{"id":4663,"date":"2020-07-21T07:16:17","date_gmt":"2020-07-21T07:16:17","guid":{"rendered":"https:\/\/irctcportal.in\/?p=4663"},"modified":"2020-07-21T07:16:17","modified_gmt":"2020-07-21T07:16:17","slug":"miraj-londa-railway-project-recent-details-gadag-hotgi-double-line-project","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/miraj-londa-railway-project-recent-details-gadag-hotgi-double-line-project\/","title":{"rendered":"Miraj-Londa Railway Project Recent Details | Gadag-Hotgi Double Line Project"},"content":{"rendered":"<div class=\"entry-content\">\n<p><strong>Miraj-Londa Railway Project Recent Details | Gadag-Hotgi Double Line Project<\/strong><\/p>\n<p><strong>SHRI SURESH ANGADI, HON\u2019BLE MINISTER OF STATE OF RAILWAYS REVIEWS LONDA-MIRAJ AND GADAG-HOTGI DOUBLING PROJECT<\/strong><\/p>\n<p>Shri Suresh Angadi, Hon\u2019ble Minister of State of Railways conducted a review meeting with General Managers and other officials of South Western Railway, Central Railway and South Central Railway through Video Conference on 17.07.2020.<\/p>\n<p>During the meeting, Shri Angadi reviewed the progress of Miraj-Londa and Gadag-Hotgi double line project.<\/p>\n<p>The 186 Km of Londa-Miraj doubling project is being executed in 7 phases. In Phase-I, 16 Km of doubling between Ghataprabha and Chikkodi Road has been completed and commissioned during December, 2019.<\/p>\n<p>In Phase-II, the doubling of 31 Km between Chikkodi Road-Raybag-Chinchli-Kudachi, in Phase-III, 25 Km of Khanapur-Desur-Belagavi doubling, in Phase-IV 25 Km of Londa-Khanapur doubling, in Phase-V, 27 Km of Belagavi-Suldhal doubling, in Phase-VI, 30 Km of Suldhal- Ghataprabha doubling, in Phase-VII, 33 Km of Kudachi-Miraj doubling works are being executed. Due to COVID-19, work has slowed down from March, 2020. Work recommenced from last week of June, 2020 with limited number of manpower, so as to maintain social distancing.<\/p>\n<p>Shri Suresh Angadi instructed the Officials to expedite this double line project along with electrification and to complete in two years.<\/p>\n<p>Road Over Bridge works at Belagavi and Raybag area were also reviewed and Hon\u2019ble MoSR instructed to complete the works in time bound manner.<\/p>\n<p>Shri Suresh Angadi also reviewed the 284 Km doubling work of Gadag-Hotgi. Already 115 Km of doubling has been completed. Another 33 Km between Lachyan and Hotgi doubling is also expected to be commissioned shortly. Once this 33 Km is commissioned a total 148 Km of line from Hotgi to Wandal will become double line. Shri Suresh Angadi instructed the Officials to complete the remaining double line work by 2022.<\/p>\n<p>Shri Ajay Kumar Singh, GM\/SWR; hri K.C. Swami, Chief Administrative Officer, Construction; Shri B.G. Mallya, Principal Chief Electrical Engineer; Shri Prem Narayan, Chief Engineer, Construction and Shri T.V. Bhushan, Chief Engineer, Construction, Hubballi from South Western Railway have attended the Video Conference.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Miraj-Londa Railway Project Recent Details | Gadag-Hotgi Double Line Project SHRI SURESH ANGADI, HON\u2019BLE MINISTER OF STATE OF RAILWAYS REVIEWS LONDA-MIRAJ AND GADAG-HOTGI DOUBLING PROJECT Shri Suresh Angadi, Hon\u2019ble Minister of State of Railways conducted a review meeting with General Managers and other officials of South Western Railway, Central Railway and South Central Railway through [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,90],"tags":[48,49,7,77],"class_list":["post-4663","post","type-post","status-publish","format-standard","hentry","category-railway","category-railway-news","tag-new-railway-line","tag-new-railway-projects","tag-railway","tag-railway-news"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/4663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=4663"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/4663\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=4663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=4663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=4663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}