{"id":5514,"date":"2018-08-12T15:25:19","date_gmt":"2018-08-12T15:25:19","guid":{"rendered":"https:\/\/irctcportal.in\/?p=5514"},"modified":"2018-08-12T15:25:19","modified_gmt":"2018-08-12T15:25:19","slug":"model-sop-2018","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/model-sop-2018\/","title":{"rendered":"Model SOP 2023"},"content":{"rendered":"<div class=\"entry-content\">\n<h3><strong><em>Model SOP 2023<\/em><\/strong><\/h3>\n<p><strong>Model Schedule of Powers 2023<\/strong><\/p>\n<p><strong>GOVERNMENT OF INDIA<\/strong><br \/>\n<strong>MINISTRY OF RAILWAYS<\/strong><br \/>\n<strong>RAILWAY BOARD<\/strong><\/p>\n<table class=\"mytable\">\n<tbody>\n<tr>\n<td width=\"211\"><strong>Railway Board Model SOP 2019<\/strong><\/td>\n<td width=\"84\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2019\/01\/16\/model-sop-2019\/\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>No. 2018\/Trans\/01\/Policy<\/p>\n<p>New Delhi, Dated: 24.7.2018<\/p>\n<p>The General Manager, All Indian Railways\/PUs, NF(C), CORE<br \/>\nThe DG\/RDSO\/Lucknow, DG\/NAIR<br \/>\nCAOs, DMW\/Patiala, COFMOW\/NDLS, RWP\/Bela, IROAF<\/p>\n<p>Sub:\u00a0<strong>Model Schedule of Powers 2023<\/strong><\/p>\n<p>Ref: This office letter No 2017\/Trans\/01\/Policy dated 26.10.2017<\/p>\n<p>Vide reference above, Model Schedule of Powers (SOP) was issued in October, 2017.<\/p>\n<p>2. The document has been revised with the approval of Board (FC &amp; CRB) and \u201cModel SOP 2018\u201d is being issued. It supersedes the Model SOP of October 2017. A copy of the Model SOP 2018 has been uploaded on website http:\/\/www.indianrailwavs.gov.in\/railwavboard\/ for implementation.<\/p>\n<p>3. This issues with the concurrence of Associate Finance of Transformation Cell.<\/p>\n<p>Kindly acknowledge receipt and ensure compliance.<\/p>\n<p>Sd\/-<br \/>\n<strong>(Jeetendra Singh)<\/strong><br \/>\n<strong>Executive Director\/ Transformation<\/strong><\/p>\n<p>Source: http:\/\/www.indianrailways.gov.in<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"301\"><strong>Eastern Railway Model\u00a0\u00a0 Schedule of Power (As on 17.12.2018)<\/strong><\/td>\n<td width=\"84\"><a href=\"https:\/\/www.reilsolar.com\/irctc\/2018\/12\/19\/eastern-railway-model-sop-2018\/\" target=\"_blank\" rel=\"noopener\"><strong>Click Here<\/strong><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Click Here :\u00a0<a href=\"https:\/\/www.reilsolar.com\/irctc\/wp-content\/uploads\/sites\/13\/2021\/12\/Indian-Railway-Mmodel-SOP-2018.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Railway Board Letter No.2018\/ Trans\/ 01\/Policy dated 24.07.2018 on\u00a0Model SOP-2018<\/strong><\/a><\/p>\n<p>Download :\u00a0<a href=\"http:\/\/www.indianrailways.gov.in\/railwayboard\/uploads\/directorate\/Transformation_Cell\/Circulars\/Model%20SOP%202018.pdf\" target=\"_blank\" rel=\"noopener\"><strong>Model SOP -2018 (pdf file)<\/strong><\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Model SOP 2023 Model Schedule of Powers 2023 GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD Railway Board Model SOP 2019 Click Here No. 2018\/Trans\/01\/Policy New Delhi, Dated: 24.7.2018 The General Manager, All Indian Railways\/PUs, NF(C), CORE The DG\/RDSO\/Lucknow, DG\/NAIR CAOs, DMW\/Patiala, COFMOW\/NDLS, RWP\/Bela, IROAF Sub:\u00a0Model Schedule of Powers 2023 Ref: This office letter No [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51,6,79],"tags":[50,7,78],"class_list":["post-5514","post","type-post","status-publish","format-standard","hentry","category-ministry-of-railways","category-railway","category-railway-board","tag-ministry-of-railways","tag-railway","tag-railway-board"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/5514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=5514"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/5514\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=5514"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=5514"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=5514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}