>On selection, students are required to produce hard copies of the uploaded documents for verification. If any discrepancies are found during verification his\/her selection will be liable to be rejected.<\/li>\n<\/ul>\n<p><strong>Internship Programme<em>\u00a0Form 2022\u00a0 PDF FILE \u2013\u00a0<a href=\"https:\/\/www.reilsolar.com\/irctc\/wp-content\/uploads\/sites\/13\/2022\/07\/Railway-Internship-Form.pdf\" target=\"_blank\" rel=\"noopener\">Click Here<\/a><\/em><\/strong><\/p>\n<p><strong>List of Topic \u2013 Internship Programme in Railway<\/strong><\/p>\n<p><strong>ANNEXURE-1<\/strong><\/p>\n<p><strong>LIST OF TOPICS<\/strong><\/p>\n<p>1. Adoption of Technology on Indian Railways<br \/>\na) Study on CTC (Centralised Traffic Control), CBTC (Communication Based Train Control)<br \/>\nb) Maintenance issues related to Electronic interlocking<br \/>\nc) Reliability improvement of DAC (Digital Axle Counter)<\/p>\n<p>2. Role of signaling in throughput enhancement<\/p>\n<p>3. Railway Communication<\/p>\n<p>4. Data Analytics<\/p>\n<p>5. Material presentation<\/p>\n<p>6. Vendor selection methods such as Analytical hierarchical processing, Data envelopment technique, Taguchi Loss Method etc.<\/p>\n<p>7. Virtual prototyping<\/p>\n<p>8. Statistical quality control<\/p>\n<p>9. Green Procurement<\/p>\n<p>10. 3PL &amp; Vendor managed inventory<\/p>\n<p>11. Reverse logistics &amp; buyback<\/p>\n<p>12. RFID<\/p>\n<p>13. Braille printing &amp; 3D printing<\/p>\n<p>14. Intelligent material<\/p>\n<p>15. Carbon pricing<\/p>\n<p>16. Recruitment procedures on Indian Railways<\/p>\n<p>17. Manpower Planning on Indian Railways<\/p>\n<p>18. Staff Welfare Schemes on Indian Railways<\/p>\n<p>19. In House Training on Indian Railways<\/p>\n<p>20. Channels of Promotion on Indian Railways<\/p>\n<p>21. Industrial Relations on Indian Railways<\/p>\n<p>22. High Speed Train Projects<\/p>\n<p>23. Regulatory Framework for Railways<\/p>\n<p>24. PPP Projects Appraisal<\/p>\n<p>25. Financial viability and Revenue model for execution of New line between Biyavra Rajgarh-Bhopal (104 km)<\/p>\n<p>26. Financial viability and Revenue model for execution of Gauge Conversion between Miyagam-Dabhoi-Samalya (96 km)<\/p>\n<p>27. Financial viability and Revenue model for execution of Doubling between Surendra Nagar-Rajkot (115.17 km)<\/p>\n<table class=\"csdtable\" style=\"width: 56.6686%;height: 120px\">\n<tbody>\n<tr style=\"height: 48px\">\n<td style=\"height: 48px\" width=\"343\"><strong>Salient Features of the Internship Programme<\/strong><\/td>\n<td style=\"height: 48px\" width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/04\/10\/salient-features-of-the-internship-programme-in-railway\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 24px\">\n<td style=\"height: 24px\" width=\"343\"><strong>List of Topic \u2013 Internship Programme<\/strong><\/td>\n<td style=\"height: 24px\" width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/04\/10\/list-of-topic-internship-programme-in-railway\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 24px\">\n<td style=\"height: 24px\" width=\"343\"><strong>Internship Programme Form<\/strong><\/td>\n<td style=\"height: 24px\" width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/wp-content\/uploads\/sites\/13\/2022\/07\/Railway-Internship-Form.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr style=\"height: 24px\">\n<td style=\"height: 24px\" width=\"343\"><strong>Internship in Indian Railway<\/strong><\/td>\n<td style=\"height: 24px\" width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/railway-internship-2020\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Source: https:\/\/eastcoastrail.indianrailways.gov.in\/<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Railway Internship 2022 Internship in Railway 2022 | Railway Student Internship 2022 | Railway Internship 2022 | Railway Internship for Engineering Students 2022 East Coast Railway Forwarding \/ Recommending Letter to be addressed in favour of Principal Chief Personnel Officer, Rail Sadan, Chandrasekharpur, Bhubaneswar. Internship Programme of Ministry of Railways for the Session 2022-23 Last [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[90],"tags":[557,77],"class_list":["post-8439","post","type-post","status-publish","format-standard","hentry","category-railway-news","tag-internship-programme-in-railways","tag-railway-news"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/8439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=8439"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/8439\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=8439"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=8439"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=8439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}