{"id":7039,"date":"2019-04-10T12:26:20","date_gmt":"2019-04-10T12:26:20","guid":{"rendered":"https:\/\/irctcportal.in\/?p=7039"},"modified":"2019-04-10T12:26:20","modified_gmt":"2019-04-10T12:26:20","slug":"list-of-topic-internship-programme-in-railway","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/list-of-topic-internship-programme-in-railway\/","title":{"rendered":"LIST OF TOPIC \u2013 INTERNSHIP PROGRAMME IN RAILWAY"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>LIST OF TOPIC \u2013 INTERNSHIP PROGRAMME IN RAILWAY<\/strong><\/p>\n<p><strong>ANNEXURE-1<\/strong><\/p>\n<p><strong>LIST OF TOPICS<\/strong><\/p>\n<p>1. Adoption of Technology on Indian Railways<br \/>\na) Study on CTC (Centralised Traffic Control), CBTC (Communication Based Train Control)<br \/>\nb) Maintenance issues related to Electronic interlocking<br \/>\nc) Reliability improvement of DAC (Digital Axle Counter)<\/p>\n<p>2. Role of signaling in throughput enhancement<\/p>\n<p>3. Railway Communication<\/p>\n<p>4. Data Analytics<\/p>\n<p>5. Material presentation<\/p>\n<p>6. Vendor selection methods such as Analytical hierarchical processing, Data envelopment technique, Taguchi Loss Method etc.<\/p>\n<p>7. Virtual prototyping<\/p>\n<p>8. Statistical quality control<\/p>\n<p>9. Green Procurement<\/p>\n<p>10. 3PL &amp; Vendor managed inventory<\/p>\n<p>11. Reverse logistics &amp; buyback<\/p>\n<p>12. RFID<\/p>\n<p>13. Braille printing &amp; 3D printing<\/p>\n<p>14. Intelligent material<\/p>\n<p>15. Carbon pricing<\/p>\n<p>16. Recruitment procedures on Indian Railways<\/p>\n<p>17. Manpower Planning on Indian Railways<\/p>\n<p>18. Staff Welfare Schemes on Indian Railways<\/p>\n<p>19. In House Training on Indian Railways<\/p>\n<p>20. Channels of Promotion on Indian Railways<\/p>\n<p>21. Industrial Relations on Indian Railways<\/p>\n<p>22. High Speed Train Projects<\/p>\n<p>23. Regulatory Framework for Railways<\/p>\n<p>24. PPP Projects Appraisal<\/p>\n<p>25. Financial viability and Revenue model for execution of New line between Biyavra Rajgarh-Bhopal (104 km)<\/p>\n<p>26. Financial viability and Revenue model for execution of Gauge Conversion between Miyagam-Dabhoi-Samalya (96 km)<\/p>\n<p>27. Financial viability and Revenue model for execution of Doubling between Surendra Nagar-Rajkot (115.17 km)<\/p>\n<table class=\"csdtable\">\n<tbody>\n<tr>\n<td width=\"343\"><strong>SALIENT FEATURES OF THE INTERNSHIP PROGRAMME<\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/04\/10\/salient-features-of-the-internship-programme-in-railway\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"343\"><strong>LIST OF TOPIC \u2013 INTERNSHIP PROGRAMME<\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/04\/10\/list-of-topic-internship-programme-in-railway\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"343\"><strong>INTERNSHIP PROGRAMME<em> FORM<\/em><\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/wp-content\/uploads\/sites\/13\/2021\/11\/Railway-Internship-2019-Form.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"343\"><strong>INTERNSHIP IN INDIAN RAILWAY<\/strong><\/td>\n<td width=\"114\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/railway-internship-2020\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CLICK HERE<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>LIST OF TOPIC \u2013 INTERNSHIP PROGRAMME IN RAILWAY ANNEXURE-1 LIST OF TOPICS 1. Adoption of Technology on Indian Railways a) Study on CTC (Centralised Traffic Control), CBTC (Communication Based Train Control) b) Maintenance issues related to Electronic interlocking c) Reliability improvement of DAC (Digital Axle Counter) 2. Role of signaling in throughput enhancement 3. Railway [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[711],"tags":[557,710,77],"class_list":["post-7039","post","type-post","status-publish","format-standard","hentry","category-train-news","tag-internship-programme-in-railways","tag-railway-new","tag-railway-news"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/7039","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=7039"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/7039\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=7039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=7039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=7039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}