{"id":4867,"date":"2025-01-11T08:12:55","date_gmt":"2025-01-11T08:12:55","guid":{"rendered":"https:\/\/irctcportal.in\/?page_id=4867"},"modified":"2025-01-11T08:12:55","modified_gmt":"2025-01-11T08:12:55","slug":"north-eastern-railway-ner-pink-book","status":"publish","type":"page","link":"https:\/\/www.reilsolar.com\/irctc\/north-eastern-railway-ner-pink-book\/","title":{"rendered":"North Eastern Railway (NER) Pink Book"},"content":{"rendered":"<p><strong>North Eastern Railway (NER) Pink Book<\/strong><\/p>\n<h4><strong>North Eastern Railway (NER) Pink Book \u2013\u00a0<a href=\"https:\/\/drive.google.com\/file\/d\/1D2jlnOvKBV6P7SGjwI9mMTsoL27GfiAG\/view\" target=\"_blank\" rel=\"noopener\">Click Here to Download<\/a><\/strong><\/h4>\n<p>1 Western Uttar Pradesh as (Mathura, Kasganj, Farrukhabad, Kanpur etc.). 2 Northern Uttar Pradesh &amp; Awadh as (Kathgodam, Bareilly, Pilibhit, Lakhimpur Kheri Lucknow, Gonda, Ayodhya etc.). 3 All purvanchal region &amp; North western Bihar as (Gorakhpur, Jaunpur, Azamgarh, Varanasi, Allahabad, Mau, Chapra etc.)<\/p>\n<h4><a href=\"https:\/\/www.reilsolar.com\/irctc\/railway-pink-book-2021-22\/\" target=\"_blank\" rel=\"noopener\"><strong>Railway Pink Book 2021-22 | Indian Railway Pink Book 2021-22<\/strong><\/a><\/h4>\n<p><strong>Rail Budget for Bihar 2021-2022<\/strong><\/p>\n<p>Allocation of Railway Budget for Bihar for the year 2021-22, for building world-class rail infrastructure.<\/p>\n<p><strong>On Going Railway Projects<\/strong><\/p>\n<ul>\n<li><strong>57 New Railway Line, Gauge Conversion and Doubling Projects Costing Rs. 74,880 Crore for 5,267 Kilo Meter<\/strong><\/li>\n<li><strong>Total Outlay 2021-22 is Rs. 5,150 Crore<\/strong><\/li>\n<li><strong>Total Budget allocation in 2021-22 is 355% more than the Average of 2009-14.<\/strong><\/li>\n<\/ul>\n<p>Note: Projects falling fully and partly in the state<\/p>\n<p><strong>Rail Budget for Uttar Pradesh 2021-2022<\/strong><\/p>\n<p>Allocation of Railway Budget for Uttar Pradesh for the year 2021-22, for building world-class rail infrastructure.<\/p>\n<p><strong>On Going Railway Projects<\/strong><\/p>\n<ul>\n<li>83 New Railway Line, Gauge Conversion and Doubling Projects Costing Rs. 96,697 Crore for 7,143 Kilo Meter<\/li>\n<li>Total Outlay 2021-22 is Rs. 12,696 Crore<\/li>\n<li>Total Budget allocation in 2021-22 is 1,045% more than the Average of 2009-14.<\/li>\n<\/ul>\n<p>Note: Projects falling fully and partly in the state<\/p>\n","protected":false},"excerpt":{"rendered":"<p>North Eastern Railway (NER) Pink Book North Eastern Railway (NER) Pink Book \u2013\u00a0Click Here to Download 1 Western Uttar Pradesh as (Mathura, Kasganj, Farrukhabad, Kanpur etc.). 2 Northern Uttar Pradesh &amp; Awadh as (Kathgodam, Bareilly, Pilibhit, Lakhimpur Kheri Lucknow, Gonda, Ayodhya etc.). 3 All purvanchal region &amp; North western Bihar as (Gorakhpur, Jaunpur, Azamgarh, Varanasi, [&hellip;]<\/p>\n","protected":false},"author":95,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4867","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/pages\/4867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/comments?post=4867"}],"version-history":[{"count":0,"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/pages\/4867\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.reilsolar.com\/irctc\/wp-json\/wp\/v2\/media?parent=4867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}