{"id":113,"date":"2021-09-25T12:08:58","date_gmt":"2021-09-25T12:08:58","guid":{"rendered":"https:\/\/irctcportal.in\/?p=113"},"modified":"2021-09-25T12:08:58","modified_gmt":"2021-09-25T12:08:58","slug":"mega-block-on-harbour-line-on-26-09-2021","status":"publish","type":"post","link":"https:\/\/www.reilsolar.com\/irctc\/mega-block-on-harbour-line-on-26-09-2021\/","title":{"rendered":"Mega Block on Harbour Line on 26.09.2022"},"content":{"rendered":"<p><strong>Mega Block on Harbour Line on 26.09.2021<\/strong><\/p>\n<p>Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 26.09.2021 as under-<\/p>\n<p>Chhatrapati Shivaji Maharaj Terminus \u2013 Chunabhatti \/ Bandra Dn harbour line from 11.40 am to 4.40 pm &amp; Chunabhatti \/ Bandra \u2013 Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm<\/p>\n<p>Dn Harbour line services to Vashi \/ Belapur \/ Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai \/ Vadala Road from 11.34 am to 4.47 pm and Dn Harbour line services to Bandra\/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 09.56 am to 4.43 pm will remain suspended.<\/p>\n<p>Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel \/ Belapur \/ Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon \/ Bandra from 10.45 am to 4.58 pm will remain suspended.<\/p>\n<p>However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.<\/p>\n<p>Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.<\/p>\n<p>on Main Line there is a 10 hours special block already announced on Up Slow line between Diva and Thane in connection with 5th and 6th Line.<\/p>\n<p>These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mega Block on Harbour Line on 26.09.2021 Central Railway will operate Mega Block on Harbour line for carrying out maintenance work on 26.09.2021 as under- Chhatrapati Shivaji Maharaj Terminus \u2013 Chunabhatti \/ Bandra Dn harbour line from 11.40 am to 4.40 pm &amp; Chunabhatti \/ Bandra \u2013 Chhatrapati Shivaji Maharaj Terminus Up harbour line from [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[9],"class_list":["post-113","post","type-post","status-publish","format-standard","hentry","category-mega-block","tag-mega-block"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=113"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/posts\/113\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/categories?post=113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/tags?post=113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}