{"id":4636,"date":"2021-10-10T06:58:04","date_gmt":"2021-10-10T06:58:04","guid":{"rendered":"https:\/\/irctcportal.in\/?p=4636"},"modified":"2021-10-10T06:58:04","modified_gmt":"2021-10-10T06:58:04","slug":"mega-block-on-10-october-2021","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/mega-block-on-10-october-2021\/","title":{"rendered":"Mega Block on 10 October 2022"},"content":{"rendered":"<p><strong>MEGA BLOCK ON 10.10.2021 (Sunday)<\/strong><\/p>\n<p><strong>Mega Block on 10.10.2021<\/strong><\/p>\n<p>Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 10.10.2021.<\/p>\n<p><strong>Thane \u2013 Diva Up and Dn slow lines from 11.00 am to 4.00 pm<\/strong><\/p>\n<p>Dn Slow \/ Semi fast services leaving Mulund from 10.43 am to 3.46 pm will be diverted on Dn fast line between Mulund and Diva stations, halting at Thane and Diva stations and will arrive destination 10 minutes behind schedule.<\/p>\n<p>Up Slow \/ Semi fast services leaving Kalyan from 10.37 am to 3.41 pm will be diverted on Up fast line between Diva and Mulund stations, halting at Diva and Thane stations and further will be re \u2013 diverted on Up Slow line at Mulund station and will arrive destination 10 minutes behind schedule.<\/p>\n<p>All Up and Dn slow services leaving \/ arriving Chhatrapati Shivaji Maharaj Terminus between 11.00 am to 5.00 pm will arrive \/ depart 10 minutes behind schedule.<\/p>\n<p><strong>Panvel \u2013 Vashi Up and Dn harbour lines from 11.05 am to 4.05 pm (Belapur \u2013 Kharkopar services not affected; Nerul \u2013 Kharkopar services remain cancelled)<\/strong><\/p>\n<p>Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel \/ Belapur leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.03 am to 3.16 pm will remain suspended.<\/p>\n<p>Up Transharbour line services towards Thane leaving Panvel from 9.01 am to 3.53 pm and Dn Transharbour line services towards Panvel leaving Thane from 10.01 am to 3.20 pm will remain suspended.<\/p>\n<p>Dn line services for Kharkopar leaving Nerul from 10.15 am to 2.45 pm and Up line services for Nerul leaving Kharkopar from 10.45 am to 3.15 pm will remain cancelled.<\/p>\n<p>Local train services between Belapur and Kharkopar will run as per schedule during the block period.<\/p>\n<p>Special local trains will run on Chhatrapati Shivaji Maharaj Terminus Mumbai \u2013 Vashi section during the block period.<\/p>\n<p>Trans \u2013 harbour line services will be available between Thane \u2013 Vashi \/ Nerul stations during the block period.<\/p>\n<p>These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.<\/p>\n<p>Source: https:\/\/cr.indianrailways.gov.in\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MEGA BLOCK ON 10.10.2021 (Sunday) Mega Block on 10.10.2021 Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 10.10.2021. Thane \u2013 Diva Up and Dn slow lines from 11.00 am to 4.00 pm Dn Slow \/ Semi fast services leaving Mulund from 10.43 [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[9],"class_list":["post-4636","post","type-post","status-publish","format-standard","hentry","category-mega-block","tag-mega-block"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/4636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=4636"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/4636\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=4636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=4636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=4636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}