{"id":952,"date":"2025-01-05T05:06:22","date_gmt":"2025-01-05T05:06:22","guid":{"rendered":"https:\/\/irctcportal.in\/?page_id=952"},"modified":"2025-01-05T05:06:22","modified_gmt":"2025-01-05T05:06:22","slug":"binkadakatti-harlapur-railway-double-track-is-ready","status":"publish","type":"page","link":"https:\/\/www.reilsolar.com\/irctc\/binkadakatti-harlapur-railway-double-track-is-ready\/","title":{"rendered":"Binkadakatti \u2013 Harlapur Railway Double Track Is Ready"},"content":{"rendered":"<p><strong>Binkadakatti \u2013 Harlapur Railway Double Track Is Ready<\/strong><\/p>\n<p><strong>23 KM OF DOUBLING BETWEEN BINKADAKATTI \u2013 HARLAPUR READY FOR SAFETY INSPECTION<\/strong><\/p>\n<p>Statutory inspection &amp; speed trial for opening of newly laid double line of 23 Km between Binkadakatti and Harlapur will be held on 11.01.2020 by Commissioner of Railway Safety, Southern Region. The inspection of this section in Gadag District of Hubbali Division of SWR will be conducted by Shri K Manoharan, CRS.<\/p>\n<p>Shri KC Swamy, CAO\/CN, Shri P K Kshatriya, CPM\/RVNL, Bengaluru, Shri Arvind Malkhede, DRM\/UBL and other senior officers will accompany CRS during the inspection. The 23 Km section is having 4 stations and Railway officials will do motor trolley inspection before running trains at maximum permissible speed. After completion of speed trial and inspection of safety equipment at stations on this section, CRS will consider the proposal for opening this line for passenger traffic.<\/p>\n<p><strong>The 23 Km section is part of the 352 Km doubling of Hosapete \u2013 Tinaighat \u2013 Vaso Section. Prior to this, 178 Km of doubling has been commissioned so far and a further 16 Km between Unkal \u2013 Navalur \u2013 Dharwad is targeted to be commissioned by March 2020.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Binkadakatti \u2013 Harlapur Railway Double Track Is Ready 23 KM OF DOUBLING BETWEEN BINKADAKATTI \u2013 HARLAPUR READY FOR SAFETY INSPECTION Statutory inspection &amp; speed trial for opening of newly laid double line of 23 Km between Binkadakatti and Harlapur will be held on 11.01.2020 by Commissioner of Railway Safety, Southern Region. The inspection of this [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-952","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/pages\/952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=952"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/pages\/952\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}