{"id":7044,"date":"2019-04-10T12:33:02","date_gmt":"2019-04-10T12:33:02","guid":{"rendered":"https:\/\/irctcportal.in\/?p=7044"},"modified":"2019-04-10T12:33:02","modified_gmt":"2019-04-10T12:33:02","slug":"salient-features-of-the-internship-programme-in-railway","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/salient-features-of-the-internship-programme-in-railway\/","title":{"rendered":"SALIENT FEATURES OF THE INTERNSHIP PROGRAMME IN RAILWAY"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>SALIENT FEATURES OF THE INTERNSHIP PROGRAMME IN RAILWAY<\/strong><\/p>\n<p><strong>SALIENT FEATURES OF THE INTERNSHIP PROGRAMME IN EAST COAST RAILWAY TERMS &amp; CONDITIONS OF INTERNSHIP<\/strong><\/p>\n<p><strong>The internship is neither a job nor any such assurance for a job in the Indian Railway<\/strong>s.<\/p>\n<ul>\n<li><strong>Maximum duration of the internship will be 2 months.<\/strong><\/li>\n<li><strong>Location of internship shall be the prerogative of the administration.<\/strong><\/li>\n<li><strong>No remuneration is payable during the internship.<\/strong><\/li>\n<li><strong>Boarding and lodging arrangements will be borne by the interns themselves.<\/strong><\/li>\n<li><strong>Interested and eligible students who are pursuing Graduation\/Post Graduation in Engineering &amp; MBA can pursue internship in following disciplines.<\/strong><br \/>\n<strong>a) Civil<\/strong><br \/>\n<strong>b) Electrical<\/strong><br \/>\n<strong>c) Mechanical<\/strong><br \/>\n<strong>d) Electronics<\/strong><br \/>\n<strong>e) Computer Science\/IT<\/strong><br \/>\n<strong>f) Financial Management, Human Resource Management, Logistics, Materials Management, Project Management and other technical matters pertaining to Railways.<\/strong><\/li>\n<li><strong>Selection criteria: Selection for internship will be based on merit only.<\/strong><\/li>\n<li><strong>Students pursuing undergraduate course in Engineering should have completed at least two years of study in Degree and should have a consistently good academic record.<\/strong><\/li>\n<li><strong>Students pursuing MBA should have obtained a First Class Graduate Degree and should have successfully completed one year of the course.<\/strong><\/li>\n<li><strong>All interested and eligible students are requested to apply through online internship portal only. All communications regarding allotment\/rejection will be made through e-mail only.<\/strong><\/li>\n<li><strong>Following documents (Self attested) are required to be uploaded in the porta<\/strong>l.<br \/>\n<strong>a) Covering \/Forwarding letter from the HOD.<\/strong><br \/>\n<strong>b) Duly filled in Annexure-II (Application for the Internship Programme)<\/strong><br \/>\n<strong>c) CV<\/strong><br \/>\n<strong>d) Identity Card issued by the Institute.<\/strong><\/li>\n<li><strong>On selection, students are required to produce hard copies of the uploaded documents for verification. If any discrepancies are found during verification his\/her selection will be liable to be rejected.<\/strong><\/li>\n<\/ul>\n<p>Source: https:\/\/eastcoastrail.indianrailways.gov.in\/<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"343\"><strong>SALIENT FEATURES OF THE INTERNSHIP PROGRAMME<\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/04\/10\/salient-features-of-the-internship-programme-in-railway\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"343\"><strong>LIST OF TOPIC \u2013 INTERNSHIP PROGRAMME<\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/04\/10\/list-of-topic-internship-programme-in-railway\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"343\"><strong>INTERNSHIP PROGRAMME<em> FORM<\/em><\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/wp-content\/uploads\/sites\/13\/2021\/11\/Railway-Internship-2019-Form.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"343\"><strong>INTERNSHIP IN INDIAN RAILWAY<\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/railway-internship-2020\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>SALIENT FEATURES OF THE INTERNSHIP PROGRAMME IN RAILWAY SALIENT FEATURES OF THE INTERNSHIP PROGRAMME IN EAST COAST RAILWAY TERMS &amp; CONDITIONS OF INTERNSHIP The internship is neither a job nor any such assurance for a job in the Indian Railways. Maximum duration of the internship will be 2 months. Location of internship shall be the [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[711],"tags":[557,77],"class_list":["post-7044","post","type-post","status-publish","format-standard","hentry","category-train-news","tag-internship-programme-in-railways","tag-railway-news"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/7044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=7044"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/7044\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=7044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=7044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=7044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}