{"id":660,"date":"2021-02-18T15:54:00","date_gmt":"2021-02-18T15:54:00","guid":{"rendered":"https:\/\/irctcportal.in\/?p=660"},"modified":"2021-02-18T15:54:00","modified_gmt":"2021-02-18T15:54:00","slug":"mega-block-on-21-02-2021","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/mega-block-on-21-02-2021\/","title":{"rendered":"Mega Block on 2023"},"content":{"rendered":"<p><strong>Mega Block On 21.2.2023<\/strong><\/p>\n<p><strong>Mega Block on 21.02.2023 (Sunday)<\/strong><\/p>\n<p>Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on 21st February 2021<\/p>\n<p><strong>Main Line \u2013 Matunga \u2013 Mulund Up &amp; Dn fast lines from 11.05 am to 04.05 pm<\/strong><\/p>\n<p>During the block period, Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai will be diverted on Dn slow line, will halt at their scheduled halts and arrive destination 15 minutes behind schedule.<\/p>\n<p>Up fast services arriving Chhatrapati Shivaji Maharaj Terminus Mumbai will be diverted on Up slow line, will halt at their scheduled halts and arrive destination 15 minutes behind schedule.<\/p>\n<ul>\n<li><strong>Mumbai Local Train (CR and WR) Latest Time Table pdf download \u2013 <a href=\"https:\/\/www.reilsolar.com\/irctc\/mumbai-local-train-time-table\/\" target=\"_blank\" rel=\"noopener\">Click Here<\/a><\/strong><\/li>\n<\/ul>\n<p><strong>Harbour Line \u2013 Kurla \u2013 Vashi Up &amp; Dn harbour lines from 11.10 am to 04.10 pm<\/strong><\/p>\n<p>During the block period, Dn Harbour line services to Vashi \/ Belapur \/ Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel \/ Belapur \/ Vashi will remain suspended<\/p>\n<p>However, Special services will run between Chhatrapati Shivaji Maharaj Terminus-Kurla and Vashi-Panvel sections during the block period.<\/p>\n<p>Harbour line passengers are permitted to travel via Main Line and Transharbour line from 10.00 am to 4.30 pm during block period.<\/p>\n<p>These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mega Block On 21.2.2023 Mega Block on 21.02.2023 (Sunday) Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on 21st February 2021 Main Line \u2013 Matunga \u2013 Mulund Up &amp; Dn fast lines from 11.05 am to 04.05 pm During the block period, Dn fast services leaving Chhatrapati Shivaji [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,8],"tags":[21,31,32,9,33,34],"class_list":["post-660","post","type-post","status-publish","format-standard","hentry","category-central-railway","category-mega-block","tag-central-railway","tag-central-railway-mega-block-time-table","tag-harbour-line-mega-block-schedule","tag-mega-block","tag-mega-block-harbour-line","tag-mega-block-on-sunday"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=660"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/660\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}