{"id":6476,"date":"2019-11-20T15:25:26","date_gmt":"2019-11-20T15:25:26","guid":{"rendered":"https:\/\/irctcportal.in\/?p=6476"},"modified":"2019-11-20T15:25:26","modified_gmt":"2019-11-20T15:25:26","slug":"doubling-of-yeshwantpur-channasandra-railway-line-project","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/doubling-of-yeshwantpur-channasandra-railway-line-project\/","title":{"rendered":"Doubling of Yeshwantpur-Channasandra Railway Line Project"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Doubling of Yeshwantpur-Channasandra Railway Line Project<\/strong><\/p>\n<p><strong>GOVERNMENT OF INDIA<\/strong><br \/>\n<strong>MINISTRY OF RAILWAYS<\/strong><\/p>\n<p><strong>LOK SABHA<\/strong><\/p>\n<p>UNSTARRED QUESTION NO: 544<\/p>\n<p>ANSWERED ON: 20.11.2019<\/p>\n<p><strong>Doubling of Yeshwantpur Channasandra Railway Line Project<\/strong><\/p>\n<p><strong>P. C. Mohan<\/strong><br \/>\nWill the Minister of RAILWAYS be pleased to state:-<\/p>\n<p>(a) the details of doubling of Yeshwantpur-Channasandra railway line project in Bengaluru and the time by which the project is likely to be completed; and<br \/>\n(b) the details and present status of the 48 kilometre Baiyappanahalli-Hosur track work?<\/p>\n<p>ANSWER \u2013 MINISTER OF RAILWAYS AND COMMERCE &amp; INDUSTRY (SHRI PIYUSH GOYAL)<\/p>\n<p>(a) The doubling work of Yeshwantpur-Channasandra railway line project with electrification for a length of 21.7 Km has been sanctioned at a cost of Rs 330 Crores. The work is assigned to Rail Infrastructure Company (Karnataka) Limited (K-RIDE), a Joint Venture Company of Government of Karnataka and Ministry of Railways for execution on 09.09.2019. K-RIDE is gearing up to take up this project. The estimated time line for completion of this project is 2-3 years from now.<\/p>\n<p>(b) The doubling work of Baiyappanahalli-Hosur railway line project with electrification for a length of 48 Km has been sanctioned at a cost of\u00a0 Rs.449 Crores. The work is assigned to Rail Infrastructure Company (Karnataka) Limited (K-RIDE), a Joint Venture Company of Government of Karnataka and Ministry of Railways for execution on 09.09.2019. K-RIDE is gearing up to take up this project.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Doubling of Yeshwantpur-Channasandra Railway Line Project GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO: 544 ANSWERED ON: 20.11.2019 Doubling of Yeshwantpur Channasandra Railway Line Project P. C. Mohan Will the Minister of RAILWAYS be pleased to state:- (a) the details of doubling of Yeshwantpur-Channasandra railway line project in Bengaluru and the time [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[48,49,7],"class_list":["post-6476","post","type-post","status-publish","format-standard","hentry","category-railway","tag-new-railway-line","tag-new-railway-projects","tag-railway"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/6476","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=6476"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/6476\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=6476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=6476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=6476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}