{"id":6885,"date":"2020-02-12T08:45:21","date_gmt":"2020-02-12T08:45:21","guid":{"rendered":"https:\/\/irctcportal.in\/?p=6885"},"modified":"2020-02-12T08:45:21","modified_gmt":"2020-02-12T08:45:21","slug":"railway-budget-2020-tamil-nadu-railway-budget-2020-for-kerala","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/railway-budget-2020-tamil-nadu-railway-budget-2020-for-kerala\/","title":{"rendered":"Railway Budget 2022 Tamil Nadu \u2013 Railway Budget 2022 for kerala"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Railway Budget 2020 Tamil Nadu \u2013 Railway Budget 2020 for kerala<\/strong><\/p>\n<p><strong>Highlights of proposed Budget FY 20-21<\/strong><\/p>\n<p><strong>Important Achievements regarding New Line, Gauge Conversion &amp; Doubling Projects during FY 19-20 (upto Jan\u201920) and Highlights of proposed Budget FY 20-21<\/strong><\/p>\n<p><strong>Kerala:<\/strong><\/p>\n<p><strong>Proposed Budget outlay FY 20-21 for infrastructure &amp; safety works falling fully\/partly in the state:<\/strong><\/p>\n<p><strong>85% more outlay in FY 20-21 w.r.t average annual outlay during 2009-14 (Rs.688 Cr\/ Rs.372 Cr.)<\/strong><\/p>\n<p><strong>Tamil Nadu:<\/strong><\/p>\n<p><strong>Projects (falling partly\/fully in the state) included in Budget Booklet 2020-21 (against Umbrella work of 2019-20):<\/strong><\/p>\n<p><strong>06 Projects of total 826 Km length, costing Rs. 8501 Cr. have been included, as per below details:<\/strong><\/p>\n<p><strong>Doubling of Katpadi \u2013 Villupuram of Length 160.1 Km, Costing Rs.1601 Cr<\/strong><\/p>\n<p><strong>Doubling of Salem \u2013 Karur- Dindigul of Length 160 Km, Costing Rs.1600 Cr<\/strong><\/p>\n<p><strong>Doubling of Erode \u2013 Karur of Length 65 Km, Costing Rs.650 Cr.<\/strong><\/p>\n<p><strong>Doubling of Dharmavaram \u2013 Pakala \u2013 Katpadi of Length 290 Km, Costing Rs.2900 Cr.<\/strong><\/p>\n<p><strong>Doubling of Hosur \u2013 Omalur of Length 147 Km, Costing Rs.1470 Cr<\/strong><\/p>\n<p><strong>Doubling of Chennai Beach \u2013 Chennai Egmore of Length 4.3 Km, Costing Rs.279.8 Cr.<\/strong><\/p>\n<p><strong>Proposed Budget outlay FY 20-21 for infrastructure &amp; safety works falling fully\/partly in the state:<\/strong><\/p>\n<ul>\n<li><strong>220% more outlay in FY 20-21 w.r.t average annual outlay during 2009-14 (Rs.2812 Cr\/ Rs.879 Cr.)<\/strong><\/li>\n<\/ul>\n<\/div>\n<footer class=\"entry-footer\">\n<p class=\"entry-meta\">\n<\/footer>\n","protected":false},"excerpt":{"rendered":"<p>Railway Budget 2020 Tamil Nadu \u2013 Railway Budget 2020 for kerala Highlights of proposed Budget FY 20-21 Important Achievements regarding New Line, Gauge Conversion &amp; Doubling Projects during FY 19-20 (upto Jan\u201920) and Highlights of proposed Budget FY 20-21 Kerala: Proposed Budget outlay FY 20-21 for infrastructure &amp; safety works falling fully\/partly in the state: [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[118],"class_list":["post-6885","post","type-post","status-publish","format-standard","hentry","category-railway","tag-railway-budget"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/6885","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=6885"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/6885\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=6885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=6885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=6885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}