{"id":6800,"date":"2019-01-03T07:57:15","date_gmt":"2019-01-03T07:57:15","guid":{"rendered":"https:\/\/irctcportal.in\/?p=6800"},"modified":"2019-01-03T07:57:15","modified_gmt":"2019-01-03T07:57:15","slug":"new-railway-projects-lohardaga-to-korba-via-gumla","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/new-railway-projects-lohardaga-to-korba-via-gumla\/","title":{"rendered":"New Railway Projects Lohardaga to Korba via Gumla"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>New Railway Projects\u00a0Lohardaga to Korba via Gumla<\/strong><\/p>\n<p><strong>Construction of Railway from Lohardaga to Gumala<\/strong><\/p>\n<p><strong>GOVERNMENT OF INDIA<\/strong><br \/>\n<strong>MINISTRY OF RAILWAYS<\/strong><\/p>\n<p><strong>RAJYA SABHA<\/strong><br \/>\nQUESTION NO 1902<br \/>\nANSWERED ON 28.12.2018<\/p>\n<p><strong>Construction of railway from Lohardaga to Gumala<\/strong><\/p>\n<p><strong>1902 Shri Samir Oraon<\/strong><br \/>\nWill the Minister of RAILWAYS be pleased to state :-<br \/>\n(a) whether any project for constructing railway line from Lohardaga to Gumala (Manjhatoli border of Chhattisgarh) in Jharkhand is under consideration; and<\/p>\n<p>(b) if so, whether any proposal is under consideration to include this line in the next railway budget?<br \/>\nANSWER<\/p>\n<p><strong>MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI RAJEN GOHAIN)<\/strong><\/p>\n<p>(a) &amp; (b): A survey for a new line from Lohardaga to Korba via Gumla (326 Km) has been sanctioned in December 2018 and preliminary survey work has been taken up.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>New Railway Projects\u00a0Lohardaga to Korba via Gumla Construction of Railway from Lohardaga to Gumala GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAJYA SABHA QUESTION NO 1902 ANSWERED ON 28.12.2018 Construction of railway from Lohardaga to Gumala 1902 Shri Samir Oraon Will the Minister of RAILWAYS be pleased to state :- (a) whether any project for constructing [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[49,7],"class_list":["post-6800","post","type-post","status-publish","format-standard","hentry","category-railway","tag-new-railway-projects","tag-railway"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/6800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=6800"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/6800\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=6800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=6800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=6800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}