{"id":8186,"date":"2021-12-17T03:59:12","date_gmt":"2021-12-17T03:59:12","guid":{"rendered":"https:\/\/irctcportal.in\/?p=8186"},"modified":"2021-12-17T03:59:12","modified_gmt":"2021-12-17T03:59:12","slug":"infrastructure-block-on-thane-diva-slow-corridor-for-5th-and-6th-line-work","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/infrastructure-block-on-thane-diva-slow-corridor-for-5th-and-6th-line-work\/","title":{"rendered":"Infrastructure Block on Thane \u2013 Diva Slow corridor for 5th and 6th Line Work"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Infrastructure Block on Thane \u2013 Diva Slow corridor for 5th and 6th Line Work<\/strong><\/p>\n<p><strong>18 hours Infrastructure Block on Thane \u2013 Diva Slow corridor for 5th and 6th line work<\/strong><\/p>\n<p>Central Railway will operate a special infrastructure block between Thane and Diva for commissioning of Thane \u2013 Diva 5th and 6th lines and crossovers at Diva (North) for diversion of trains on 19.12.2021. The block will be operated on Up and Dn slow lines from 08.00 hrs of 19.12.2021(Sunday) to 02.00 hrs of 20.12.2021 (Monday). Due to this the train running pattern will be as under:<\/p>\n<p><strong>Suburban Services<\/strong><\/p>\n<p>Up slow \/ semi \u2013 fast services to Chhatrapati Shivaji Maharaj Terminus leaving Kalyan from 07.47 hrs to 23.52 hrs will be diverted on Up fast line between Diva and Mulund skipping halt at Mumbra and Kalva; further re \u2013 diverted on Up slow line at Mulund station and arrive destination 10 minutes behind schedule<\/p>\n<p>Down slow\/semi \u2013 fast services from Chhatrapati Shivaji Maharaj Terminus leaving Mulund at 07.42 hrs to 01.15 hrs (of 20.12.2021) will be diverted on Down fast line between Mulund and Diva stations skipping halt at Kalva and Mumbra; further re \u2013 diverted on Down slow line at Diva station and arrive destination 10 minutes behind schedule.<\/p>\n<p>Suburban services will not be available at Kalva and Mumbra stations during the block period.<\/p>\n<p>Passengers boarding from Kopar and Thakurli stations are advised to board trains from Dombivali and Kalyan respectively.<\/p>\n<p>Railway Administration has arranged to run buses in coordination with Thane and Kalyan \u2013 Dombivali Transport Undertakings for the benefit of passengers.<\/p>\n<p><strong>Cancellation of Express trains Journey Commencing on 18.12.2021 (Saturday)<\/strong><\/p>\n<ul>\n<li>Train No. 12112 Amravati \u2013 Mumbai Express<\/li>\n<li>Train No. 17611 Nanded \u2013 Mumbai Express<\/li>\n<li>Train No. 11030 Kolhapur \u2013 Mumbai Koyna Express<\/li>\n<\/ul>\n<p><strong>Cancellation of Express trains Journey Commencing on 19.12.2021 (Sunday)<\/strong><\/p>\n<ul>\n<li>Train No. 11007 \/ 11008 Mumbai \u2013 Pune \u2013 Mumbai Deccan Express<\/li>\n<li>Train No. 12109 \/12110 Mumbai \u2013 Manmad \u2013 Mumbai Panchvati Express<\/li>\n<li>Train No. 12071 \/ 12072 Mumbai \u2013 Jalna \u2013 Mumbai Janshatabdi Express<\/li>\n<li>Train No. 11401 Mumbai \u2013 Adilabad Nandigram Express<\/li>\n<li>Train No. 12123 \/12124 Mumbai \u2013 Pune \u2013 Mumbai Deccan Queen<\/li>\n<li>Train No. 12111 Mumbai \u2013 Amravati Express<\/li>\n<li>Train No. 11139 Mumbai \u2013 Gadag Express<\/li>\n<li>Train No. 17612 Mumbai \u2013 Nanded Express<\/li>\n<li>Train No. 11029 Mumbai \u2013 Kolhapur Koyna Express<\/li>\n<\/ul>\n<p><strong>Cancellation of Express trains Journey Commencing on 20.12.2021(Monday)<\/strong><\/p>\n<ul>\n<li>Train No. 11402 Adilabad \u2013 Mumbai Nandigram Express<\/li>\n<li>Train No. 11140 Gadag \u2013 Mumbai Express<\/li>\n<\/ul>\n<p><strong>Short termination \/ Short origination of Express trains<\/strong><\/p>\n<ul>\n<li>Train No. 17317 Hubballi \u2013 Dadar Express JCO 18.12.2021 will be short terminated at Pune and<\/li>\n<li>Train No. 17318 Dadar \u2013 Hubballi Express JCO 19.12.2021 will short originate from Pune.<\/li>\n<\/ul>\n<p>Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this infrastructure block.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Infrastructure Block on Thane \u2013 Diva Slow corridor for 5th and 6th Line Work 18 hours Infrastructure Block on Thane \u2013 Diva Slow corridor for 5th and 6th line work Central Railway will operate a special infrastructure block between Thane and Diva for commissioning of Thane \u2013 Diva 5th and 6th lines and crossovers at [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[21],"class_list":["post-8186","post","type-post","status-publish","format-standard","hentry","category-central-railway","tag-central-railway"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/8186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=8186"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/8186\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=8186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=8186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=8186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}